1.Under what situation shall engineers use jacking at one end only and from both ends in prestressing work?

2.If a contractor proposes to increase concrete cover beyond contractual specification (i.e. 40mm to 70mm), shall engineers accept the proposal?

3.If on-site slump test fails, should engineers allow the contractor to continue the concreting works?

4.Is it desirable to use concrete of very high strength i.e. exceeding 60MPa? What are the potential problems associated with such high strength concrete?

Reference no: EM13545579

Questions Cloud

Determine the volume of each cfstr : Disinfection by ozone follows first-order kinetics, with a rate constant of 1.2/minute. The town of Obfisquitory wishes to use 4 equal volumes of CFSTR's in series to disinfect 2 million gallons per day (mgd) of water containing 1000 coliforms/L to t..
What is the maximum length of trench that can excavated by : What is the maximum length of trench that can excavated by hand economically rather than by a trenching machine. it cost 900.00 to transport a trenching machine to the job and back to the storage yard. the trenching machine can excavate 265 linear fe..
Determine the design compressive strength for a pinned ended : Determine the design compressive strength for a pinned ended HSS 8x8x3/8 column of ASTM A500, grade B steel with an unbraced length of 35ft?
Should schmidt hammer test be adopted as an alternative test : If concrete compression test fails, should Schmidt hammer test be adopted as an alternative test to prove the concrete strength?
Shall engineers accept the proposal : Is it desirable to use concrete of very high strength i.e. exceeding 60MPa? What are the potential problems associated with such high strength concrete?
What is the difference between direct circulation drilling : Electric power is expensive, piping were built long time ago, population has grown,demand exceeds supply of water. What is the best thing to do ?
What is the maximum length of trench that can be excavated : What is the maximum length of trench that can be excavated by hand economically rather than by a trenching machine. It will cost $900.00 to transport a trenching machine to the job and back to the storage yard.
Calculate the volume of gasoline in the tanker at the time : If the weight of the empty truck and tanker was 120 kN, please calculate the volume of gasoline in the tanker at the time of the crash in m^3. Furthermore, at today’s gasoline price of $2.58/gal, plus the cost of the 18-wheeler (purchase price of $98..
Gross margin and contribution margin income statements : Gross Margin and Contribution Margin Income Statements - Larker Manufacturing's cost accountant has provided you

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd