Statistical process control

Assignment Help Operation Management
Reference no: EM131087113

A company is manufacturing integrated circuits. The design specifies the nominal thickness of the IC resistance layer to be 100 units. If the thickness strays too far from 100 units IC performance may be degraded. Assume the process is in control when 25 samples of IC resistance layer thickness (each of size 4) were taken off the production line. Using the methods of section 11.3.1 Control Charts for Variables, we want to achieve statistical control of the resistance layer thickness using X-bar and R charts.

The 25 sample values are provided in the following table.

Sample No.

Sample Values

1

90.42

90.92

98.98

93.26

2

91.91

86.45

103.18

103.58

3

110.85

96.96

98.19

102.65

4

125.56

106.68

105.53

97.33

5

111.84

100.27

93.82

111.41

6

98.12

97.76

90.02

112.4

7

107.87

87.01

106.06

119.58

8

100.17

100.93

80.77

88.77

9

94.02

100.77

107.21

101.69

10

93.49

112.24

100.73

95.44

11

89

91.44

104.04

98.09

12

94.12

93.56

95.84

102.98

13

107.21

86.29

97.46

122.98

14

95.35

100.9

106.59

100.73

15

101.66

109.1

92.83

86.62

16

103.35

80.3

117.23

93.92

17

103.31

94.49

115.74

103.28

18

103.87

118.35

111.11

91.97

19

106.45

105.86

108.14

97.13

20

89

98.45

112.17

111.68

21

115.88

108.87

104.21

91.71

22

106.19

96.96

102.49

103.81

23

99.48

107.25

92.07

101.53

24

99.35

90.06

72.8

94.88

25

96.87

101.96

101.92

105.49

a. Calculate the center line value and control limits for the R-chart.

Hint: Center line for the R chart is mean of the ranges.

b. Calculate the center line value and control limits for the X-bar chart.

c. Can the above control limits be adopted for use in on-line statistical process control? Explain.

d. 12 additional samples of IC resistance layer thickness were collected from a later production run and are provided below. Is the process in-control or out-of-control? Use the Control Charts constructed in parts a and bto determine whether the process is in-control or out-of-control. Explain your answer.

Sample No.

Sample Values

1

98.46

105.39

112.11

105.16

2

83.26

124.86

129.63

112.92

3

130.74

97.72

107.69

118.21

4

83.9

82.79

79.36

85.87

5

115.22

99.81

104.54

100.94

6

114.76

136.91

147.56

138.03

7

128.38

109.39

104.58

114.89

8

111.95

116.33

139.89

120.6

9

123.52

128.46

129.76

131.34

10

140.41

118.69

126.35

126.99

11

129.16

106.52

109.77

118.24

12

111.21

88.04

141.47

107.52

Reference no: EM131087113

Questions Cloud

What net operating income would appear in adgers budget : What net operating income would appear in Adger's flexible budget for May? What amount of revenue would be included in Adger's planning budget for May?
Construct the initial part of the quality control chart : A control chart for thickness of rolled-steel sheets is based on an upper control limit of .0520 in. and a lower limit of .0475 in. The first ten values of the quality statistic (in this case X, the sample mean thickness of n = 5 sample sheets) ar..
Two basic methods of contracting : Review the two basic methods of contracting (sealed bidding and contracting by negotiation) within the federal government. Provide and actual or theoretical example as a part of your response.
Calculate the velocity : Calculate the velocity.
Statistical process control : Calculate the center line value and control limits for the X-bar chart. Can the above control limits be adopted for use in on-line statistical process control? Explain.
An exponentially weighted moving-average control : The fact that Wt depends not only on Xt but also on averages for past time points, albeit with (exponentially) decreasing weights, suggests that changes in the process mean will be more quickly reflected in the Wt 's than in the individual Xt '
Explain difference between temporary and permanent damages : What does the Coase Theorem say about the two remedies when there are no transaction costs - What is the efficient outcome - for the factory to shut down, to run silently, or to run noisily?
Find the present velocity (lsb = 1°) : Find the present velocity (LSB = 1°).
Construct a hypothesis test : Continuing with the previous example, the hat company now wants to get a sense of how many hats men and women will purchase. Construct a hypothesis test to determine whether these sample have different means while assuming different population varian..

Reviews

Write a Review

Operation Management Questions & Answers

  Book review - the goal

Operations Management is about a book review. Title of the book is "Goal". This book has been written by Dr. Eliyahu Goldartt. The book has been appreciated by many as one of those books which offers an insight into the operations and strategic capac..

  Operational plan in hospitality enterprise

Operational plan pertaining to a hospitality enterprise is given in detail in the solution. The operational plan is an important plan or preparation which gives guidelines regarding the role and responsibilities of each and every operation at all lev..

  Managing operations and information

Recognise the importance of a strategic approach to the development and deployment of organisational information systems. Demonstrate an understanding of the importance of databases and their integration to the organisation's overall information mana..

  A make-or-buy analysis

An analysis of the holding costs, including the appropriate annual holding cost rate.

  Evolution and contributor of operations management

Briefly explain Evolution and contributor of Operations management.

  Functions and responsibilities of an operations manager

A number of drivers of change have transformed the roles, functions and responsibilities of an operations manager over recent years. These drivers have not only been based on technological innovations but also on the need for organisations to develop..

  Compute the optimal order quantity

Compute the Optimal Order quantity of DVD players. Determine the appropriate reorder point.

  Relationship to operations practice in the organisation

Evaluate problems in operations and identify approaches to overcoming them. Critically evaluate operating plans and identify areas for improvement. Justify, implement and evaluate changes to operations in line with modern approaches.

  A make or buy analysis

Develop a report for Figi Fabricating that will address the question of whether the company should continue to purchase the part from the supplier or begin to produce the part itself.

  Prepare a staffing plan

Prepare a staffing plan showing the change of your unit from medical/surgical staffing to oncology staffing.

  Leadership styles in different organizations

Ccompare the effectiveness of different leadership styles in different organizations

  Risk management tools and models

Be able to understand the concept of risk, roles and responsibilities for risk management and risk management tools and models.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd