Risks factors on future infrastructure projects

Assignment Help Project Management
Reference no: EM13312209

The Three Gorges Dam, completed in 2006, is a hydroelectric dam that spans the Yangtze River by the town of Sandouping, located in the Yiling District of Yichang, in Hubei Province, China. The Three Gorges Dam is the world's largest capacity hydroelectric power station with a total generating capacity of 18,200 MW. Coupling the dam's thirty-two main turbines with two smaller generators (50 MW each) to power the plant itself, the total electric generating capacity of the dam will eventually reach 22,500 MW.

The Three Gorges Dam is potentially one of the largest, if not the largest infrastructure projects completed in the 21st century. Clearly, there were a number of key risks that the construction operation faced in completing this project. Based on your research on the Three Gorges Dam, describe in detail six of the specific risks encountered across the spectrum of topic areas (e.g. technical, environmental, societal impact, operations, etc.) that were identified either prior to or during the construction phase. Describe the specific steps that were taken to mitigate these six risks and how successful those mitigation strategies were. Identify any problems that have resulted since completion of the dam in 2006 for the six risks that you identify. Discuss the methodology you recommend for identifying and mitigating these risks factors on future infrastructure projects.

Verified Expert

Reference no: EM13312209

Questions Cloud

Explain what is the value of kc for the reaction : A 2.0 L container is charged with a mixture of 6.0 moles of CO(g) and 6.0 moles of H2O(g) and the following reaction takes place: CO(g) + H2O(g) CO2(g) + H2(g) When equilibrium is reached the [CO2] = 2.4 M. What is the value of Kc for the reacti..
What is the maximum height the rocket will reach : A rocket takes off vertically from the launchpad with no initial velocity but a constant upward acceleration of 2.25 m/s2. What is the maximum height the rocket will reach above the launchpad
Explain what is the partial pressure of co(g) at equilibrium : For the reaction CO(g) + H2O(g) CO2(g) + H2(g), Kp = 0.64 at 900 K. If the reaction is initiated with just H2(g) and CO2(g), each at a partial pressure of 0.540 atm, what is the partial pressure of CO(g) at equilibrium
Calculate angle the projectile makes with the horizontal : For a 30 degree launch angle, the initial velocity(v0) is 3.12 m/s, the height at which the launcher is shot from has a height(h) of 1.17 m from the ground, Calculate angle the projectile makes with the horizontal just as projectile hits the ground
Risks factors on future infrastructure projects : Identify any problems that have resulted since completion of the dam in 2006 for the six risks that you identify. Discuss the methodology you recommend for identifying and mitigating these risks factors on future infrastructure projects.
What is the net force of the bottom block : consider two blocks of wood, one having mass of 1 kg and the other having a mass of 2 kg. What is the net force of the bottom block
Depict a free energy diagram for the above reaction : 1. Draw the mechanism for the methanolysis of 1-bromo-1-methylcylohexane 2. Draw a free energy diagram for the above reaction
What is the balls change in energy : A ball (m=1kg) is dropped from a height of 3 m. Assume no air resistance. After it bounces off the ground it only reaches a height of 2 m. What is the balls change in energy
Explain the degree of unsaturation for each molecule : How many theoretical stereoisomers are there for morphine, boron-phenylalanine, and lysergic acid diethylamide (LSD). What is the degree of unsaturation for each molecule

Reviews

Write a Review

Project Management Questions & Answers

  Not a feasible production combination

The owner of Chips etc. produces 2 kinds of chips: Lime (L) and Vinegar (V). He has a limited amount of the three ingredients used to produce these chips available for his next production run

  Develop a marketing campaign and explain why

Dentify which research methodologies and resources I should consider using in developing a marketing campaign and explain why.

  Advantages and disadvantages of micromanagement

What are the advantages and disadvantages of micromanagement? What are the advantages and disadvantages of a emphasizing relationships over accomplishment of specific project goals?

  Prepare a mission and vision statement for your organization

Prepare a mission and vision statement for your organization and evaluate at least three specific strategic goals that align with the ideals in those two statements.

  What is the objective for business budgeting

What are these three statements? Describe each of them. What are the generally accepted accounting principles (GAAPs)? Why do we need GAAPs?

  Manage project communications

Manage Project Communications - Explain the tools a project manager may use to control and manage project communications.

  Explaining triple constraints

What are the triple constraints? What key elements are interrelated? What happens if one of the elements changes?

  Project specifications and objectives

Find the project environment, the project phases and project activities and find and allow for critical or uncertain factors in the realisation of the project.

  Relevant project management processes

As the project manager you are required to present an initial project report to the project sponsor that shows how you propose to implement this project.

  Cost function of the market requirement

Is cost often a function of the market requirements and can high quality is achieved at any cost point? Why or why not?

  Define about project failure

Meaningfully manage risks in project management - What is project failure and how can the risk of project failure be reduced

  Disadvantages of bringing in managers from outside

What are the relative advantages and disadvantages of bringing in managers from outside the sports industry versus bringing in managers with experience in the industry?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd