QUESTION 1- System is 100 L/s, pipe diameters of 100 and 200 mm, and pipe lengths of 50 and 100 in. Pipe roughness ics = 0.06 mm. Assume kinematic viscosity v = 10-6 m2/s.
Sketch the hydraulic and energy grade lines showing relative magnitudes and slopes.

QUESTION 2- A reservoir (water surface elevation of 100 m) feeds two lower reservoirs LI and L2. Water surface level in the LI reservoir is 70 m and in the L2 reservoir is 60 in. The reservoirs are connected through the network of pipes as shown below. Calculate the flows in each pipe.
|
Length
|
Diameter
|
A
|
Special features
|
Pipe 1
|
20000 m
|
0.5 in
|
0.05
|
No minor losses
|
Pipe 2
|
5000 in
|
0.4 m
|
0.05
|
No minor losses
|
Pipe 3
|
5000 m
|
0.3 m
|
0.05
|
No minor losses
|

QUESTION 3- rises 2 m. 1 ne tnetton tactor r = dins. Estunate me power required to drive me selected pump if its efficiency is 85%. For applied speed n = 1450 rpm, what type of pump do you suggest?
QUESTION 4- Topographical survey for a hydropower project shows that the available head is 100m. Design discharge for the river was 150 m3/s. What would be the installed capacity (power in MW) of the power plant? What type of turbine should be used if the turbine speed is 600 rpm?
QUESTION 5- Water at 20° C flows from the basement to the second floor through the 25 mm diameter metal pipe at a rate of Q = 1.0 Us and exits through a tap of diameter 12 mm as shown below. ks=1.5 x 104 mm. Determine the pressure at point (1) if
a. viscous effects are neglected;
b. only major losses are included;
c. all losses are included

QUESTION 6- A wide rectangular channel has a change of slope from 1 in 100 to 1 in 500 and the flow is 4m3/s/m. Manning's n can be taken as 0.015.
a. Determine the normal depth of flow before and after the change in gradient.
b. Will it be possible to produce a hydraulic jump in the channel downstream of the junction of two slopes?
c. Calculate the height of the jump and sketch the surface profiles before and after jump.
d. Calculate energy loss and approximate dimension of the jump.
QUESTION 7- Determine the headwater depth of a 1000 mm (high) by 1500mm (wide) concrete box culvert operating under outlet control with a stream flow of 3.0 m3/s. The culvert is 50 m long. K.=0.5 and on a slope of 0.25%. The tailwater depth is 1.1w. What will be the headwater depth if the tail water depth is reduced by 0.8 m?
QUESTION 8- An earthen channel (n=0.03) has a bed width of 5.0 m, a water depth h = 1.5 in, a 45° side slope, and a channel slope of 0.001. Calculate the average velocity in the channel and the discharge. Determine whether erosion will take place if the maximum pennissible flow of water in an earthen channel is 1.5 m/s.
QUESTION 9- The annual precipitation in mm observed on a network of stations is shown below. Compute the average area rainfall by
a) the arithmetic average method and
b) Thiessen polygon method. Red dots show the rainfall stations and the text shows the rainfall amount in mm for the corresponding station. Blue line shows the river network within the catchment.
New aspects of business-management positions
: Yet employees need to develop new skills, strengthen skill weaknesses, and be exposed to new aspects of the business to prepare for management positions. Are there alternatives? Are there other ways an employee's current job can be changed to deve..
|
Define graphical user interface design
: Graphical User Interface Design
|
Explain the specific elements in your chosen commercials
: In context of the section on "sticky" advertisements, provide three examples of advertisers' efforts to concretize their advertisements. Television commercials would be a good source of ideas. Explain the specific elements in your chosen commercial..
|
Business intelligence systems with supply chain management
: Read this PDF file which consists of three articles related to Business Intelligence Systems with Supply Chain Management. Critically review these articles, explore the strength and weakness of these articles .
|
Sketch the hydraulic and energy grade lines
: System is 100 L/s, pipe diameters of 100 and 200 mm, and pipe lengths of 50 and 100 in. Pipe roughness ics = 0.06 mm. Assume kinematic viscosity v = 10-6 m2/s. Sketch the hydraulic and energy grade lines showing relative magnitudes and slopes.
|
Problem regarding the effective communication
: Review the article that the authors intended not the article you wish they wrote. Place the APA article reference at the top of the first page, skip a line and begin the review
|
Why was iris justified in determining who the owner
: Why was Iris justified in determining who the owner of the CD was?
|
How the product is positioned differently in the us
: Based on your knowledge and experience, as well as research, describe how the product is positioned differently in the U.S. versus the other country. Explain two cultural and two noncultural reasons for the difference in positioning
|
Team building and performance standards
: Objective: Identify methodologies relevant to team building and performance standards for the functions of HRM as they pertain to organizing, controlling, planning, leading, and staffing
|