Solve linear programming problem using solver

Assignment Help Basic Statistics
Reference no: EM1317452

Solve linear programming problem using Solver tool and Graphical process.

A farmer in Iowa owns 45 acres of land. He is going to plant each acre with wheat or corn. Each acre planted with wheat yields $200 profit, requires 3 workers, and requires 2 tons of fertilizer; each with corn yields $300 profit, requires 2 workers, and requires 4 tons of fertilizer. One hundred workers and 120 tons of fertilizer are available.

a. Use Solver to help the farmer make the most of the profit from his land.

b. Confirm graphically that the solution from part (a) maximizes the farmer's profit from his land.

Reference no: EM1317452

Questions Cloud

Remaking the quadratic function : Remaking the quadratic function.
Describe analysis of the intercompany financials : Describe Analysis of the intercompany financials with liquidity ratios and how the two companies are doing and what they could do to improve themselves
Find out the value of correlation coefficient : Find out the value of correlation coefficient. Make a regression model to predict winning percentage utilizing all of the data.
Find the largest x intercept for the polynomial function : Find the largest x-intercept for the polynomial function.
Solve linear programming problem using solver : A farmer in Iowa owns 45 acres of land. He is going to plant each acre with wheat or corn. Each acre planted with wheat yields $200 profit, requires 3 workers, and requires 2 tons of fertilizer; each with corn yields $300 profit, requires 2 worker..
Calculation of return on investment and residual income : Calculation of return on investment and residual income and Calculate the missing amounts for each division
Find the smallest x intercept for the function : Find the smallest x-intercept for the function.
Level of significance to test either or not the population : A test of hypothesis is conducted at the .05 level of significance to test either or not the population correlation is zero.
Conclude how woodco can maximize its revenue : Woodco manufactures tables and chairs. Each table and chair must be made entirely out of oak or entirely out of pine. A total of 150 board feet of oak and 210 board feet of pine are available.

Reviews

Write a Review

Basic Statistics Questions & Answers

  Statistics-probability assignment

MATH1550H: Assignment:  Question:  A word is selected at random from the following poem of Persian poet and mathematician Omar Khayyam (1048-1131), translated by English poet Edward Fitzgerald (1808-1883). Find the expected value of the length of th..

  What is the least number

MATH1550H: Assignment:  Question:     what is the least number of applicants that should be interviewed so as to have at least 50% chance of finding one such secretary?

  Determine the value of k

MATH1550H: Assignment:  Question:     Experience shows that X, the number of customers entering a post office during any period of time t, is a random variable the probability mass function of which is of the form

  What is the probability

MATH1550H: Assignment:Questions: (Genetics) What is the probability that at most two of the offspring are aa?

  Binomial distributions

MATH1550H: Assignment:  Questions:  Let’s assume the department of Mathematics of Trent University has 11 faculty members. For i = 0; 1; 2; 3; find pi, the probability that i of them were born on Canada Day using the binomial distributions.

  Caselet on mcdonald’s vs. burger king - waiting time

Caselet on McDonald’s vs. Burger King - Waiting time

  Generate descriptive statistics

Generate descriptive statistics. Create a stem-and-leaf plot of the data and box plot of the data.

  Sampling variability and standard error

Problems on Sampling Variability and Standard Error and Confidence Intervals

  Estimate the population mean

Estimate the population mean

  Conduct a marketing experiment

Conduct a marketing experiment in which students are to taste one of two different brands of soft drink

  Find out the probability

Find out the probability

  Linear programming models

LINEAR PROGRAMMING MODELS

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd