Reference no: EM132416346
Anyone can asnwer these tasks covering the full requirements of the tasks?
Scenario
You are training to be a civil engineer. You have been asked to compile a project profile for the excavations, earthworks and groundwater control for a greenfield development, with granular sub-soil and a high-water table, and an RC pump station with a deep trench RC service duct.
Task 1 c
P1 Identify the earthworks activities that may be carried out when forming deep excavations and cuttings. This could be, for example, infrastructure works for public utility providers. Also identify the plant used, the challenges presented by various sub-soils and the support and falsework required to provide a safe working environment.
P2 Describe the methods of controlling groundwater. You must include a range of methods of groundwater control, for example sump pumping, dewatering and land drainage.
Task 2 Two Storey Basement Project with Framed Superstructure
P3 Describe the commonly used forms of substructure for commercial and industrial civil engineering projects. For example, outline the use of piles and rafts (sheet, contiguous and secant) and deep drainage techniques for use with service ducts and tunnels.
P4 Explain how drainage is integrated into substructures. This should build on the evidence for P3.
P5 Explain how public utilities are integrated into substructures. This should include deep reinforced concrete culverts and plant rooms, service ducting, cable trenching and service ducts. This should build on the evidence for P3 and P4.
P6 Describe the construction plant and equipment used to erect steel and concrete frames. Evidence should include images and/or drawings of the construction plant and equipment and a statement of the advantages and disadvantages of each.
P7 Explain the use of steel and concrete for framed superstructure construction. You should include the use of steel and concrete in the context of merits and de-merits including the levels of skilled labour required, lifting and placement requirements and safe working access
National asphalt pavement association
: Looking at National Asphalt Pavement Association (NAPA), Asphalt Recycling & Reclaiming Association (ARRA) and National Ready Mixed Concrete Association
|
Write about what you have learned from reading the article
: Second Paragraph: In your own words, write about what you have learned from reading the article. Be sure to include supporting details
|
Information governance for cloud computing
: According to Crocker and Smallwood, cloud computing represents one of the most significant paradigm shifts in information technology history
|
Describe the underlying issue with the situation
: Describe the underlying issue with the situation, that is, what do you think motivates their distress?
|
Single storey below ground reservoir pumping station
: Identify the earthworks activities that may be carried out when forming deep excavations and cuttings. This could be, for example, infrastructure works
|
Construct the necessary operational and maintenance flows
: Construct the necessary operational and maintenance flows, identify repair policies, and apply quantitative effectiveness factors as appropriate.
|
Most common types of estimating techniques
: What are the three most common types of estimating techniques, and in what situation is it most appropriate to use each one?
|
Comparison of two organisation design models
: Summarise the historical and theoretical perspectives of organisation design, and give a brief explanation and comparison of two organisation design models
|
You believe that the era of mom-and-pop businesses
: You believe that the era of mom-and-pop businesses, in which one person knew the business, is no longer relevant in today's society
|