An effluent holding pond to be used as part of a spray irrigations system is being built. The holding pond is located 2.5 miles awary for the 10 mgd WWTP which will supply the effluent. The effluent will leave the plant at an elevation of 65 feet with 8 feet of driving head. The elevation of the discharge pipe is 55 ft. Determine the pipe diamenter reuired to transport the effluent to the holding pond. Use galvanized iron as the pipe material (e = 0.006 in). Solve the problem using the Darcy Weisbach equation and the Colebrook-White equation. Size the pipe to the nearest inch. Assume the water temp is 80 degrees F
shaped nozzle such that the velocity along the center line of the flow increased from 1.5 m / s to 15 m / s at a distance of 37.5 m. specify the amount of convective acceleration at the beginning and end of the range.
A 58.3 degree inclined plan has a spring with spring constant 23,400 N/m attached at the bottom.A 1.2 kg block is placed on the plane and compresses the spring a distance of 2.4 cm from equilibrium.
when their spacing is h, what is the radial component of convective acceleration at the section just inside the edge of the disk (section A) in terms of D, V, and h. assume uniform velocity distribution across the section.
Determine the maximum rimpull of the tractor in each of the indicated gears if the efficiency is 92%. If the tractor is operated over a haul road whose slope is +2.5% with rolling resistance of 80 lb/ton
A rectangular channel 2.0 m wide carrying a discharge of 2.5 m3/s is to be fitted with a weir at its downstream end to provide a means of flow measurement as well as to cause heading-up of the water surface.
Initially the air in this tank is at 20 psia and 70 degrees F. Presuming that the ank is well insulated determine the temperature and mass in the tank when it is filled to 120 psia.
inability and green engineering can be integrated in the four components of materials science and engineering?
a draw the shearing force diagram and the moment diagram of the following problem. the beam is indeterminate. you need
A 10-mm diameter bar of 1040 carbon steel is subjected to a tensile load of 50,000 N, taking it beyond its yield point. Calculate the elastic recovery (or strain) that would occur upon removal of the tensile load.
An industry discharges .5m^3/s of waste with a 5 day CBOD of 500 mg/l to a river with a flow of 2 m^3/s and a 5 day CBOD of 2 mg/l calculate the 5 day CBOD of the river after mixing with the waste.
The pump graphs are given to us, and I'm asked to determine possible lengths and diameters of the pipe to meet two requirments. The system can have multiple outputs in order to satisfy the needs, but they must be occuring at the same time.
Determine the corresponding error in the computed discharge
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd