Space age furniture company

Assignment Help Business Management
Reference no: EM132064306

Space Age Furniture Company

The Space Age Furniture Company manufactures tables and cabinets to hold microwave ovens and portable televisions.These products are made in various sizes and with various features, but all follow basically the same production andassembly operations. However, two of these products-the Saturn microwave stand and the Gemini TV stand-have apart (no. 3079) that requires machining on a special lathe used only for making that part. At present the machine is runby Ed Szewczak, a machinist who also operates other machines in Space Age's shop. Once set up and started, the lathecan run nearly unattended. However, the machinist must be present (even if not actually attending the machine) anytime one of the machines, including the lathe, is in operation. At present, Ed works a regular 40-hour week. However,due to the workload for producing part 3079, it has been necessary to schedule frequent overtime for him in order tofinish the necessary parts on time.

Coral Snodgrass, operations manager for Space Age, has just heard from Ed's foremen that Ed is becoming unhappyabout so much overtime. As Coral knows, Ed has been with the company a long time and is an excellent, reliableemployee. Skilled machinists with Ed's experience and employment record are extremely difficult to find. Coral wonderswhat can be done to alleviate this problem.

Recently, Space Age began using an MRP system that has helped reduce inventories greatly and improve on-timedeliveries. In fact, Space Age carries no finished-goods inventory. Instead, everything in the master schedule is beingproduced for customer orders, so all products are shipped almost immediately. Previously Space Age had estimated thatit cost $1.25 per week to store each Gemini and $1.50 per week to store each Saturn that wasn't shipped immediately.The master schedule for producing these two items for the next six weeks is shown below.

Master Schedule

Week


1

2

3

4

5

6

Gemini

600

400

700

500

400

600

Saturn

300

400

400

600

300

300

The part in question, 3079, is used in two different subassemblies: no. 435, which is used in the Gemini TV stand, andno. 257, which is used in the Saturn microwave stand. One of part 3079 is used in each subassembly, and one of eachsubassembly is used in each of the final products.

Part 3079 may be produced in any quantity since the lathe that makes it is not used for anything else. However, both ofthe subassemblies are produced using the same equipment. To minimize change over time, Space Age has decided thatthese subassemblies should be made in minimum quantities of 1,000 at a time, although there is no problem withcapacity on the equipment that makes them. In fact, an order for 1,000 of subassembly 435 is due to be received inweek 1, as is an order for 1,000 of subassembly 257. Lead time for both these subassemblies is one week, and noinventory is expected to be on hand for either part at the beginning of week 1. There is not any on-hand inventory ofpart 3079, and there are no orders in process.

Ed Szewczak earns $22 per hour and gets a 50% premium for any overtime work. Whenever part 3079 is made, there isno set-up time, but processing takes 0.03 hour per unit. It costs $0.25 per week to hold any of these parts over fromone week to the next. The cost of holding each subassembly in inventory is $0.75 per unit per week.

  1. What options are open to Coral to address this problem?
  2. How would reducing the minimum quantity of subassemblies help?
  3. What are the costs of carrying excess items in inventory at each stage?
  4. What is the trade-off between overtime costs and inventory costs?

Reference no: EM132064306

Questions Cloud

Common stock is more difficult to value than corporate bonds : Common stock is more difficult to value than corporate bonds because:
Explain effective approaches to the broad spectrum : Explain effective approaches to the broad spectrum of employee relations, including career development, fostering ethical behavior
Leasing the machinery : With respect to leasing the machinery, describe how the Spanish Tunnel International and Washington Tunnels will record the amount
What is the gain-loss from only the futures contract : which position should the farmer take in the futures contract? What is the gain/loss from only the futures contract?
Space age furniture company : The Space Age Furniture Company manufactures tables and cabinets to hold microwave ovens and portable televisions.These products are made in various sizes
Difference between public and private debt offerings : Explain the difference between public debt offerings and private debt offerings. Provide a recent example of corporations using each type of offering.
What is the irr of the better project : The company's WACC is 10.5%. What is the IRR of the better project?
Costs of operating the business using excel : Costs of operating the business Using Excel, create a spreadsheet called operating_costs.xlsx that calculates the projected annual outgoing costs of running
Evaluate the level of responsibility of the company : Based on the information you researched, evaluate the level of responsibility of the company in terms of the effectiveness of the response to the security.

Reviews

Write a Review

Business Management Questions & Answers

  Program should promptthe user to enter the value

Write a program that calculates the average of N integers. The program should promptthe user to enter the value for N and then afterward must enter all N numbers.

  Common ways to organize a report

What are the four most common ways to organize a report? Explain each.

  Effective marketing communications

How does the electronic medium require different tactics for effective marketing communications?

  Interpersonal conflict and effective communication

Interpersonal Conflict and Effective Communication

  Corporate development stages

I have discovered many sites that discuss the ten stages of corporate development, but the stages have names. My professor only offers four.

  External analysis in strategic management

Describe and define internal and external analysis in Strategic Management.

  Discuss the degree to which the change has been disruptive

Discuss the degree to which the change has been disruptive and how the organization has responded to the dynamics created by this change.

  Large number of employees

Can a manager efficiently and effectively manage a large number of employees? Should a manager's span of control be a finite number?

  Why might ineffective leaders get promoted

Why do so many managers seem ineffective? Why might ineffective leaders get promoted? What organizational design characteristics are at work in these situations, and how might they be improved? Provide examples from your own or your organization'..

  What is the velocity of flow

A Pitot tube is inserted into this flow and measures a pressure of 8065.2 lb/ft^2. What is the velocity of this flow? Is the flow supersonic?

  Hersey and blanchard situational leadership model

For this assignment, first review the background materials with a focus on Hersey and Blanchard's Situational Leadership model. Make sure you are familiar with the four leadership styles covered in the situational approach including Directing, Coa..

  Discuss the different employment types

Discuss the different employment types and relationships relevant to agency law, and analyze the advantages and disadvantages of each type related to the uniform commercial code?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd