Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Setup a network Flow for this Problem using nodes and links but do not solve for optimal solution
A manufacturer must produce a certain product in sufficient quantity to meet contracted sales in the next four months. The production facilities available for this product are limited, but by different amounts in the respective months. The unit cost of production also varies according to the facilities and personnel available. The product can be produced in one month and then held for sale in a later month, but at an estimated storage cost of $1 per unit per month. No storage cost is incurred for goods sold in the same month in which they are produced. There is presently no inventory of this product, and none is desired at the end of the four months. Pertinent data are given in the table below.
Month.....Contracted Sales.....Max Production.....Unit Cost of Production.....Unit Storage Cost Per Month1.................20................................40.............................14............................................12.................30................................50.............................16............................................13.................50................................30.............................15............................................14.................40................................50.............................17............................................1
The approach is to create a node for each month, plus a supply node from which the production comes, and a demand node which receives the contracted sales. Lower, upper bounds and cost should be given to each link. An artificial back link from the demand node to the supply node is needed for a fully circulating network. Links connecting the nodes for each month represent carryover inventory.
Prepare a Flexible Budget Gator Divers is a company that provides diving services such as underwater ship repairs to clients in the Tampa Bay area.
This assignment has two question related to maths. Questions are related to bifurcation cascade and logistic map.
This assignment has questions related to probabiltiy.
Find all the xed points, and study their stability and Draw the phase portrait of the system, as well as the graphs of the solutions in all relevant cases.
Derive the Boolean Expression and construct the switching circuit for the truth table stated
Evaluate which equations are under-identified, just-identified, and over-identified.
Linear programming problem consisting of only two constraints with one objective function.
Find the natural domain of the given functions.
Compute the coecients of the polynomials using the term recurrence relation.
De?nition of smoothness of functions on a smooth manifold is chart independent and hence geometric.
Questions related on mathematics in computing.
Complex problems
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd