Solve the nonlinear system of equations

Assignment Help Engineering Mathematics
Reference no: EM131046049

Assignment-

Problem 1) Solve the following system of non-linear equations using Newton's Method and fixed point iteration:

x2 + 2x + 2y2 - 26  = 0

2x3 - y2 + 4y - 19 = 0

Start at x= 1.0, y = 1.0. Carry out the first five iterations for both cases.

Problem 2) A coating on the panel of a surface is cured by radiant energy from a heater. The temperature of the coating is determined by radiative and convective (Non-linear) processes. Using the following governing equations solve the system of simultaneous equations to determine Jh, Jc, Tc, Th. Follow the steps (parts a and b) in the text below-

205_Figure.png

5.67 x 10-8Tc4 + 17.41Tc - Jc = 5188.18

Jc - 0.71Jh + 7.46Tc = 2352.71

5.67 x 10-8Th4 + 1.865Th - Jh = 2250

Jh - 0.71Jc + 7.46Th = 11093

where Jh and Jc are the radiosities of the heater and coating surfaces, respectively, and Th and Tc are the respective temperatures.

(a) Show that the following iteration function can be used for solving the nonlinear system of equations with the fixed-point iteration method:

Tc = [Jc - 17.41Tc + 5188.18/5.67 x 10-8]1/4

Th = [2250 + Jh - 1.865Th/5.67 x 10-8]1/4

Jc = 2352.71 + 0.71Jh - 7.46Tc

Jh = 11093 + 0.71Jc - 7.46Th

(b) Solve the nonlinear system of equations with the fixed-point iteration method using the iteration functions from part (a). Use the following initial values: Th = Tc = 298 K, Jc = 3000 W/m2, and Jh = 5000 W/m2. Carry out 100 iterations, and plot the respective values to observe their convergence. The final answers should be: Tc = 481 K, Jc = 6222 W/m2, Th = 671 K, Jh = 10504 W/m2.

Reference no: EM131046049

Questions Cloud

Determine the resulting profit for clear vision : (a) Find Clear Vision's profit-maximizing output and price. Determine the resulting profit for Clear Vision.
Total cost function depends on a robotics input price : (a) The current price per unit of internet services is $53. Determine the output level that maximizes Joe's profit in the short run. Determine the resulting profit for Joe's. (b) The coefficient on the q term in the total cost function depends on ..
Create a visual and written plan for a parent bulletin board : Create a visual and written plan for a parent bulletin board that you will place on a large wall outside your classroom which parents will see when they enter your facility.
What other justifications for this requirement can you think : What other justifications for this requirement can you think of?
Solve the nonlinear system of equations : Solve the nonlinear system of equations with the fixed-point iteration method using the iteration functions from part (a). Use the following initial values: Th = Tc = 298 K, Jc = 3000 W/m2, and Jh = 5000 W/m2
Give a connectivity model for which d is of order log a : Give a connectivity model for which D is of order log A and another for which D is of order √ A.
Question regarding the spending projection : Congress's budget for the coming year includes a spending projection of $4.2 billion. Tax revenue projects $3.8 billion. Which fiscal policy would Congress have to adopt to maintain spending levels without increasing the debt?
Explain the issues facing your community : In a memorandum to your local health department, present a healthcare advocacy plan that addresses your researched findings. Explain the issues facing your community, possible methods to alleviate the concern, and how you would ethically advocate ..
How do gmos and organic food play into your diet : How do GMO's and organic food play into your diet? Implementation: What are the best ways that people can go about implementing your diet? Be sure to give concrete and specific ways.

Reviews

Write a Review

Engineering Mathematics Questions & Answers

  Rate of heat loss by convection to the air

Atmospheric air at 25°C and a velocity of 0.5 m/s flows over a 50- W incandescent bulb whose surface temperature is at 140°C. The bulb may be approximated as a sphere of 50-mm diameter. What is the rate of heat loss by convection to the air?

  Modify the formulation by adding a constraint that whoever

a young couple eve and steven want to divide their four main household chores so that each is responsible for two of

  Calculate the diameter of a medium carbon steel

Calculate the diameter of a medium carbon steel pin in double shear subjected to a suddenly applied shearing force of 150,000N

  Multiplicative lcgs-compute zi

how can solve that Consider the LCG defined by m = 16, a = 5, c = 3, and Z0 = 7. Compute until Z19 and verify that when i = 16, the exact the same order will show up. Show all results in a table.

  Descriptive stats for numeric variable

Analyze the data with MegaStat®, StatCrunch®, Microsoft® Excel®or other statistical tool(s), including: Descriptive stats for each numeric variable

  Spreadsheet model-kps communications

KPS Communications is planning to bring wireless Internet access to the town of Ames, Iowa. Using a geographic information system, KPS has divided Ames into the following 5 by 5 grid. The values in each block of the grid indicate the expected annu..

  Compute the test statistic for testing the hypotheses

Give the null and alternative hypotheses for testing the consumer advocate group's claim. Compute the test statistic for testing the hypotheses, part c. Find the rejection region of the test at a= .10.

  Determine a minimum-cost staffing plan for pharmaplus

Formulate a linear programming model that can be used to determine a minimum-cost staffing plan for PharmaPlus. Determine the optimal staffing plan using the Management Scientist software, including the number of pharmacists and technicians needed.

  Determine and sketch the autocorrelation function

The power spectral density of a random process X (t) is shown in Figure. It contains of a delta function at f = 0 and a triangular component. (a) Determine and sketch the autocorrelation function RX (t) of X (t).

  Calculate the length of the proposed section of train track

Determine how long it will take the milk to completely drain from the vat - Calculate the length of the proposed section of train track - Find the percentage of customers who have to wait more than 4 minutes.

  Concrete with an estimated value

An irrigation scheme is fed from a river via a diversion channel. The irrigation channel is 2 m wide and is constructed of concrete with an estimated value of 0.019 for the Manning n. The bed slope is 0.0025.

  What is the distribution of the time till the next epoch

What is the distribution of the time till the next epoch of N2(t) and what is the probability that the next epoch of N (t) is an epoch in N1(t)?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd