Solve and determine the variable overhead rate

Assignment Help Managerial Accounting
Reference no: EM132521418

Cirilla's Weathervane Company manufactures weathervanes. The current year operating budget is based on the production of 9,500 weathervanes with 1.20 machine-hour allowed per weathervane. Variable manufacturing overhead is anticipated to be $280,000.

Actual production was 12,000 weathervanes using 12,500 machine-hours. Actual variable costs were $23.50 per machine-hour.

Required:

Question 1: Solve and Determine the variable overhead rate and the efficiency variances.

Reference no: EM132521418

Questions Cloud

What were the benefits of implementing an edw at isle : What were the benefits of implementing an EDW at Isle? Can you think of other potential benefits that were not listed in the case?
What is the force of repulsion : Two identical charges, each -8.00 E-5 C, are separated by a distance of 20.0 cm (100 cm = 1 m). What is the force of repulsion? Coulomb's constant
Amount of work done in vertically lifting a steel beam : Find the amount of work done in vertically lifting a steel beam of mass 600. kg at uniform speed through a distance of 38.0 m
How much time passes before it comes back down : How much time passes before it comes back down at 15 m/s (air resistance is negligible)
Solve and determine the variable overhead rate : Solve and Determine the variable overhead rate and the efficiency variances. Cirilla's Weathervane Company manufactures weathervanes.
Total electrostatic potential energy of three charges : Three point charges are arranged as shown in figure 1 with two +q charges fixed at points (± d, 0) and -2q charge fixed at the point (0, -d).
Calculate the magnitude of the gravitational field strength : At the top of Mt. Robson in British Colombia, a 7.50 kg turkey weighs 72.6 N. Calculate the magnitude of the gravitational field strength at this location.
Define strategies to implement to allow type of interaction : The movement of traditional IT staff. To facilitate cultural assimilation, IT and non-IT must become more integrated. What are some strategies to implement.
What is slb budgeted cash payment for components in may : What is SLB's budgeted cash payment for components in May? South Loop Bikes (SLB) purchases bicycle components in the month prior to assembling

Reviews

Write a Review

Managerial Accounting Questions & Answers

  Manage budgets and financial plans

Explain the budgeting process and its importance to a business, identifying the components of different budgets, forecast estimates for inclusion in the budgets.

  Prepare a retained earnings statement

Prepare a retained earnings statement for the year and Prepare a stockholders' equity section of given case.

  Prepare a master budget for the three-month period

Prepare a master budget for the three-month period.

  Construct the companys direct labor budget

Construct the company's direct labor budget for the upcoming fiscal year, assuming that the direct labor workforce is adjusted each quarter to match the number of hours required to produce the forecasted number of units produced.

  Evaluate the predetermined overhead rate

Evaluate the Predetermined Overhead Rate

  Determine the company''s bid

Determine the company's bid if activity-based costing is used and the bid is based upon full manufacturing cost plus 30 percent.

  Compute the pool rates for the different activities

Complete the schedule to compute the pool rates for the different activities.

  Prepare Company financial statements

Prepare Company financial statements

  Prepare an analysis of terracycles

This individual assignment is based on the TerraCycle Inc.

  Discuss the ethical issues

Discuss the ethical issues

  Political resources in emerging markets

Calculate the GDP in Income Approach  and Expenditure Approach

  Management accounting - ehsan electronics company

A new plant accountant suggested that the company may be able to assign support costs to products more accurately by using an activity based costing system that relies on a separate rate for each manufacturing activity that causes support costs.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd