Stakeholders and user groups of information systems

Assignment Help Other Subject
Reference no: EM131220733

1. Apply technical knowledge and skills in creating information for the workplace using spreadsheets and relational databases.

2. Communicate with IT professionals, stakeholders and user groups of information systems.

Cost-Benefit Analysis Overview:

Conducting a Cost-Benefit Analysis

While it is important to provide decision-makers with a range of options, the process of developing and analysing these can be expensive and time consuming. For major investments, it may be necessary to outline various potential options and then to have decision-makers select, after a preliminary screening, a smaller number for detailed appraisal. In any case, an appropriate level of consultation should be undertaken as best practice, either formally or informally, in creating a set of alternatives.

Step 1: Identify, quantify and value the costs and benefits of each alternative

A critical step in the CBA process involves identifying, quantifying and valuing the costs and benefits of each alternative. The types of benefits and costs will depend on the project. To illustrate, consider the construction of a toll motorway to relieve traffic congestion. Relevant costs would include the labour, capital and material costs to construct the road and the value of the land as reflected in the loss of the use of the land for alternative purposes. Benefits of the motorway would include lives saved, reduced travel time (which generally results in fuel and productivity benefits) and possibly the reduction of traffic on alternative routes, including the impact on inlet and outlet roads.

Typical costs of a proposal would include:

- Initial capital costs;
- capital costs of any buildings, equipment, or facilities that need to be replaced during the life of the project;
- operating and maintenance costs over the period of a programme or project; and
- costs which cannot be valued in money terms (often described as 'intangibles').

Typical benefits of a proposal would include:

- benefits which can be valued in money terms, in the form of revenues, cost savings or non-market outputs; and
- benefits which cannot be valued in money terms (also described as ‘intangibles').

Estimating the magnitude of costs can be difficult and will normally involve input from accountants, economists and other specialists.

Step 2: Calculate the Net Present Value

In CBA, the net social benefit (NSB), or the excess of total benefit over total cost, is represented by the net present value (NPV) of the proposal.

Before determining the value (or NPV) of a proposal, the costs (C) and benefits (B) need to be quantified for the expected duration of the project. The NSB is calculated by subtracting the cost stream from the benefit stream and is represented as follows:

NSB = B - C

The NPV of a proposal is determined by applying a ‘discount rate' (discussed below) to the identified costs and benefits. It is necessary to ‘discount' costs and benefits occurring later relative to those occurring sooner. This is because money received now can be invested and converted into a larger future amount and because people generally prefer to receive income now rather than in the future.

Step 3: Sensitivity analysis and dealing with uncertainty

The values of future costs and benefits on which the NPV is based are forecasts that cannot be known with certainty. While they should be forecast expected values, it is important to test the NPV for ‘optimistic' and ‘pessimistic' scenarios. This is achieved by changing the values of key variables in the analysis, such as the discount rate, costs and benefits, and measuring the impact of the changes on the NPV. This is known as sensitivity analysis and is a critical component of any CBA.

Where the NPV is shown to be very sensitive to changes in a variable, the analyst should check on the appropriateness and impact of this variable, and whether any changes to the design of the programme or underlying assumptions are warranted.

ASSESSMENT 3 - EXCEL SPREADSHEET
General Instructions:

1. Create a cost-benefit analysis spreadsheet for both in-house and outsourced development:
- Create s spreadsheet, format and use formulas to identify the cost-benefit analysis for alternatives.
- Visually show comparison by using graphs and charts.
- Give recommendations on which alternative is more beneficial to the organisation.

Detailed instructions:

1. Create an Excel workbook with 9 worksheets (tabs): costs for in-house development, benefits of in-house development, summary (in-house), payback period (in-house), costs for outsource development, benefits of outsource development, summary (outsource), payback period (outsource), comparison and recommendation
a. First workbook contains all the costs for in-house development. Your spreadsheet should look like this (note that students are required to input their own cost data):

Note:

- You need to enter data for the cost of each item. The values shown above are just examples.
- The first fiscal year is entered - rest of the fiscal year is computed by adding a year (for example, if year 2016 is entered in the first fiscal year, the rest of the four years will automatically be computer by adding a year from the previous year).
- Project total costs by year is the sum of all cost items per year (you need to use the formula to compute for this).
- Project total cost is the total money you need to spend on your project.
- You need to format your tables (you can design it the way you want). Make sure that appropriate formats are used (e.g. date format for dates, percentage formats or money formats)

b. Second workbook contains the benefits of in-house development:

Note:

- You need to enter data for the benefit value. The values shown above are just examples.
- Fiscal year for Benefit sources is referenced to the first fiscal year in cost (if the year in the cost changes, the fiscal years in benefit sources automatically change too). Fiscal year for the 2nd to 5th year are automatically computed based on the year in the first fiscal year (one year is added on the previous year).
- Total Benefits by year is the sum of all benefit sources per year (you need to use the formula to compute for this).
- Benefits Claimed for Analysis is computed using the following formula: total benefits per year * confidence factor.
- Project Grand Total Benefit is the total benefits for 5 years.
- You need to format your tables (you can design it the way you want). Make sure that appropriate formats are used (e.g. date format for dates, percentage formats and money formats)

c. Third workbook contains the summary of the cost-benefit analysis for in-house

Verified Expert

We have done the work as per the requirement of client. The steps given in the sheet are fully followed and all the work is done in the best possible manner. There is no references in this sheet because the we have not referred it from anywhere. The all required details are given in the attachment.

Reference no: EM131220733

Questions Cloud

What needs to be done to create database : Assume you have a customer who would like to track inventory including vendor (where the product comes from) and customer (who the product is sold to). What needs to be done to create this database?
Determining the middle frequency : The resulting output from the modulation process is known as the middle frequency (MF) signal. True or false?
Examine and discuss whether permissive reporting : Examine and discuss whether permissive reporting (i.e., personal or professional judgment regarding reporting) or mandatory reporting yields better results. Why or why not? When responding to this question, be sure to reference the lecture content..
How many moles of oxygen are needed to react completely : Use the balanced equation to answer the question. How many moles of O2 are needed to react completely with 1.8 moles of C2H6?
Stakeholders and user groups of information systems : ACCT6001 Accounting Information Systems Apply technical knowledge and skills in creating information for the workplace using spreadsheets and relational databases and communicate with IT professionals, stakeholders and user groups of information syst..
Comment on the given statement : Comment on the statement: "People care about real interest rates, not nominal rates. Therefore, money demand should depend on the difference between the real rates on money and bonds, not the nominal rate on bonds."
What are the four levels of transactions defined in ibm’s dr : What are the four levels of transactions defined in IBM's DRDA? Compare and contrast these four levels. Give examples to illustrate your answer.
How given development affect money demand and interest rate : It becomes quick and inexpensive to sell bonds. In the liquidity preference theory, how does this development affect money demand and the interest rate?
Do you think it is the responsibility of the government : The Affordable Care Act is pushing the U.S. toward healthcare for everyone. Other countries have had universal coverage for decades. What do you feel the U.S. can learn from other healthcare systems around the world? Do you think it is the respons..

Reviews

len1220733

9/26/2016 7:04:39 AM

I need accurate solutions and calculations - a high mark is needed Please follow the instructions carefully and answer all the required questions Formulae, formatting and cell references - All formulae, formatting and cell references are correct (No errors). Cells are excellently formatted and easy to understand. All data have been entered correctly. Graphs and pivot table - Graphs and pivot table are created with no errors. Excellent presentation of graphs and pivot table. Cost-benefit analysis recommendation - Thorough explanation of the recommendations are provided and in-depth analysis is presented

Write a Review

Other Subject Questions & Answers

  Cross-cultural opportunities and conflicts in canada

Short Paper on Cross-cultural Opportunities and Conflicts in Canada.

  Sociology theory questions

Sociology are very fundamental in nature. Role strain and role constraint speak about the duties and responsibilities of the roles of people in society or in a group. A short theory about Darwin and Moths is also answered.

  A book review on unfaithful angels

This review will help the reader understand the social work profession through different concepts giving the glimpse of why the social work profession might have drifted away from its original purpose of serving the poor.

  Disorder paper: schizophrenia

Schizophrenia does not really have just one single cause. It is a possibility that this disorder could be inherited but not all doctors are sure.

  Individual assignment: two models handout and rubric

Individual Assignment : Two Models Handout and Rubric,    This paper will allow you to understand and evaluate two vastly different organizational models and to effectively communicate their differences.

  Developing strategic intent for toyota

The following report includes the description about the organization, its strategies, industry analysis in which it operates and its position in the industry.

  Gasoline powered passenger vehicles

In this study, we examine how gasoline price volatility and income of the consumers impacts consumer's demand for gasoline.

  An aspect of poverty in canada

Economics thesis undergrad 4th year paper to write. it should be about 22 pages in length, literature review, economic analysis and then data or cost benefit analysis.

  Ngn customer satisfaction qos indicator for 3g services

The paper aims to highlight the global trends in countries and regions where 3G has already been introduced and propose an implementation plan to the telecom operators of developing countries.

  Prepare a power point presentation

Prepare the power point presentation for the case: Santa Fe Independent School District

  Information literacy is important in this environment

Information literacy is critically important in this contemporary environment

  Associative property of multiplication

Write a definition for associative property of multiplication.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd