Spending variance for supply costs

Assignment Help Accounting Basics
Reference no: EM13147842

Brattain Tile Installation Corporation measures its activity in terms of square feet of tile installed. Last month, the budgeted level of activity was 1,230 square feet and the actual level of activity was 1,140 square feet. The company's owner budgets for supply costs, a variable cost, at $2.10 per square foot. The actual supply cost last month was $3,260. In the company's flexible budget performance report for last month, what would have been the spending variance for supply costs?

A) $866 U

B) $257 F

C) $677 U

D) $189 F

Reference no: EM13147842

Questions Cloud

Find confidence interval for the mean score on each exam : Find the 95 percent confidence interval for the mean score on each exam. Do the confidence intervals overlap? If so, what does this suggest?
How many moles of o2 will be needed : A chemist has 4 moles of C2H6 to use in the study. How many moles of O2 will be needed in order to react all of the C2H6?
Which feature excludes it from possibly being a leech : Terry catches a ray-finned fish from the ocean and notices that, attached to its flank, there is an equally long, snakelike organism. The attached organism has no external segmentation, no scales, a round mouth surrounded by a sucker and two small..
Costs flow from inventory to cost of goods : Describe how costs flow from inventory to cost of goods sold for the following methods: (a) FIFO and (b) LIFO.
Spending variance for supply costs : The company's owner budgets for supply costs, a variable cost, at $2.10 per square foot. The actual supply cost last month was $3,260. In the company's flexible budget performance report for last month, what would have been the spending variance f..
Determine the ph of a 0.62 m nh4no3 solution : Determine the pH of a 0.62 M NH4NO3 solution at 25°C. The Kb for NH3 is 1.76 × 10-5.
Why and where does a low form at the surface : why and where does a Low form at the surface in association with the dynamics of air parcels moving through a jet streak
What is the final pressure in atm : a sample of helium gas initially at 37 degrees celsius, 785 torr and 2.00L was heated to 58.0 degrees celcius while the volume expanded to 3.24L. What is the final pressure in atm.
Is it likely assertion is correct at level of significance : Random sample of 100 voters showed that 55 of those sampled will vote for her. Is it likely that her assertion is correct at the 0.05 level of significance?

Reviews

Write a Review

Accounting Basics Questions & Answers

  How much control does fed have over this longer real rate

Hubbard argues that the Fed can control the Fed funds rate, but the interest rate that is important for the economy is a longer-term real rate of interest.   How much control does the Fed have over this longer real rate?

  Coures:- fundamental accounting principles

Coures:- Fundamental Accounting Principles: - Explain the goals and uses of special journals.

  Accounting problems

Accounting problems,  Draw a detailed timeline incorporating the dividends, calculate    the exact Payback Period  b)   the discounted Payback Period. the IRR,  the NPV, the Profitability Index.

  Write a report on internal controls

Write a report on Internal Controls

  Prepare the bank reconciliation for company

Prepare the bank reconciliation for company.

  Cost-benefit analysis

Create a cost-benefit analysis to evaluate the project

  Theory of interest

Theory of Interest: NPV, IRR, Nominal and Real, Amortization, Sinking Fund, TWRR, DWRR

  Liquidity and profitability

Distinguish between liquidity and profitability.

  What is the expected risk premium on the portfolio

Your Corp, Inc. has a corporate tax rate of 35%. Please calculate their after tax cost of debt expressed as a percentage. Your Corp, Inc. has several outstanding bond issues all of which require semiannual interest payments.

  Simple interest and compound interest

Simple Interest, Compound interest, discount rate, force of interest, AV, PV

  Capm and venture capital

CAPM and Venture Capital

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd