Should the firm undertake the healthy bottled water project

Assignment Help Finance Basics
Reference no: EM13274242

Cascade water Company (CWC) currently has 30,000,000 shares of common stock outstanding that trade at a price of $42 per share. CWC also has 500,000 bonds outstanding that currently trade at $023.38 each. CWC has no preferred stock outstanding nad has an equity bets of 2.639. The risk-free rate is 3.5%, and the market is expected to return 12.52%. The firm's bonds have a 20 year life, a $1,000 per value, a 10% coupon rate, and pay interest semiannually. CWC is considering adding to its product mix a healthy bottled water geared toward children. The initial outlay for the project is expected to be $3,000,000, which will be depreciated using the straight-line mthod to a zero salvage value, and sales are expected to be 1,250,000 units per year at a price of $1.25 per unit. Variable costs are estimated to be $0.24 per unit, and fixed costs of the project are estimated at $200,000 per year. The project is expected to have a 3-year life and a terminal value (excluding the operating cash flows in year 3) of $500,000. CWC has a 34% tax rate. For the purposes of this project, working capital effects will be ignored. Bottled water targeted at child is expected to have a different risk characteristics from the firms' current products. Therefore, CWC has decided to use the "pure play" approach to evalue this project. After researching the market CWC managed to find two pure play firms. the specifics for those two firms are

Firm Equity Beta D/E Tax Rate
Fruity Water 1.72 0.43 34%
Ladybug Drinks 1.84 0.35 36%

Should the firm undertake the healthy bottled water project? As part of your analysis, include a sensitivity analysis for sales price, variable costs, fixed costs, and unit sales at plus or minus 10%, 20%, and 30% from the base case. Also perform an analysis of the following two scenarios:

a. best case: selling 2,500,000 units at a price $1.24 per unit, with variable production costs of $0.22 per unit

b. worst case: selling 950,000 units at a price of $1.32 per unit, with variable production costs of $0.27 per unit

 

Reference no: EM13274242

Questions Cloud

How sensitive is ocf to changes in quantity sold : straight-line depreciation to zero over the four-year life; zero salvage value; price = $22; variable costs = $12; fixed costs = $160,000; quantity sold = 82,000 units; tax rate = 32 percent.
Calculate the efficiency of a fossil-fuel power plant : Calculate the efficiency of a fossil-fuel power plant that consumes 380 metric tons of coal each hour to produce useful work at the rate of 800 MW
Explain sodium carbonate solution does a precipitate form : When 12.0 mL of a 2.89E-4 M barium acetate solution is combined with 18.0 mL of a 5.24E-4 M sodium carbonate solution does a precipitate form
What is the cost of borrowing the maximum amount of credit : What is the cost of borrowing the maximum amount of credit available to MDM through factoring? Assume 30 day month and 360 day year.
Should the firm undertake the healthy bottled water project : Should the firm undertake the healthy bottled water project? As part of your analysis, include a sensitivity analysis for sales price, variable costs, fixed costs, and unit sales at plus or minus 10%, 20%, and 30% from the base case.
What other energy device must be included in solar system : The amount of sunshine on a horizontal surface at the equator is 5kWh/m2/day. Suppose a house is to run entirely off grid on solar electricity alone using a high performance silicon photovoltaic module with specifications shown below: Maximum powe..
Determine the average power of the circuit over one cycle : A series RLC circuit has a peak current of 1.0 A with a frequency of 7 kHz. determine the average power of the circuit over one cycle
Calculate after-tax cost of debt for each capital structure : compare the WACCs calculated in part (d) and discuss the impact of the firm's financial leverage on its WACC and its related risk.
Design state transition table for up-down counter sequence : The machine takes three inputs in addition to the clock: countup, countdown, reset. The count advances by 1 when countup=1, decreases by 1 when countdown=1, and goes to 0 when reset=1. The output o1=1 when the count reaches 3.

Reviews

Write a Review

Finance Basics Questions & Answers

  Financial reporting and analysis

Finance is about Gunns Ltd, a company in dealing with forestry products in Australia. The company has also been listed in Australian Stock Exchange. As many companies producing forestry products, even Gunns Ltd is facing various problems. Due to the ..

  A report on financial accounting

This report is specific for a core understanding for Financial Accounting and its relevant factors.

  Describe the types of financial ratios

Describe the types of financial ratios and other financial performance measures that are used during venture's successful life cycle.

  Differences between sole proprietorship and corporation

Briefly describe the major differences between a sole proprietorship and a corporation

  Prepare a cash budget statement

Calculate the expected value of the apartment in 20 years' time. What is the mortgage loan repayment at the beginning of each month

  What are the implied interest rates

What are the implied interest rates in Europe and the U.S.?

  State pricing theory and no-arbitrage pricing theory

State pricing theory and no-arbitrage pricing theory

  Small business administration

Identify the likely stage for each venture and describe the type of financing each venture is likely to be seeking and identify potential sources for that financing.

  Effect of financial leverage

The Effect of Financial Leverage and working capital management

  Evaluate the basis for the payment to the lender

Evaluate the basis for the payment to the lender and basis for the payment to the company-counterparty.

  Importance of opps, ipps, mpfs and dmepos

Research and discuss the differences and importance of : OPPS, IPPS, MPFS and DMEPOS.

  Time value of money

Time Value of Money project

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd