Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
1. Two construction companies are bidding against one another for the right to construct a new community center building in Bloomington, Indiana. The first construction company, Fine Line Homes, believes that its competitor, Buffalo Valley Construction, will place a bid for this project according to the distribution shown in the file P06_44.xlsx. Furthermore, Fine Line Homes estimates that it will cost $160,000 for its own company to construct this building. Given its fine reputation and long-standing service within the local community, Fine Line Homes believes that it will likely be awarded the project in the event that it and Buffalo Valley Construction submit exactly the same bids. Create a payoff table that lists the profit from each Fine Line bid and each competing bid, and use it to find the bid that maximizes Fine Line's expected profit. Why is this an easier approach than a decision tree for this particular problem?
2. A nuclear power company is deciding whether to build a nuclear power plant at Diablo Canyon or at Roy Rogers City. The cost of building the power plant is $10 million at Diablo and $20 million at Roy Rogers City. If the company builds at Diablo, however, and an earthquake occurs at Diablo during the next five years, construction will be terminated and the company will lose $10 million (and will still have to build a power plant at Roy Rogers City). Without further expert information the company believes there is a 20% chance that an earthquake will occur at Diablo during the next five years. For $1 million, a geologist can be hired to analyze the fault structure at Diablo Canyon. She will predict either that an earthquake will occur or that an earthquake will not occur. The geologist's past record indicates that she will predict an earthquake on 95% of the occasions for which an earthquake will occur and no earthquake on 90% of the occasions for which an earthquake will not occur. Should the power company hire the geologist? Also, calculate and interpret EVSI and EVPI.
Attachment:- P06-44.rar
The Green Paddle has a cost of equity of 13.73 percent and a pre-tax cost of debt of 7.6 percent. the debt-equity ratio is 0.65 and the tax rate is 32 percent. What is green paddle's unlevered cost of capital?
Create a matlab code to find principal stresses, principal planes, maximum and minimum shear stresses and their planes (for any specified state of stress).
Choose a leading Arab or Muslim historical figure preferably from the field of Mathematics. You will then be required to do some collaborative research on his life, main accomplishments and his contribution or significance to our lives today.
the distribution of sat scores is normal with u500 and o 100a. what sat score x value separate the top 15 of the
A package can have a maximum combined length and girth of 108 inches. Find the dimensions of the package of maximum volume that can be sent. (assume that the cross section is a square)
the area of a rectangle is 991cm squared if 991 is a prime number, what are the whole number dimensions of the rectangle?
Find the osculating plane of the circular helix r(t) = costi + sintj + tk at the point (0, 1, pi/2)
Totalitarian government is one extreme type of government. Which of the following is at the other end of the political spectrum? (A) Dictatorship (B) Parliamentary government
The following estimates were made of the cash flows. The company's cost of capital is 8%.
A researcher wishes to estimate the proportion of college students who cheat on exams. A poll of 490 college students showed that 33% of them had, or intended to, cheat on examinations. Find the margin of error for the 95% confidence interval. Sho..
Flying with the wind a plane went 183 km/h. Flying into the wind the plane only went 141 km/h. Find the speed of the plane in still air and the speed of the wind.
Compute the work required to compress a spring 2 more cm when it is already compressed 3 cm, assuming that the spring constant is k = 150 kg/s2.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd