Jennifer's Home Remodeling worked on three jobs during March. Job 13 was in process on March 1 with total charges of $5,500. During the month, the following additional transactions occurred.
a. Purchased $10,000 worth of new materials on account.
b. Charged materials to jobs as follows: $1,000 to Job 13, $4,000 to Job 14, $3,000 to Job 15, and $2,000 as indirect materials.
c. Charged labor to jobs as follows: $1,000 to Job 13, $3,000 to Job 14, $2,000 to Job 15, and $1,000 as indirect labor.
d. Incurred indirect expenses totaling $13,000 including depreciation of $4,000. This also included credits of $9,000 to Accounts Payable.
e. Applied manufacturing overhead for March to Work in Process based on materials used in each job. The predetermined rate was based on expected materials of $80,000 and expected overhead of $120,000 for this year.
Show the journal entries to record these transactions.
Compute the cost of solvent transferred
: The production supervisor estimates that the ending work in process is 60 percent complete. Compute the cost of solvent transferred to finished goods and the amount in work-in-process ending inventory as of November 30.
|
Compute the average rainfall intensity and the total volume
: Problems that may occur for the owner during the bidding phase of a project when the estimated pay quantities in a unit-price contract are lower than the actual amount.
|
Compute the cost per gallon of liquid cleaner produced
: Compute the cost per gallon of liquid cleaner produced in June - Basic Product Costing
|
Value of work-in-process inventory on march 31
: Compute cost of goods sold for March, what is the value of work-in-process inventory on March 31?
|
Show the journal entries to record transactions
: Jennifer's Home Remodeling worked on three jobs during March. Job 13 was in process on March 1 with total charges of $5,500. During the month, the additional transactions occurred.
|
Differences between airborne infectious diseases and disease
: A sanitary sewer with a 450 mm diameter is constructed on the minimum allowable slope of 0.9 m/km. What is the full capacity of the sewer? At what depths of flow in the pipe are the velocities of flow equal to 0.6 m/s. Assume Mannings constant n = 0...
|
Prepare the journal entries on december
: Prepare the journal entries on December 31, 2013, May 11, 2014, and June 12, 2014- The company recorded this amount as an addition to Allowance for Doubtful Accounts.
|
Calculate the annual water demand on the water supply at the
: Assuming an average daily water demand of 400 L/(person. day) during winter months and 700 L/(person. day) during summer months, calculate the annual water demand on the water supply at the end of the design period.
|
Show a statement of cash flows using the direct method
: Prepare a statement of cash flows using the indirect method for year 2011, prepare a statement of cash flows using the direct method for year 2011.
|