Reference no: EM132293167
A small toy manufacturer makes stuffed animals. The steps are cutting, sewing, stuffing, packing, and labeling. Cutting takes 3 minutes, sewing takes 10 minutes, stuffing takes 5 minutes, packing takes 2 minutes, and labeling takes 1 minute.
a. Draw a Gantt chart if there are three employees:
A does cutting. B does sewing. C does stuffing, packing, and labeling. Identify the processing time and cycle time.
b. Repeat the question above assuming that there are only two employees. A does the cutting and sewing. B does the stuffing, packing, and labeling.
c. Assuming the process is supply-constrained, is there a better way to divide assign the tasks to two employees?