Reference no: EM131897053
For this activity, read the attached information about the two projects that you will have due in this course. The outcomes for the course will be assessed in Units 3 and 6. You will be working on a course long project management plan for a project of your choosing. The management plan will be due with two deliverables as stated in the attached directions.
However, in order to ensure that you are on the right track with the projects, each week, there will be a milestone activity. If you have any questions about the project or are not clear about what is due in Weeks 3 and 6, the milestones are the time to check with your instructor. Note that in Unit 3 and in the student resources that there is a matrix for a Risk Register.
For the Unit 2 Milestone, submit a page to your instructor that outlines the project scope statement and some of the risks you believe will affect the project. You should be able to use this milestone to continue working on your project management deliverable for Unit 3 that will include the following:
The following will be included in your Unit 3 deliverable Course Mini Project:
a. Brief explanation of the project and the work environment
b. Scope management plan
c. Project scope statement
d. Risk register (Wysocki (2014) calls this a Risk Driver Worksheet)
e. Work Breakdown Structure (Explain the method used to create the WBS for this project in your paper)
|
What characteristics of ad hoc networks in general
: What characteristics of ad hoc networks in general, and Zigbee specifically, make this sort of network especially suitable for home automation, particularly
|
|
What role did the executives play in the culture change
: What role did the executives play in the culture change? How does this differ from what you would have done to change the culture?
|
|
Develop an outline of the project plan for the testing
: You have been asked to develop a project plan to test the backups of production systems Develop an outline of the project plan for the testing.
|
|
What are the hazardous waste issues
: You have just become the safety manager for Podunk University. Your position is at the campus in Podunk, Colorado, and your predecessor left the job a year.
|
|
Right track with the projects
: However, in order to ensure that you are on the right track with the projects, each week, there will be a milestone activity.
|
|
Which quadrant does your chosen company fit within
: apply the GSM to your organization. Is your choice of grand strategy different from the results from your use of the GSSM ? Discuss.
|
|
Attention to discriminatory practices
: As the workforce has evolved and attention to discriminatory practices has increased, I have noticed that reference checks are becoming less valuable.
|
|
What scientific grounds do you do so
: How do you feel about other couples using such techniques? If you're opposed, on what scientific grounds do you do so?
|
|
Calculate the change in the price of bond
: Using the following formula Triangle P/Triangle R= 1/1+R(P*D) calculate the change in the price of this bond if the yield increases 200 basis points
|