Reference no: EM13305812
Prepare a project proposal on how to adjust the project schedule. The proposal should include only descriptions of the ways in which you propose to modify the project schedule. Your final project (due in Week 8) will include the following:
- A formal change request
- An evaluation of the impact of the change (as submitted to the Change Control Board)-time and labour only. Note: It will be necessary to create the original project schedule and budget to analyse the impact of the change request. Consider that the additional wing will be built concurrently.
- A list of all the assumptions made
- An analysis of risk factors due to the change request
- A new project schedule that shows:
- The additional time required
- The additional labour cost
- The new completion date
- A statement of work for one contractor
- A contract closure process description for one contractor
- A project closure process description
The project details are as follows:
The Smiths decide to build a house on a piece of land that they have purchased. They have consulted with an architect and have the blueprints created. You are a general contractor and have agreed to build the house for them. The Smiths inform you that they had been considering the addition of an extra wing in the house but have now decided against it as the additional space is unnecessary. The original blueprints that the Smiths gave you did not have the additional wing.
You have projected that it will take you 12 weeks to complete the house. However, you need a buffer to accommodate the uncertain weather conditions, and you tell the Smiths that you will need 14 weeks. The Smiths are really anxious to move into their new house. Although they agree for 14 weeks, they also want to put in a penalty for late completion. You agree, provided they also put in a bonus for early completion. You reach an agreement with the Smiths, and the contract is signed. You have figured the project duration and effort as follows:
Task
|
Duration (days)
|
Effort (staff days)
|
Comments
|
Get a building permit.
|
5
|
1
|
|
Clear the site.
|
5
|
20
|
|
Dig the foundation and footings.
|
3
|
9
|
|
Install forms.
|
3
|
9
|
|
Pour concrete.
|
1
|
5
|
|
Wait for the concrete to harden.
|
5
|
0
|
This is referred to as lag time.
|
Remove forms.
|
1
|
3
|
|
Build the floor.
|
1
|
5
|
|
Frame the first floor.
|
2
|
10
|
|
Build the second floor.
|
2
|
10
|
|
Frame the second floor.
|
3
|
15
|
|
Sheath the house.
|
3
|
12
|
|
Install windows and doors.
|
4
|
8
|
|
Install siding.
|
2
|
6
|
|
Put up roof framing.
|
2
|
8
|
Can start as soon as the second floor is framed
|
Shingle the roof.
|
1
|
4
|
|
Install plumbing.
|
4
|
8
|
Can start as soon as the roof is shingled
|
Inspect the plumbing.
|
1
|
0
|
|
Install wiring.
|
6
|
12
|
Can start as soon as the roof is shingled
|
Inspect the wiring.
|
1
|
0
|
|
Hang and finish sheetrock.
|
4
|
12
|
Can start only after the plumbing and electrical work are inspected
|
Paint the interior.
|
3
|
9
|
|
Lay the carpet.
|
2
|
6
|
|
Install the hardwood flooring.
|
3
|
6
|
|
Install trim.
|
3
|
6
|
|
Procure the certificate of occupancy.
|
5
|
0
|
|
Total
|
75
|
184
|
|
Just as your crew starts framing the second floor, the Smiths tell you that they would now like the additional wing in the house they mentioned previously. The Smiths present you with a new set of blueprints, containing the new wing and ask for a projected difference in price and time for the addition.You figure that to add the extra wing the following would be required in terms of duration and effort:
Task
|
Duration (days)
|
Effort (staff days)
|
Comments
|
Dig the foundation and footings.
|
2
|
6
|
|
Install forms.
|
2
|
6
|
|
Pour concrete.
|
1
|
3
|
|
Wait for the concrete to harden.
|
5
|
0
|
This is referred to as lag time
|
Remove forms.
|
1
|
2
|
|
Build the floor.
|
1
|
4
|
|
Frame the first floor.
|
1
|
4
|
|
Build the second floor.
|
1
|
4
|
|
Frame the second floor.
|
2
|
8
|
|
Sheath the house.
|
2
|
6
|
|
Install windows and doors.
|
2
|
4
|
|
Install siding.
|
1
|
3
|
|
Put up roof framing.
|
2
|
6
|
|
Shingle the roof.
|
1
|
3
|
|
Install plumbing.
|
2
|
4
|
|
Inspect the plumbing.
|
|
|
|
Install wiring.
|
2
|
4
|
|
Inspect the wiring.
|
|
|
|
Hang and finish sheetrock.
|
2
|
6
|
|
Paint the interior.
|
1
|
3
|
|
Lay the carpet.
|
2
|
4
|
|
Install the hardwood flooring.
|
|
|
|
Install trim.
|
1
|
3
|
|
|
|
|
|
Total
|
34
|
83
|
|
This new estimate to add the wing, assumes the sheathing will go on the base house and then work will stop until the extra wing is sheathed. You believe this will be the most economical way to add the additional wing to the property. Another option would be for the project to continue as originally planned, and then add the wing after the Smiths have moved in. After considering both options, the Smiths choose to follow your recommendation to add the new wing now so that they move in when the whole house is complete. The additional work required is as follows:
Task
|
Duration (days)
|
Effort (staff days)
|
Comments
|
Procure the building permit.
|
5
|
1
|
|
Dig the foundation and footings.
|
2
|
6
|
|
Install forms.
|
2
|
6
|
|
Pour concrete.
|
1
|
3
|
|
Wait for the concrete to harden.
|
5
|
0
|
|
Remove forms.
|
1
|
2
|
|
Build the floor.
|
1.5
|
6
|
|
Frame the first floor.
|
1.5
|
6
|
|
Build the second floor.
|
1.5
|
6
|
|
Frame the second floor.
|
2
|
8
|
|
Add the sheath.
|
2
|
6
|
|
Install windows and doors.
|
2
|
4
|
|
Install the siding.
|
1
|
3
|
|
Put up roof framing.
|
2.5
|
7
|
|
Shingle the roof.
|
1
|
3
|
|
Install plumbing.
|
2
|
4
|
|
Inspect the plumbing.
|
1
|
0
|
|
Install wiring.
|
2
|
4
|
|
Inspect the wiring.
|
1
|
0
|
|
Hang and finish sheetrock.
|
2
|
6
|
|
Paint the interior.
|
1
|
3
|
|
Lay the carpet.
|
2
|
4
|
|
Install trim.
|
1
|
3
|
|
|
|
|
|
Total
|
38
|
90
|
|
The rates for the various trades (in $/hour) are as follows:
Code
|
Description
|
Rate
|
Comments
|
GC
|
General contractor
|
40.00
|
|
HE
|
Heavy-equipment operator
|
50.00
|
Includes equipment
|
C
|
Concrete worker
|
30.00
|
|
F
|
Framer
|
20.00
|
|
F
|
Siding installer
|
20.00
|
|
W
|
Window/door installer
|
30.00
|
|
R
|
Roofer
|
20.00
|
|
P
|
Painter
|
20.00
|
|
E
|
Electrician
|
35.00
|
|
FL
|
Flooring installer
|
20.00
|
|
T
|
Trim carpenter
|
35.00
|
|
PL
|
Plumber
|
35.00
|
|
In this project, you will analyse the situation and the effect of the change request on the schedule, cost, and features.
Faith seeking understanding
: Identify clearly the topic(s) you have chosen to discuss and discuss the topic in light of the teachings of the Church
|
How many days will the fish hatchery have to contain water
: If for parathion, the activation energy is 15.4 kcal/mole and A = 8.1 x 109 at a pH = 7.8, how many days will the fish hatchery have to contain the river water if T = 15 oC (winter time)
|
Determine what is the required pipe size to deliver
: A concrete pipeline is installed to deliver 6m^3/sec of water (10degressC) between two reservoirs 17 km apart. If the elevation difference between the two reservoirs is 12m, what is the required pipe size
|
Find is it virtual or real
: A 2.0cm tall object is located 18.0cm in front of a converging lens with a focal length of 10.0cm. Is it virtual or real
|
Situation and the effect of the change request
: The situation and the effect of the change request on the schedule, cost, and features.
|
How to calculate the forces in members ec and ef
: Using method of joints, calculate the forces in members EC and EF. Note that the length of the member CD is 3.464 m, the length of member EC is 2m, and angle CDE is 30 degree ( this will cut down a bit of trigonometry effort).
|
What price must the division charge in order to break even
: The division has fixed costs of $10,000 per month, and it expects to sell 42,000 strips per month. If the variable cost per strip is $2.00, what price must the division charge in order to break even?
|
What is jaster market / book ratio
: It has 800 million shares of common stock outstanding,and its stock price is $32 per share. What is Jaster'smarket /book ratio?
|
How close will the particles get to each other
: A proton is fired directly at a lithium nucleus. If the protonâ€TMs velocity is 4.0x105 m/s when it is far from the nucleus, how close will the particles get to each other
|