Reference no: EM13840913
Schering-Plough Implements a New Global Strategy and Structure
One global company that found itself in trouble in the 2000s because of the way its structure and control systems were working was pharmaceutical maker Schering- Plough. In 2003, Schering was under pressures from many fronts. The Food and Drug Administration (FDA) was demanding a complete overhaul of its global manufacturing plants to increase and protect drug quality, and the patent on Claritin, its best-selling drug, was running out and it had few new products in the pipeline. Thus on both the quality and innovation dimensions, major sources of a differentiation advantage, the company’s strategy was in trouble.
Schering-Plough’s board of directors recruited Fred Hassan, a Pakistan-born Harvard MBA, to turn the company around. After meeting with hundreds of groups of managers and scientists, and visiting the company’s operations around the globe, Hassan began to realize that the company’s main problems stemmed from its global strategy and structure.49
Over time, the company had developed a multidomestic approach to planning its global value-chain activities and it had divided its activities up into world regions, where essentially each world region acted as the product group that made decisions inside its world region/group. The problem was that each of the heads of the regional groups had gained a near total control of their operations, so each world region was doing things such as manufacturing and marketing and sales in its own unique way. As a result, managers at corporate headquarters, and especially its top-management team, were not getting accurate information about the way each region, and especially the country operations within each region, were performing. And major drug quality problems had arisen because the corporate center didn’t find out about the problems at the country level until a long time after they had occurred because of all the bureaucracy that had emerged at the level of the regional groups.
Schering only makes one major type of product drugs so Hassan decided it did not need separate worldwide product groups or separate regional groups. He decided to slash the number of levels in the company’s global corporate hierarchy, eliminating all the layers between the country managers and him. The heads of each international division now report directly to him or one of his top-management team members, so it is much easier to observe and evaluate their performance and that of their divisions. It is also easier to standardize issues such as quality and sales practices around the world. He has also worked to expand the range of products each international division sells to achieve economies of scale. In 2007, for example, Hassan engaged in related diversification when he bought a major Dutch pharmaceutical company that is a leader in producing vaccines for animals and pets, as well as possessing a pipeline of potentially best- selling new drugs it has five drugs in late trials, including an important new treatment for schizophrenia and bipolar disorder.
His new global organizational structure worked so well and sales and profits increased so much that by 2010 it was bought by and became part of Merck, one of its major competitors. Hassan is now the chairman of Bausch & Lomb, an optical products company, where he is applying the same kinds of organizational structure changes to help increase that company’s global competitive position.50
Discussion Questions
1. What kinds of problems was Schering-Plough experiencing with its global strategy and structure?
2. How did Schering Plough change its global structure to solve these problems?
Disputing the delivery of products called for under contract
: Buyer Bobbie Sue and Seller Billy Bob are disputing the delivery of products called for under their contract. Bobbie Sue says that the products that she pre-paid for do not conform to the requirements of the contract, but Billy Bob refuses to refund ..
|
Procurements process of project procurement management
: Project Manager Lani Jo is evaluating whether to have her company’s IT department develop the software needed by her project. Based on the Plan Procurements process of Project Procurement Management, describe the technique(s) and factors Bobbie Sue s..
|
Weighing the pros and cons of investing in more risky
: Comparing potential cars for a purchase, weighing the pros and cons of investing in more risky or less risky stocks, and deciding the best treatment for a diagnosis of cancer are examples of
|
Two most problematic multi-tasking situations-older adults
: The two most problematic multi-tasking situations for older adults are
|
Schering-plough implements new global strategy and structure
: One global company that found itself in trouble in the 2000s because of the way its structure and control systems were working was pharmaceutical maker Schering- Plough. In 2003, Schering was under pressures from many fronts. What kinds of problems w..
|
The ethical dimension
: Bribery and corruption are common in some countries, and for people in those countries, they are a normal part of doing business. U.S. Why does the United States adopt this ethical and legal stance if people in the country accept bribery as the norm?..
|
Ability to develop effective relationships with superiors
: A critical component of a leader’s success is his or her ability to develop effective relationships with superiors, coworkers, and subordinates. Propose and discuss at least three strategies a leader should adopt to enhance his or her relationships w..
|
Base rate of managerial incompetence is estimated
: The base rate of managerial incompetence is estimated to be 50 to 75%. This means that a majority of people in positions of authority have difficulties getting a group of people to work effectively together or get results.
|
Disadvantages ecology and environment
: What are the advantages and disadvantages Ecology and Environment: Business Gets Green?
|