Reference no: EM13189128
You have been asked to be the project manager for the development of an information technology (IT) project. The system to be developed will allow a large company to coordinate and maintain records of the professional development of its employees. The company has over 30,000 employees who are located in four sites: Florida, Colorado, Illinois, and Texas. The system needs to allow employees to locate and schedule professional development activities that are relevant to their positions. Sophisticated search capabilities are required, and the ability to add scheduled events to the employees' calendars is desired. The system needs to support social networking to allow employees to determine who is attending conferences and events. This will promote fostering relationships and ensure coverage of conferences that are considered of high importance.
Once an activity has been completed, employees will use the system to submit the documentation. The system should support notifications to management personnel whenever their direct reports have submitted documentation. The system should also notify employees if their deadline to complete professional-development requirements is approaching and is not yet satisfied:
The goal is to get this system up and running at the start of the next fiscal year.
For the given scenario, your group needs to complete the following:
Work together with role playing (one Project Manager, one customer, others may be system architects/developers) to identify the system requirements and all risks. And, rate each risk.
Each member selects one of the highest risks. Explain why these are considered high risk, and explain their potential effect on the project.
Outline a risk mitigation strategy for the each of the selected high risks.
Summarize the challenges the team faced and how you worked out.
Create a 10 - 15 pages PowerPoint presentation with audio narration which covers 1 - 4. Each member needs to add audio presentation at least for his/her selected risk.
Determine profit maximizing level of production
: Why is it important for a profit maximizing firm to consider market structure in determining the price and output of its product or service b. How do you determine the profit maximizing level of production in terms of price, marginal revenue and m..
|
Inability to recognize familiar faces result of brain damage
: The inability to recognize familiar faces as a result of brain damage is called
|
Identify the fixed cost and variable cost components
: Draw two figures, one above the other. In the top figure, plot the total, variable, and fixed cost curves. In the bottom figure, show the average and marginal cost curves. Use Excel and plot for enough values of q between 0 and 20 such that the va..
|
Calculate personal income
: Consider the following preliminary data from 2008: ($ in billions) GDP $14264.60 Factor Payments from Abroad $798.30 Factor Payments to Abroad $665.10 Consumption of Fixed Capital $1832.30 Indirest Business Taxes $1118.90 Corporate Profits and Relat..
|
Show the risk mitigation strategy
: Each member selects one of the highest risks. Explain why these are considered high risk, and explain their potential effect on the project and outline a risk mitigation strategy for the each of the selected high risks.
|
Do consumers lose when a large country protects
: If a small country wants to protect its domestic producers from more efficient foreign competition by imposing an import tariff, will it come out ahead Do consumers lose when a large country protects it's less efficient producers from foreign comp..
|
Discuss an experience you have had with a team
: What are ways that a project manager can ensure that he or she is being given an accurate status report and Discuss an experience you have had with a team that struggled and never really got to the point of functioning smoothly.
|
Determine the present worth of the two contracts
: At the end of that time a mild recesion slowed the development so the parties signed another contract for $190,000 per year for 2 more years. Determine the present worth of the two contracts at an interest rate of 10% per year.
|
How long is the transverse axis
: the length of the red line segment is 12 and the length of the blue line segment is 4. how long is the transverse axis ?
|