Summarize the project requirements and other assumptions

Assignment Help Management Information Sys
Reference no: EM131957592

Assignment 1: VoIP Part 1 (Work Breakdown Structure)

This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.

Overview

As the project manager for an IT department, you have been assigned to manage the project of deploying a new VoIP phone system to the company's campus. The campus consists of three (3) different buildings, each with twenty to fifty (20 to 50) workstations. The project must be completed in ninety (90) calendar days starting on November 1.

Deliverable 1: Summary (MS Word or open source equivalent)

1. Write a one to two (1-2) page summary document in which you:

a. Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).

b. Define a work breakdown structure and describe the methodology behind constructing one.

Deliverable 2: WBS (MS Project or open source equivalent)

2. Use Microsoft Project to create a WBS which:

a. Contains at least five (5) main tasks, one for each of the PMBOK® process areas.

b. Contains at least sixty (60) line items distributed in ten (10) or more work packages.

c. Contains Work Breakdown Structure Code for each task.

d. Presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.

Deliverable one (1) of your assignment must follow these formatting requirements:

• Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

• Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

Assignment 2: VoIP Part 2 (Gantt and PERT Charts)

Update the Microsoft Project file you created in Assignment 3: VoIP Part 2 (Work Breakdown Structure) with the following changes:

• Set property values to denote progress in at least fifteen (15) of the line items.

• Set properties so that at least one (1) of the main tasks is behind schedule.

• Create a Gantt chart for your project.

• Take a screenshot of the Gantt chart which can later be inserted into your written paper.

• Create a PERT diagram that identifies the critical path.

• Take a screenshot of the PERT chart which can later be inserted into your written paper.

Write a two to three (2-3) page paper in which you:

1. Compare and contrast the information that one receives from a Gantt chart, versus that of a PERT diagram.

2. Examine the advantages of using a Gantt chart over a PERT chart and vice versa. Determine when it is appropriate to use one over the other. Justify your response.

3. Assess the importance of the critical path in project management.

4. Insert the screenshots of the Gantt and PERT charts you created based on the provided criteria. Elaborate on the status of the VoIP deployment project based on the updated information. Note: The graphical representations do not count toward the overall page requirement.

5. Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Your assignment must follow these formatting requirements:

• Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

• Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

• Import completed diagrams, charts, or screenshots into the Word document before the paper is submitted.

Reference no: EM131957592

Questions Cloud

Structural plan stress analysis problem : 49325 CAMD - Computer-Aided Mechanical Design - Structural plan stress analysis problem - Computer-Aided Mechanical Design
Examine the effect of bring your own device : Examine the effect of Bring Your Own Device (BYOD) to the IT infrastructure with regard to security, IT support, knowledge.
What would be the county tax on a property : Go to the given attached website. What would be the county tax on a property in Dorchester subdivision assessed at $240,000?
How anyone could be more productive by using the given apps : Describe the presentation to show how anyone could be more productive by using these apps either professionally or personally.
Summarize the project requirements and other assumptions : Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).
Analyze what steps might you take to gain the cooperation : Analyze what steps might you take to gain the cooperation of the third party after the policy has been initiated.
Explain how the old information system handles the functions : Explain how the old information system handles the functions you mentioned, the problems that occur, and why your information system will handle things better.
List the count of unique room numbersin the res detail table : List the customer ID, first name, and last name for all customers for whom no phone number exists. Sort the output by customer ID.
Complete the missing areas of the statement of cash flows : Complete the missing areas of the Statement of Cash Flows for the period ending December 31, 20.

Reviews

Write a Review

Management Information Sys Questions & Answers

  Information technology and the changing fabric

Illustrations of concepts from organizational structure, organizational power and politics and organizational culture.

  Case study: software-as-a-service goes mainstream

Explain the questions based on case study. case study - salesforce.com: software-as-a-service goes mainstream

  Research proposal on cloud computing

The usage and influence of outsourcing and cloud computing on Management Information Systems is the proposed topic of the research project.

  Host an e-commerce site for a small start-up company

This paper will help develop internet skills in commercial services for hosting an e-commerce site for a small start-up company.

  How are internet technologies affecting the structure

How are Internet technologies affecting the structure and work roles of modern organizations?

  Segregation of duties in the personal computing environment

Why is inadequate segregation of duties a problem in the personal computing environment?

  Social media strategy implementation and evaluation

Social media strategy implementation and evaluation

  Problems in the personal computing environment

What is the basic purpose behind segregation of duties a problem in the personal computing environment?

  Role of it/is in an organisation

Prepare a presentation on Information Systems and Organizational changes

  Perky pies

Information systems to adequately manage supply both up and down stream.

  Mark the equilibrium price and quantity

The demand schedule for computer chips.

  Visit and analyze the company-specific web-site

Visit and analyze the Company-specific web-site with respect to E-Commerce issues

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd