Reference no: EM13127016
A furniture manufacturer produces sofas, tables, and chairs. The profits per item are, respectively, $70, $120, and $80. The pieces of furniture require the following labor-hours for their manufacture.
Carpentry Upholstery Finishing
Sofas 3 5 1
Tables 8 0 2
Chairs 6 2 1
The following amounts of labor-hours are available each month: carpentry, at most 768 hours; upholstery, at most 216 hours; and finishing, at most 144 hours. You are to determine how many each of sofas, tables, and chairs should be manufactured to maximize profit. (Please show all work)
a) Identify your three variables
b.) Determine the objective function
c.) Determine the constraints
d.) Construct the initial simplex tableau
e.) Using the simplex method, determine the solution that maximizes profit. Be sure to present your solutions in terms of the amount of each furniture type and any unused type of labor-hours.
Setting matrix for assembly and packaging times
: A company manufactures tables and chairs. Each chair requires 2.5 hours of assembly and 0.5 hours of packaging. Each table requires 5 hours of assembly and 0.65 hours of packaging(Please show all work)
|
Calculate the specific heat capacity of zinc
: calculate the specific heat capacity of zinc given that a 65.5g sample loses 2008J of heat when cooled from 100.0 degrees celcius to 21.1 degrees celcius.
|
Auditors report as to consistency
: Which of the following requires recognition in the auditor's report as to consistency?
|
Linear system of equations in real example
: In 2001, 400 seat Boeing 747s were priced at $200 million each, 300 seat Boeing 777s were priced at $160 million, and 200 passenger Airbus A321s were priced at $60 million.
|
Setting and solving linear programming question
: A furniture manufacturer produces sofas, tables, and chairs. The profits per item are, respectively, $70, $120, and $80. The pieces of furniture require the following labor-hours for their manufacture.
|
Ending work in process inventory
: The ending work in process is 60% complete with respect to conversion costs. What cost would be recorded for the ending work in process inventory?
|
How many liters of this water could be contaminated
: Exactly 100 pounds of cane sugar (dextrose), C12H22O11, were accidentally discharged into a small stream saturated with oxygen from the air at 25 celcius.
|
What is the molarity (m) of this saturated solution
: The solubility of O2 (g) in water is 4.43mg O2/100 g H2O (20ºC and 1 atm). What is the molarity (M) of this saturated solution?
|
Percentage-of-completion method
: What would be the effect of the project on 2009 operating income under the percentage-of-completion method and the completed contract method?
|