Stormwater monitoring

Assignment Help Civil Engineering
Reference no: EM13133284

1. An analysis of dredged sediments from a stormwater retention basin revealed a high concentration (in mg/kg) of the heavy metals Fe, Al, Zn, Cu, Pb, Cr, Ni and Cd. The retention basin receives runoff from a watershed that recently has seen an increase in industrial activity. A study is to be conducted with the following objectives: (i) quantify the upstream generation of heavy metals and (ii) assess the settleability of heavy metals through an investigation of the partitioning of heavy metals into different size fractions. Develop a monitoring programme to study storm runoff from a sub-catchment within the watershed having an area of 80 ha of which 85% is industrial and 10% road. The sampling point is a large U-drain 2m in depth and 3 m wide.

Your monitoring programme should include the following considerations:

(i) Equipment selection - provide details of the equipment you would use and give reasons for your choice.

(ii) Suggest a possible sampling plan for the hydrograph shown (Q is in m3 /min).

1904_Laboratory analysis methodology.png

(iii) Provide details of the sampling protocol to be adopted (sample bottles, sample preservation, field preservation, blanks, ...)

(iv) Procedure for size fractionating the samples.

(v) Laboratory analysis methodology to be used. Give details on the standard methods, instrument and detection limits. Standard methods for heavy metals analysis exist, you should look them up. You should choose a method that best suits the concentrations that you are expecting.

(vi) Of the heavy metals listed, which would you expect is least likely to be anthropogenic in origin? Why?

Verified Expert

Reference no: EM13133284

Questions Cloud

Vector spaces and scalar multiplication : Let V be the space of all functions from R to R. It was stated in the discussion session that this is a vector space over R. Prove axioms (VS1)=For all x,y, x+y=y+x (commutativity of addition),
Determine range of values containing of population : Determine the range of values containing 50% of the population of x. From a large sampling (N>5000), we find that x has a mean value of 5.2 units and a standard deviation of 1.0 units.
What is the percent yield : N2 + 3H2 -> 2NH3 . 28.0 grams of N2 and 5.04 grams of H2 are reacted, producing 17.8 grams of NH3. What is the percent yield?
Vitamin b6 is needed in the metabolism of amino acids : Vitamin b6 is needed in the metabolism of amino acids. When it binds to an enzyme it forms a complex with the e-amino group of lysine, which is a primary amine.
Stormwater monitoring : Laboratory analysis methodology to be used. Give details on the standard methods, instrument and detection limits. Standard methods for heavy metals analysis exist
Expenses are not usually separated into variable and fixed : When finished goods inventory decreases during a period, a manufacturing company's absorption costing net operating income for that period will usually be greater than its variable costing net operating income.
Compute the mix and quantity variances : Renee's Rings manufactures college rings. Two models are produced: The Spirit model with a budgeted price of $660 and a standard variable cost of $360.
Vertex of a parabola-maximum height : An arrow is accidentally shot into the air. The formula y = - 14x2 + 56x + 18 models the arrow's height above the ground, y, in feet, x seconds after it was released.
Probability that container is a nonconforming container : If a filled container of juice is selected at random, what is the probability that is is a nonconforming container and what is the probability that is was filled in machine II?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Resulting center of gravity

The section of the plywood in the 3rd quadrant is sawed off and the resulting piece is then glued squarely over the 4th quadrant portion of the plywood with glue of negligible weight.What are the x- and y-coordinates of the resulting center of gra..

  Estimating the volume of soil in cubic meters

The void ratio of soil in the borrow pit is 1.12. Estimate the volume of soil (cubic meters) that must be excavated from the borrow pit.

  Ehermal conductivity of the radioactive wastes

The outer surface of the tank is cooled by air at 300 K with a heat transfer coefficient of 100 W/m2K. Determine the maximum temperature in the tank. Take the thermal conductivity of the wastes as 2.0 W/mK.

  Proprietorships and last year gross profit

Jack Flubber, who owns sons of Flubber Construction Co. and runs it as a proprietorships had gross profit last year of $ 80000. His personal and family expenses are $ 52000 and he has $ 7000 in exemptions and deductions.

  Shear and bending moment expressions

Show or formulate the shear and bending moment expressions for each board, and plot/draw the shear and bending moment diagrams of the boards.

  Rankine cycle and thermal efficiency

Determine the rate at which heat is added in the boiler, the power required to operate the pumps, the net power produced by the cycle, and the thermal efficiency.

  Force on block problem

The block is acted by its weight W=200 lb, a horizontal force Q=600 lb, and the pressure P exerted by the inclined plane. The resultant R of these forces is up and parallel to the inclined thereby sliding the block up it. Determine P and R.

  Difference between dry and moist lapse rate

Explain how the desert air can contain much more h 2 o vapor in the air than the pole, and still a lower humidity than the pole? what causes the difference between dry and moist lapse rate?

  Design the roof slab as a one-way slab system

Design the roof slab as a one-way slab system and use the worst case design scenario to determine the reinforcing for the entire roof

  Draw the influence line for the support reaction

Draw the influence line for the support reaction at A and calculate the support reaction at point

  Calculate equivalent pipe size and flow in the pipe

The first pipe of 0.4-m diameter is 500 m long, the second pipe 600 m long, size 0.3 m, and the last pipe is 500 m long of diameter 0.2 m. If the elevation difference between two reservoirs is 30 m, calculate equivalent pipe size and flow in the p..

  Calculate the rotation at point a and b using virtual work

Draw the FBD and the shear and bending moment diagrams. Label all minimums, maximums and zero crossing points as well as the slopes as constant, linear or parabolic.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd