The Stevens Company is converting from the SQL Server® database to the Oracle® database. 

Using the sample shown below, create a Risk Information Sheet for at least five potential risks that might be encountered during the conversion. At least three of the five risks you choose should be project management related.

Risk Information Sheet

Risk Description

Probability

Impact

Rationale

Risk Mitigation

Please note the following:

  • The risk description should fully describe the risk
  • The probability is the likelihood that the risk will occur (i.e., low, medium, or high)
  • The impact is how the organization will be effected if the risk does occur (i.e., low, medium, or high)
  • The rationale should explain the reasons for your probability and impact assessments
  • The mitigation strategy should explain how each risk will be addressed
  • There should be one risk information sheet for each risk identified
  • The risk information sheets can be completed in Word, Excel®, or PowerPoint®

Reference no: EM131498623

Questions Cloud

Conduct the appropriate statistical analyses using spss : With your disease in mind, and the instructor feedback you received on your methods section, conduct the appropriate statistical analyses using SPSS and review.
Permanent and temporary storage confused : This week has been all about storage. People often get permanent and temporary storage confused.
Estimate exit temperature of the ethylene glycol solution : A counter flow evaporator based on R-134a refrigerant has been designed with a capacity of 12 tons of refrigeration. The evaporator is used to cool 50 vol%.
What you have learned about state of social capital in us : What you have learned about the state of social capital in the United States? Are we "Bowling Alone" instead of in groups as in decades past?
Risk information sheet for at least five potential risks : Using the sample shown below, create a Risk Information Sheet for at least five potential risks that might be encountered during the conversion.
Calculate the betas and average returns for all stocks : Calculate the Betas and average returns for all stocks and describe their distributions. Test the hypothesis that Alpha on all your regressions is positive
About its profitability index and discounted payback : Suppose a project has conventional cash flows. About its discounted payback? About its profitability index?
Prepare an equipment schedule for client contract documents : A low-velocity residential air duct is to be equipped with a manufacturer's heating module. It is expected that the module will temper dry air by heating.
Satisfaction for a simpler website : Is it necessary to do full life cycles for simpler websites or not. Even if we do: How can we measure user satisfaction for a simpler website?

Reviews

Write a Review

Basic Computer Science Questions & Answers

  Disruption of the carbon cycle

It will contain an overview of what you have to say about these three topics - disruption of the carbon cycle.

  Loop through the array to determine

Loop through the array to determine if the first name entered exists in the array. If a match is found, display a message that includes the name and a message indicating that there was a match found. If no match is found, display a message so indi..

  What is the difference between an interface and an abstract

What is the difference between an Interface and an Abstract class?

  Create a gui panel using radio buttons to display

Create a GUI panel using radio buttons to display and select the flags and text information.

  Write the definition of the function you defined in part a

Write the definition of the function you defined in part a.

  Write a complete program in a class named showdesign

Write a complete program in a class named ShowDesign that uses the DrawingPanel The window is 200 pixels wide and 200 pixels tall. The background is white and the foreground is black.

  Calculate and label the degree measure of each angle

Draw two triangles where A = 30°, a = 6, and b = 10. Calculate and label the degree measure of each angle rounded to the nearest tenth.

  Determine probability that selected cobalt gets more miles

Standard deviation 3.5 miles per gallon. Determine the probability that the randomly selected Cobalt gets more than 34 miles per gallon.

  Industrial robot for commercial

The first industrial robot for commercial uses was installed in a Japanese plant at Toyota Automatic Loom Company, the parent company of the Toyota Automobile Group. When did this robot go into operation?

  The end-to-end communication

If a frame passes from a station through two switches, then through a router, then through two more switches, and then to the destination station, how many Ethernet frames will there be in the end-to-end communication?

  Implement the structure circular queue with array

Implement the necessary methods for adding, removing the element in succession and retrieving without removing the element in succession. If an operation is invalid, throw an appropriate exception.

  Which account is designated as the owner of a relation

Which account is designated as the owner of a relation? What privileges does the owner of a relation have?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd