Southbank cultural precinct redevelopment

Assignment Help Other Engineering
Reference no: EM131240399

Southbank Cultural Precinct redevelopment - hamer hall

Project Scope

Describe the scope of work of the project

Hamer Hall was opened 33 years ago in 1980 and was definitely in need of an upgrade. It was Melbourne's main specialist Concert Hall - and is the home of the Melbourne Symphony Orchestra.

The interiors were worn and dated, the patron access and circulation was poor, the toilet amenities were insufficient and the acoustics in the Auditorium was not at a sufficient standard for the stature of such a venue. The theatre technology also needed significant updating as did the comfort levels of the patrons.

Hamer Hall is deceptive in size as it comprises eight distinct levels; five below St Kilda Road level and three above. The shape of the building mirrors an avocado. The three tier Auditorium has approximately 2,500 seats and is 30 metres in height from the Stalls level to the concrete ceiling. The Auditorium is surrounded by a five level Front-of-House public area to the east and four levels Back- of-House for the performers and staff to the west. The remainder of the floors are plantrooms and spaces for stage theatrics.

The state Government originally assigned $128.5m to the refurbishment to undertake the following key works:

the Auditorium

- Improved acoustics through treatment of stage surround and crystalline acoustic diffusers on upper walls and removal of balcony arms

- New integrated theatre technical zone and flying system
- New over-stage acoustic reflector
- New, wider seats, maintaining existing distance between rows
- New hybrid displacement air conditioning system. the Foyer

- St Kilda Road foyer reconfigured and enlarged to accommodate an expanded box office and cloaking facility
- All escalators replaced with wider escalators between every public level
- Reconfigured and redistributed toilets (80% more women's toilets overall)
- Existing foyer bars upgraded and increased in size.

B. Included details on the type of contract used for the project

C. Detail with supporting examples and evidence, addressing the Evaluation Criteria in the order stated above, the case in support of the project that warrants the winning of the Award.

 Outcomes achieved against planned targets for key project parameters

https://www.dropbox.com/s/kdbshfptb16tre5/project1.pdf?dl=0

Reference no: EM131240399

Questions Cloud

Discuss why and under what conditions bubble sort : Discuss why and under what conditions bubble sort may be inefficient when the array to be sorted is very large.
Determine the temperature of an asphalt pavement : Identify the heat transfer processes that determine the temperature of an asphalt pavement on a summer day. Write an energy balance for the surface of the pavement.
Determine other main factors that account for the misuse : The IMF and World Bank are the world's two leading lending institutions, but much of their monetary assistance disappears once it enters the banking systems of developing countries. Cite concrete evidence that supports the assertion that much assi..
Identify the specific accounting issue that you believe need : Identify the specific accounting issue that you believe needs to be initially addressed for JE's consideration of goodwill with regards to both Dynamic and ZD.
Southbank cultural precinct redevelopment : Describe the scope of work of the project - Included details on the type of contract used for the project and Detail with supporting examples and evidence, addressing the Evaluation Criteria in the order stated above, the case in support of the proj..
Which are most popular neural network structures : What do you think about the ability of neural networks to show great fault tolerance when they encounter damages to the elements and destruction of their whole structures?
Explain the differences between tcp receiver : Discussion 1: The TCP header contains information that is important to the connection, describe one of the information blocks within the header. Discussion 2: Describe the three way TCP handshake that establishes a connection. Discussion 3: Explain..
Branches across the united kingdom : 1000-1250 words Scenario: A retail bookstore chain has branches across the United Kingdom. The senior management has strategically decided to implement a data warehousing solution to enable better decision-making and to gain a competitive advantag..
Which weights must be established. is this opinion justified : Why do neural networks require differentiation of quantitative and qualitative data? There is an opinion that networks that use qualitative data as inputs or outputs need more time for learning because they include more connections for which weigh..

Reviews

Write a Review

Other Engineering Questions & Answers

  Calculate the gasoline savings

How much gasoline do vehicles with the following fuel efficiencies consume in one year? Calculate the gasoline savings, in gallons per year, created by the following two options. Show all your work, and draw boxes around your answers.

  Discuss key problems associated with using packaged soft

Discuss the key problems associated with using packaged software? How can these problems be minimized?

  Block diagram system performance and responses1 simplify

block diagram system performance and responses1. simplify the above block diagram and determine the closed diagram

  Determine the approach flow rate and cycle length

If the capacity of the approach equals the number of arrivals per cycle, determine the approach flow rate and cycle length.

  Calculate different measures of performance

Calculate different measures of performance (L, Lc, W, WQ), when you do not buy any additional grinders. That is, when you have a single grinder. Also, calculate the cost per minute of the system with a single grinder.

  Gauge pressure at the bottom of the cylinder

What volume of water must be added to double the gauge pressure at the bottom of the cylinder?

  Draw shear-force and moment diagram of the steel frame

Draw shear-force and moment diagram of the steel frame and design the member and calculate the structural design calculation and detailing in the form of a drawing

  Reminded of the penalties applying to plagiarism

• You are not permitted to use any "toolbox" functions from MATLAB. If in doubt, use which to see if a function you wish to use is part of an add-on toolbox or not.

  Calculate the fracture stress for a crack length

Calculate the fracture stress (σc) for a crack length (2a) of 50 mm, assuming plane strain conditions. If conditions were plane stress instead.

  Design a circuit and arduino program that accomplishes

Design a circuit and Arduino program that accomplishes the following. Reads a press of a pushbutton once, and it cycles through all possible brightness values.

  Urban change and the role of the change agent

The first assignment involves you becoming familiar with the different types of urban change experienced in cities and how urban change is managed by government (Especially local and state levels).

  Environmental engineeringquestion 4 the wastewater from a

environmental engineeringquestion 4 the wastewater from a restaurant contains organic matter with a theoretical oxygen

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd