I am facing problem in scheduling and in network analysis so please provide me solution.
Question1) You are a Project Manager and have been asked to manage the project schedule for a given project. The project primarily involves building a prototype product, testing it, and obtaining customer approval.
Question2) the project activities, durations, and predecessors are shown below:
Task Name Duration Predecessors
1 Assemble Team 7 days 0
2 Define Project Scope 7 days 1
3 Develop SOW 7 days 1
4 Build Prototype 5 days 2
5 Create Project Plan 10 days 3
6 Load Firmware 9 days 4
7 Perform System Testing 7 days 5,6
8 Create Production Plan 5 days 5
9 Obtain Customer Approval 4 days 7,8
Question3) Assume that the project begins on 3/4/2010 and that the project team works each day of the week (i.e., including Saturdays and Sundays). Respond to the following below:
- Create an Activity-on-Node network diagram (use Microsoft Visio or some other graphics tool).
- Calculate and state the ES (early start), LS (late start), EF (early finish), and LF (late finish) values (place into the diagram).
- Calculate and state the Total Slack values for each activity (place into the diagram).
- What is the critical path?
- What is the projected project end date?
- If the Load Firmware activity (i.e., Activity 6) duration increases to 11 days, does this change the project end date? Why? If so, what is the new end date?
Computation of degree of financial leverage
: Computation of Degree of financial leverage, operating leverage, degree of combined leverage and what equations to use
|
Compute the maximal value v1max
: An ice block is pushed horizontally on a frictionless surface with initial velocity v0. At some point, it comes to the nearly semicircular bump with a radius R=0.42m and the height h=0.33m above the ground.
|
Evaluate the net sales revenue
: Evaluate the following for Les Fleurs during 20X2 Net sales revenue, Cost of goods sold and Gross profit
|
Rate and efficiency variances for variable overhead
: Determine the rate and efficiency variances for the variable overhead item power cost and indicate whether those variances are unfavourable or favourable.
|
Scheduling and network analysis.
: Facing problem in scheduling and in network analysis so please provide me solution.
|
Computing the annual present value cost of maintenance
: Compute the annual present value cost of maintenance (15 years).
|
What is the gas pressure inside cylinder
: The proper length of one spaceship is 2.8 times that of another. The two spaceships are travelling in the same direction and, while both are passing overhead, an Earth observer measures the two spaceships to be the same length.
|
Determine the after-tax cost to maturity
: For each of the following $1000-par-value bond, assuming annual interest payment and a 40% tax rate, determine the after-tax cost to maturity using the approximation formula.
|
The equivalent resistances of the proposed design
: A 12.0-{rm kg} box resting on a horizontal, frictionless surface is attached to a 5.00-{rm kg} weight by a thin, light wire that passes over a frictionless pulley). The pulley has the shape of a uniform solid disk of mass 2.40 {rm kg} and diameter 0...
|