SBM1101 Project Management Assignment

Assignment Help Project Management
Reference no: EM132472196

SBM1101 Project Management - Asia Pacific International College

Assessment: Article Summary

Assessment Details:

The students are expected to select a published journal article (not older than 5 years) from the field of project management related to Adoption of Agile methodology in Industry (Engineering, Construction or any domain of your choice) and summarize the article's main topic(s), aim/ purpose, key points and conclusions clearly in 400 (min.) to 500 words (max.). Students must provide the article's website link and correctly provide the article's reference in the submitted word file. The link and reference are not included in the word count.

Assessment 2: Case Study

Assessment Details:

This assessment is designed to assess your analytical skills for a failed project. Each student needs to select a real-life project that has already been completed but failed in terms of meeting schedule, budget or customer requirements. Students need to describe specific reasons of mismanagement by the Project Management team that resulted in the failure. Students need to review various project methodologies and recommend an appropriate PM methodology that could have been better suited to manage this failed project. Students need to justify their recommendation to convince the company's management to improve the organization's processes for the future.

Students are expected to discuss their work with lecturer and seek support. By completing this assessment successfully, you will be able to achieve ULO-4 (Apply knowledge and tools to projects in the work environment including setting up relevant systems and controls) and ULO-5 (Analyse project situations including strategic intent, business case, framework or governance issues and recommend solutions).

Assessment 3: Applied Project and Presentation

Assessment Details:

This assessment is designed to assess your technical skills in developing and communicating a project effectively. You are required to form a group (5 students max.). All groups are required to investigate, analyse and report on the correct initiation of the project by applying PMBOK methodology of a case study project that has already been completed. The group needs to select an industrial project from any domain (IT, construction, banking), study the project details and prepare and present the assessment assuming that the group have travelled back in time and are seeking approval of the project from the management for its initiation. The Sydney Opera House, the Chunnel Tunnel, Melbourne's Metro Tunnel are examples of such projects. The report must contain the following project documents:

• Project background
• Project scope
• Draft stakeholder register
• Draft business case
• Draft project charter
• Organisational structure
• Design and application of Balanced Score Card
• Recommendations for project governance

Harvard reference style

Attachment:- Project Management.rar

Reference no: EM132472196

Questions Cloud

Key information systems concepts and technologies : key information systems concepts and technologies evident in the context of contemporary businesses and organisations - Read and research widely on the chosen
Compute the dollar amount of the total current assets : Accounts Receivable 34,200 and Legal Expense 1,700. Compute the dollar amount of the total current assets as it would appear on the December 31 balance sheet
How many years would it take for brockmans eps to triple : Growth rate during the prior 5 years was 3.0% per year. If that growth rate were maintained, how many years would it take for Brockman's EPS to triple?
Calculate the cost per equivalent unit for the period : Smooth as Silk Ltd is a yoghurt manufacturer which uses process costing. Calculate the cost per equivalent unit for the period
SBM1101 Project Management Assignment : SBM1101 Project Management Assignment Help and Solution, Asia Pacific International College - Assessment Writing Service - Applied Project and Presentation
Prepare working paper eliminating entry needed at december : Prepare the necessary consolidation working paper eliminating entries related to the above inu pany transactions at December 31, 2020.
Compute the direct materials price variance for last month : Last month, 3,000 gallons of direct materials were purchased for $22,800. Compute the direct materials price variance for last month
Create depreciation schedule using each of the three methods : Determine How do create a depreciation schedule using each of the three methods: Straight line, Units of Production and Double Declining Balance?
How do create a depreciation schedule : How do you create a depreciation schedule using each of the three methods: Straight line, Units of Production and Double Declining Balance?

Reviews

Write a Review

Project Management Questions & Answers

  What types of strategy should you consider including in plan

Propose one specific example of each type of strategy that you are considering, and present your rationale (reasoning) for your strategy selections.

  Waterfall'' versus agile project environment

How would communication to project teams differ under a 'Waterfall' versus 'Agile' project environment? What are similarities?

  What is crisis management concept

What is Crisis management concept? Elaborate the layout for crisis management and the involvement of stakeholders.

  List the groups of stakeholders and define each group

What were your selection criteria, given what you have learned so far about the nature of projects? Identify the stakeholders involved in this project. List the groups of stakeholders and define each group.

  What additional analyses you undertake to test either choice

What would you have to believe to choose the Latin American/Asian peers beta? What additional analyses would you undertake to test either choice?

  Code your basic html pages and css stylesheet

HTML has been implemented to a high standard - well structured and semantically correct, no errors in work (either through validation or presentation).

  Intra or inter-office politics as project manager

What are some drawbacks to getting involved with intra or inter-office politics as Project Manager?

  Describe how to improve project communications

To improve communications, many projects today have their own website and promote sharing using Web 2.0 tools. Search the Web for at least one Web-based.

  Speedy racer corp currently sells 18000 motor homes per

speedy racer corp. currently sells 18000 motor homes per year at 40000 each and 6000 luxury motor coaches per year at

  Project management and organization-s strategic plan

Describe the connection between Project Management and an organization's Strategic Plan.

  What are some important potential negative consequences

Why is it essential, even in firms with a strong corporate culture, to have a written Code of Ethics? What are some important potential negative consequences of not formalizing a Code of Ethics in written form?

  What is the project irr

What is the project's IRR? Round your answer to two decimal places.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd