Some executives prefer to micromanage projects whereas other executives are fearful of making a decision because, if they were to make the wrong decision, it could impact their career. In this case study, the president of the company assigned one of the vice presidents to act as the project sponsor on a project designed to build tooling for a client. The sponsor, however, was reluctant to make any decisions. Moreland Company was well-respected as a tooling design-and-build company. Moreland was project-driven because all of its income came from projects. Moreland was also reasonably mature in project management. When the previous VP for engineering retired, Moreland hired an executive from a manufacturing company to replace him. The new VP for engineering, Al Zink, had excellent engineering knowledge about tooling but had worked for companies that were not project-driven. Al had very little knowledge about project management and had never functioned as a project sponsor. Because of Al's lack of experience as a sponsor, the president decided that Al should "get his feet wet" as quickly as possible and assigned him as the project sponsor on a mediumsized project. The project manager on this project was Fred Cutler. Fred was an engineer with more than twenty years of experience in tooling design and manufacturing. Fred reported directly to Al Zink administratively. Fred understood the situation; he would have to train Al Zink on how to function as a project sponsor. This was a new experience for Fred because subordinates usually do not train senior personnel on how to do their job. Would Al Zink be receptive? Fred explained the role of the sponsor and how there are certain project documents that require the signatures of both the project manager and the project sponsor. Everything seemed 658 NETWORK SCHEDULING TECHNIQUES 1. ©2010 by Harold Kerzner. Reproduced by permission. All rights reserved. Background Assigning the VP Fred's Dilemma c12.qxd 1/3/13 5:01 PM Page 658 to be going well until Fred informed Al that the project sponsor is the person that the president eventually holds accountable for the success or failure of the project. Fred could tell that Al was quite upset over this statement. Al realized that the failure of a project where he was the sponsor could damage his reputation and career. Al was now uncomfortable about having to act as a sponsor but knew that he might eventually be assigned as a sponsor on other projects. Al also knew that this project was somewhat of a high risk. If Al could function as an invisible sponsor, he could avoid making any critical decisions. In the first meeting between Fred and Al where Al was the sponsor, Al asked Fred for a copy of the schedule for the project. Fred responded: I'm working on the schedule right now. I cannot finish the schedule until you tell me whether you want me to lay out the schedule based upon best time, least cost, or least risk. Al stated that he would think about it and get back to Fred as soon as possible. During the middle of the next week, Fred and Al met in the company's cafeteria. Al asked Fred again, "How is the schedule coming along?" and Fred responded as before: I cannot finish the schedule until you tell me whether you want me to lay out the schedule based upon best time, least cost, or least risk. Al was furious, turned around, and walked away from Fred. Fred was now getting nervous about how upset Al was and began worrying if Al might remove him as the project manager. But Fred decided to hold his ground and get Al to make a decision. At the weekly sponsor meeting between Fred and Al, once again Al asked the same question, and once again Fred gave the same response as before. Al now became quite angry and yelled out: Just give me a least time schedule. Fred had gotten Al to make his first decision. Fred finalized his schedule and had it on Al's desk two days later awaiting Al's signature. Once again, Al procrastinated and refused to sign off on the schedule. Al believed that, if he delayed making the decision, Fred would take the initiative and begin working on the schedule without Al's signature. Fred kept sending e-mails to Al asking when he intended to sign off on the schedule or, if something was not correct, what changes needed to be made. As expected, Al did not respond. Fred then decided that he had to pressure Al one way or another into making timely decisions as the project sponsor. Fred then sent an e-mail to Al that stated: I sent you the project schedule last week. If the schedule is not signed by this Friday, there could be an impact on the end date of the project. If I do not hear from you, one way or another, by this Friday, I will assume you approve the schedule and I can begin implementation. The president's e-mail address was also included in the CC location on the e-mail. The next morning, Fred found the schedule on his desk, signed by Al Zink.

1. Were Al Zink's actions that of someone trying to be an invisible sponsor?

2. Did Fred Cutler act appropriately in trying to get Al Zink to act as a sponsor?

3. What is your best guess as to what happened to the working relationship between Al Zink and Fred Cutler?

Reference no: EM131605355

Questions Cloud

Discuss what is the function of telomeres to cell division : What is the function of telomeres with regard to cell division, If a patient has an abnormality in telomerase activity, how might this contribute to cancer
What is meant by the term contingency : What is meant by the term "contingency" and under what circumstances must a contingent loss be accrued
Find a formula for the riemann sum : Using summation notation, write the left-hand Riemann sum with n subdivisions for 1?2 t2dt.
Answer to discussion post : Gender orientation is psychologically formed. It is assembled by each individual and is associated to behavior. Culture, societal roles and group associations
Someone trying to be an invisible sponsor : 1. Were Al Zink's actions that of someone trying to be an invisible sponsor? 2. Did Fred Cutler act appropriately in trying to get Al Zink to act as a sponsor?
Develop the elements of an effective learning plan : Throughout this course, you've examined how to develop the elements of an effective Learning Plan.
Discuss beyond mendels laws : Discuss Beyond Mendels Laws, Long QT Syndrome
Authenticity and the future of women leadership : Authenticity and the Future of Women's Leadership" Please respond to the following:Suppose you were advising female leaders.
How would you assess the persons credibility : How would you assess the persons credibility - What barriers to effective listening may arise and in what listening stage

Reviews

Write a Review

Physics Questions & Answers

  Calculate the acceleration of the seed

A record turntable is rotating at 33 1/3 rev/min. A watermelonseed is on the turntable 6.5 cm fromthe axis of rotation. Calculate the acceleration of the seed, assumingthat it does not slip

  Find an expression for muggins'' expected return

In the game of Blackball, at each turn Muggins draws a ball at random from a bag containing five white balls, three red balls and two black balls; after being recorded, the ball is replaced in the bag.

  What is the speed of light inside the block

When certain light rays pass from a vacuum into a block of an unknown material, What is the speed of light inside the block

  What is least coefficient of friction between tires and road

What is the least coefficient of friction between tires and road that will allow cars to negotiate the turn without sliding off the road?

  What is average power of elevator motor through interval

A 650kg elevator starts from rest. It moves upward for 3.0s by constant acceleration until it reaches its cruising speed of 1.75m/s. a) what is the average power of elevator motor through this time interval?

  What is the speed of the large cart after the collision

A cube of ice is taken from the freezer at -8.0 and placed in a 113 aluminium calorimeter filled with 306 of water at room temperature of 20.0. The final situation is observed to be all water at 15.0.

  With what speed does the car then strike the tree

The driver of a car slams on the brakes when he sees a tree blocking the road. The car slows uniformly with acceleration of -5.90 m/s2 for 4.45 s, With what speed does the car then strike the tree

  Find the location and magnification of the image

An object with a height of 42 cm is placed 2.3 m in front of a concave mirror with a focal length of 0.55 m. Find the location and magnification of the image produced by the mirror

  Evaluate how much time does it take for the package

A helicopter is ascending vertically with a speed of 5.00m/s . At a height of 120m above the Earth, a package is dropped from a window. Evaluate how much time does it take for the package to reach the ground?

  What is the potential energy of the loop

A round loop of diameter 12 cm, carrying a current of 0.40 A, is placed inside a magnetic field B = 0.20 i T + 0.40 j T. What is the potential energy of the loop

  What is the change in enthalpy for each process

A container with a frictionless, movable piston contains saturated vapor R134a at 100kPa. What is the change in enthalpy for each process

  Calculate the temperature of the tungsten filament

A common flashlight bulb is rated at 0.270 A and 3.36 V (the values of current and voltage under operating conditions). estimate the temperature of the tungsten filament when the bulb is turned on

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd