Risks factors on future infrastructure projects

Assignment Help Project Management
Reference no: EM13312209

The Three Gorges Dam, completed in 2006, is a hydroelectric dam that spans the Yangtze River by the town of Sandouping, located in the Yiling District of Yichang, in Hubei Province, China. The Three Gorges Dam is the world's largest capacity hydroelectric power station with a total generating capacity of 18,200 MW. Coupling the dam's thirty-two main turbines with two smaller generators (50 MW each) to power the plant itself, the total electric generating capacity of the dam will eventually reach 22,500 MW.

The Three Gorges Dam is potentially one of the largest, if not the largest infrastructure projects completed in the 21st century. Clearly, there were a number of key risks that the construction operation faced in completing this project. Based on your research on the Three Gorges Dam, describe in detail six of the specific risks encountered across the spectrum of topic areas (e.g. technical, environmental, societal impact, operations, etc.) that were identified either prior to or during the construction phase. Describe the specific steps that were taken to mitigate these six risks and how successful those mitigation strategies were. Identify any problems that have resulted since completion of the dam in 2006 for the six risks that you identify. Discuss the methodology you recommend for identifying and mitigating these risks factors on future infrastructure projects.

Verified Expert

Reference no: EM13312209

Questions Cloud

Explain what is the value of kc for the reaction : A 2.0 L container is charged with a mixture of 6.0 moles of CO(g) and 6.0 moles of H2O(g) and the following reaction takes place: CO(g) + H2O(g) CO2(g) + H2(g) When equilibrium is reached the [CO2] = 2.4 M. What is the value of Kc for the reacti..
What is the maximum height the rocket will reach : A rocket takes off vertically from the launchpad with no initial velocity but a constant upward acceleration of 2.25 m/s2. What is the maximum height the rocket will reach above the launchpad
Explain what is the partial pressure of co(g) at equilibrium : For the reaction CO(g) + H2O(g) CO2(g) + H2(g), Kp = 0.64 at 900 K. If the reaction is initiated with just H2(g) and CO2(g), each at a partial pressure of 0.540 atm, what is the partial pressure of CO(g) at equilibrium
Calculate angle the projectile makes with the horizontal : For a 30 degree launch angle, the initial velocity(v0) is 3.12 m/s, the height at which the launcher is shot from has a height(h) of 1.17 m from the ground, Calculate angle the projectile makes with the horizontal just as projectile hits the ground
Risks factors on future infrastructure projects : Identify any problems that have resulted since completion of the dam in 2006 for the six risks that you identify. Discuss the methodology you recommend for identifying and mitigating these risks factors on future infrastructure projects.
What is the net force of the bottom block : consider two blocks of wood, one having mass of 1 kg and the other having a mass of 2 kg. What is the net force of the bottom block
Depict a free energy diagram for the above reaction : 1. Draw the mechanism for the methanolysis of 1-bromo-1-methylcylohexane 2. Draw a free energy diagram for the above reaction
What is the balls change in energy : A ball (m=1kg) is dropped from a height of 3 m. Assume no air resistance. After it bounces off the ground it only reaches a height of 2 m. What is the balls change in energy
Explain the degree of unsaturation for each molecule : How many theoretical stereoisomers are there for morphine, boron-phenylalanine, and lysergic acid diethylamide (LSD). What is the degree of unsaturation for each molecule

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd