Should the bradleys lease the land at that price

Assignment Help Mathematics
Reference no: EM131177231

1. Southern Sporting Good Company makes basketballs and footballs. Each product is produced from two resources rubber and leather. Each basketball produced results in a profit of $11 and each football earns $15 in profit. The resource requirements for each product and the total resources available are as follows:

a. Find the optimal solution.

b. What would be the effect on the optimal solution if the profit for the basketball changed from $11 to $12?

c. What would be the effect on optimal solution if 400 additional pounds of rubber could be obtained? What would be the effect if 600 additional square feet of leather could be obtained?

2. A company produces two products, A and B, which have profits of $9 and $7, respectively. Each unit of product must be processed on two assembly lines, where the required production times are as follows:

a. Formulate a linear programming model to determine the optimal product mix that will maximize profit.

b. What are the sensitivity ranges for the objective function coefficients?

c. Determine the shadow prices for additional hours of production time on line 1 and line 2 and indicate whether the company would prefer additional line 1 or line 2 hours.

3. Formulate and solve the model for the following problem:

Irwin Textile Mills produces two types of cotton cloth denim and corduroy. Corduroy is a heavier grade of cotton cloth and, as such, requires 8 pounds of raw cotton per yard, whereas denim requires 6 pounds of raw cotton per yard. A yard of corduroy requires 4 hours of processing time; a yard od denim requires 3.0 hours. Although the demand for denim is practically unlimited, the maximum demand for corduroy is 510 yards per month. The manufacturer has 6,500 pounds of cotton and 3,000 hours of processing time available each month.

The manufacturer makes a profit of $2.5 per yards of denim and $3.25 per yard of corduroy. The manufacturer wants to know how many yards of each type of cloth to produce to maximize profit. Formulate the model and put it into standard form. Solve it

a. How much extra cotton and processing time are left over at the optimal solution? Is the demand for corduroy met?

b. If Irwin Mills can obtain additional cotton or processing time, but not both, which should it select? How much? Explain your answer.

4. The Bradley family owns 410 acres of farmland in North Carolina on which they grow corn and tobacco. Each acre of corn costs $105 to plant, cultivate, and harvest; each acre of tobacco costs $210. The Bradleys' have a budget of $52,500 for next year. The government limits the number of acres of tobacco that can be planted to 100. The profit from each acre of corn is $300; the profit from each acre of tobacco is $520. The Bradleys' want to know how many acres of each crop to plant in order to maximize their profit.

a. Formulate the linear programming model for the problem and solve.

b. How many acres of farmland will not be cultivated at the optimal solution? Do the Bradleys use the entire 100-acre tobacco allotment?

c. The Bradleys' have an opportunity to lease some extra land from a neighbor. The neighbor is offering the land to them for $110 per acre. Should the Bradleys' lease the land at that price? What is the maximum price the Bradleys' should pay their neighbor for the land, and how much land should they lease at that price?

d. The Bradleys' are considering taking out a loan to increase their budget. For each dollar they borrow, how much additional profit would they make? If they borrowed an additional $1,000, would the number of acres of corn and tobacco they plant change?

Attachment:- data.rar

Reference no: EM131177231

Questions Cloud

Explain the actions of the fed : Explain the actions of the Fed in regard to the three tools.
Find examples in the news to demonstrate the consequences : In addition, comment on some potential consequences of unethical behavior in budgeting. Find examples in the news to demonstrate the consequences.
Examples of two industries with different time : Why might the time frame for the "short run" differ from one industry to the next? Provide examples of two industries with different time frames for the short run. Explain why this is the case.
How many nonisomorphic unrooted trees are there : How many nonisomorphic rooted trees are there with five vertices (using isomorphism for directed graphs)?
Should the bradleys lease the land at that price : The Bradleys' are considering taking out a loan to increase their budget. For each dollar they borrow, how much additional profit would they make? If they borrowed an additional $1,000, would the number of acres of corn and tobacco they plant chang..
Explain the economic term economies of scale : 1. Explain the economic term ‘economies of scale'. 2. Explain both of the economic terms a) specialization of labor and b) specialization of capital.
Equivalent resistance between the terminals a and b : Find the equivalent resistance between the terminals a and b for the figure shown below.
What is the importance of budgets for organizations : What is the importance of budgets for organizations in today's global economy? What budgetary skills do you need to possess to be an effective manager and what will you do to improve those skills?
What does fomc stand for : What does FOMC stand for? What does it do as far as monetary policy? How is the FOMC formed?

Reviews

Write a Review

Mathematics Questions & Answers

  Questions on ferris wheel

Prepare a Flexible Budget Gator Divers is a company that provides diving services such as underwater ship repairs to clients in the Tampa Bay area.

  Logistic map

This assignment has two question related to maths. Questions are related to bifurcation cascade and logistic map.

  Finding the probability of cards

This assignment has questions related to probabiltiy.

  Systems of ode

Find all the xed points, and study their stability and Draw the phase portrait of the system, as well as the graphs of the solutions in all relevant cases.

  Derive the boolean expression

Derive the Boolean Expression and construct the switching circuit for the truth table stated

  System of equations

Evaluate which equations are under-identified, just-identified, and over-identified.

  Linear programming problem

Linear programming problem consisting of only two constraints with one objective function.

  Find the natural domain

Find the natural domain of the given functions.

  Introduction to numerical methods

Compute the coecients of the polynomials using the term recurrence relation.

  Chart of the topological manifold

De?nition of smoothness of functions on a smooth manifold is chart independent and hence geometric.

  Mathematics in computing

Questions related on mathematics in computing.

  Complex problems

Complex problems

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd