Solving linear program using the decomposition principle

Assignment Help Operation Management
Reference no: EM13105890

Solve the following linear program using the decomposition principle: minimize z = ?2x1 ? 5x2 subject to x1 + 2x2 = 13.5 x1 + 3x2 = 18.0 x1 ? 9 x2 ? 5 x1, x2 ? 0. Let the first two constraints be the "hard" constraints and the remaining constraints be the "easy" constraints. As an initial basis use the extreme points (0, 0)T, (0, 5)T, and (9, 5)T. (These are extreme points for the easy constraints in their original form, without slack variables.)

Reference no: EM13105890

Questions Cloud

How critical thinking utilized to recognize cause of problem : Write down 1250-1750 word paper describing how critical thinking is used to recognize causes of problems or issues for this population. Focus on.
What is the radius of the circle : At t1 = 5.00 s, the acceleration of a particle moving at constant speed in counterclockwise circular motion is a1=(2m/s^2)i + (9m/s^2)j At t2 = 6.00 s (less than one period later), the acceleration is a2= (9m/s^2)i - (2m/s^2)j The period is more t..
Normal distribution and confidence intervals : State the main points of the Central Limit Theorem for a mean. Why is population shape of concern when estimating a mean? What does sample size have to do with it?"
Select the appropriate variables to graph on each axis : You have two small 2.0- balls that have been given equal but opposite charges, but you don't know the magnitude of the charge. To find out, you place the balls a distance apart on a slippery horizontal surface, release them, and use a motion detec..
Solving linear program using the decomposition principle : Solve the following linear program using the decomposition principle: minimize z = ?2x1 ? 5x2 subject to x1 + 2x2 = 13.5 x1 + 3x2 = 18.0 x1 ? 9 x2 ? 5 x1, x2 ? 0.
Determining confidence interval-test of hypothesis : In an article in the Journal of Management, Morris, Avila and Allen studied innovation by surveying firms to find the number of new products introduced by the firms.
Finding initial basic feasible solution : Consider the cutting stock problem that arises when a company manufactures sheets of standard width 100 and has commitments to supply 40 sections of width 40, 60 sections of width 24, and 80 sections of width 18.
Compute cutting and saving time by scheduling overtime : Additional cutting and saving time can be obtained by scheduling overtime for this operations. Each hour of overtime for cutting operation increases hourly cost $15 and each hour of overtime for sewing operation.
Information about confidence interval and probability : A building developer has the opportunity to purchase several acres of land that is divided up into several lots for building single-family homes.

Reviews

Write a Review

Operation Management Questions & Answers

  Managers understand that uncertainties are addressed

Managers understand that uncertainties are addressed at the specific level of uncertainty, the particular source from which it originates and the specific practices that are used best to resolve these uncertainties.

  Think of how you will create value by making advantageous

Think of how you will create value by making it more advantageous to employ or contract with your technology business. Ideally, you provide more value than just being inexpensive.

  Describes the whole research process

Discuss how the research questions and hypothesis are developed. Describe the null and alternative hypothesis and how they support the research effort. Describe how the research effort will be measured and analyzed.

  Determine new price of a set of chess pieces

These price drivers would be equipment usage, storage area for the material also type of woods used.

  Best guess estimate of the dates for milestones

Develop a scope statement for this project that contains examples of all the elements. Assume that the event will occur in five weeks and provide your best guess estimate of the dates for milestones.

  Calculate the throughput rate and cycle time for each step

calculate the throughput rate and cycle time for each step. You estimate that mixing will take 10 minutes per bowl. Each bowl can hold enough ingredients for 2 dozen brownies, and the church has 4 bowls.

  Balance of business needs vs the it challenges

Imagine an interview with a company CIO or MIS Director/Manager, perhaps even in your own company. Construct a short list of questions that you would ask.

  Estimating values to maximize the profit

Solve the following linear programming problem graphically using the corner-point method. What are the X and Y values that maximize the profit?

  Distinguish between individual and organizational barriers

Distinguish between individual barriers and organizational barriers to communication. Explain two examples of each beside those referenced in the textbook.

  Calculating total cost of crashing the project

Three activities are candidates for crashing on a project network for a large computer installation (all of course are critical).

  Identify technologies we covered that can be used as part

Identify technologies we covered that can be used as part of a CRM strategy and discuss its applicability to the Fresh Foods grocery store we reviewed as a case study.

  Articulate key aspects of operations management

Articulate key aspects of operations management. Explain why operations management is important to managers in various organizational areas. Please provide specific examples

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd