Sensor once the bluetooth module

Assignment Help Electrical Engineering
Reference no: EM13750310

The matlab code which works for one sensor once the bluetooth module is connected to the laptop bluetooth the data will be continously recieving.

But you need to recieve the data for 5 sec and then stop the data recieving data from sensor by automatically disconnecting and after 5 sec it has to connect automatically and read the data similarly it should repeat.

Attachment:- code.rar

Reference no: EM13750310

Questions Cloud

The diagonal line is the line of equal distribution : 1. In the graph drawn above, the diagonal line is the line of equal distribution of income. The curves, L1 and L2 are Lorenz curves. (i) What is measured on the horizontal axis and what is measured on the vertical axis of the graph? (ii) Why is the d..
How many shares has the company authorized : Suppose a company selling stock for the first time decides that the maximum number of shares that can ever be sold is 44,000. Of that amount, 22,000 shares are sold to the public. After the initial sale, 17,600 shares were reacquired by the company. ..
Uses a job-order costing system-changed to production : The Lee Company uses a job-order costing system. The following data were recorded for June: Overhead is changed to production at 80% of direct materials cost. Jobs 235, 237, and 238 were completed during June and transferred to finished goods. Jobs 2..
What is the cost of goods sold : Below is the activity in Salem Inc's Work In Process and Finished Goods accounts (could be incomplete) for the month of January: What is the cost of goods sold for Salem for January?
Sensor once the bluetooth module : The matlab code which works for one sensor once the bluetooth module is connected to the laptop bluetooth the data will be continously recieving.
Activity based costing provides more accurate allocation : According to a varied contingent in the accounting industry, Activity Based Costing provides more accurate allocation of overhead costs then by using a single plant-wide overhead rate. Others state that the reverse is true.
Ratios against the industry benchmarks for the industry : Compare the calculated financial ratios against the industry benchmarks for the industry of your assigned company. Write a 500 to 750 word summary of your analysis.
No prospect for any capital gains : Charles Horn wants his daughter Sharon to get stock that he owns in Crimson Corporation. He acquired the stock two years ago at a cost of $800,000, and it currently has a fair market value of $650,000. Charles has made prior taxable gifts and is in p..
Evaluate the effectiveness of a scrum : Assignment: Scrum vs. Plan-Based Software Development Strategies, Evaluate the effectiveness of a Scrum approach compared to a plan-based approach

Reviews

Write a Review

Electrical Engineering Questions & Answers

  Describe similarities and differences in cascade control

In most situations it is also desirable to send information from the process to be controlled--in this case the 500-gallon tank--to a central station for processing and storage. This information can be transmitted and processed in different ways.

  What heat sink temp is necessary to ensure safe operation

A power transistor for which Tjmax=180degrees Celsius can dissipate 50Watts at a case temperature of 50degrees. If it is connected to a heat sink using an insulating washer for which the thermal resistance is .6degrees Celsius/Watt

  Determine the line current of the bank at the 120kv side

Three single phase transformers are used to form a three-phase transformer bank rated 13.8kV (delta)/120kV (wye). One side of the transformer bank is connected to a 120kV transmission line.

  Determine what is the max charge in the interval

The total charge accumulated by a certain device is given by as a function of timeby q=18t2-2t4 ( in SI units). What is the max charge in the interval 0

  Calculate minimum number of bits that satisfies criteria

A signal, m(t) which is bandlimited to 20 KHz, is going to be transmitted over a channel a) If the stepsize must be less than  \(.002 m_{p}\) and the number of steps mut be a power of 2, calculate the minimum number of bits that satisfies this crit..

  Design a 10-to-4 encoder with inputs in the1-out-of-10 code

Design a 10-to-4 encoder with inputs in the1-out-of-10 code and outputs in a code like normal BCD except thatinput lines 8 and 9 are encoded into "E" and"F", respectively.

  Calculate overall energy of he and hence excitation energy

In the He Ne laser, an energetic electron is accelerated by the applied field impacts and excites the He from it's ground state 1s2, to an excited H*, 1s12s1, which has one of the electrons in the 2s orbital.

  Determine what is the generators output impedance

Signal generator's internal impedance is purely resistive andhas an open circuit 3.5 V. When the generator is loaded with 22ohms of resistance, its terminal voltage drops to 2.8 volts. What is the generators output impedance (pure resistance )

  Design a fir filter that eliminates the frequency components

A speech signal with bandwidth B= 10 Khz is sampled at F2 = 20 KHz. Suppose that the signal is corrupted by four sinusoids with frequencies. F1 = 10,000 Hz ,F2 = 8889 Hz, F3 = 7778 Hz , F4 = 6667 Hz

  Determine the voltage gain av

If R1 = 220 k Ohms , R2 = 56 k Ohms, Rc = 6.8 k Ohms, RE = 2.2 k Ohms, B= 180, rO = 50 k Ohms, C1 = C2 = 10 uF, CE = 100 uF, and Vcc = 20 V, determine the voltage gain AV.

  Diagram for a state machine that stops when it has read

Draw a state transition diagram for a state machine that reads in a sequence of binary digits, one at a time, and stops when it has read in five 1s (need not be consecutive). To "stop" the machine, merely have it orbit in the state

  Calculate the magnetizing current and core losses

A transformer on no load takes 4.5 A at a power factor of 0.25 lagging when connected to a 120V, 60Hz supply, the number of turns of the primary winding is 250. Calculate the magnetizing current, core losses and the maximum value of flux in the co..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd