Determine Fire Protection Compliance of Buildings

This task requires you to determine the fire resistance level (FRL) required for the construction of the buildings from Task 3.1.
You must complete Task 3.1 first before proceeding with this task.

Steps to take:

1. Locate the Fire Protection Compliance form provided for you on the following pages.
The Fire Protection Compliance form will be used to determine the level of fire resistance required for the construction of the buildings in the building plans.
Review the instructions here and in the Fire Protection Compliance form with your supervisor before starting so you can prepare for the tasks.

2. Visit each building to determine the following
i. A building component of your choice in each building.
A building's component must include one of the following:
• Walls
• Columns
• Beams
• Floors
• Roof
• Ceilings
ii. The material the building component you chose is made of
iii. Existing passive fire control measures
iv. Existing active fire protection measures
v. Actual thickness of building's chosen component.
3. Using the Fire Protection Compliance form, identify the following for each building:
i. NCC requirement for passive fire control
ii. One existing passive fire control measure
iii. Legislative requirement for active fire protection
iv. One existing active fire protection measure
v. One building component from each building class. Building components must be one of the following:
• Walls
• Columns
• Beams
• Floors
• Roof
• Ceilings
vi. The material used in the construction of the chosen building component
vii. The required minimum thickness of the material to achieve the following fire resistance levels:
• 60/60/60
• 90/90/90
• 120/120/120
• 180/180/180
• 240/240/240
Thicknesses must be in millimetres and based on the BCA Volume 1.
Some materials will have FRLs with provisions only for structural adequacy (the first number). In this case, document the minimum required thickness for maintaining only structural adequacy.
Some materials will have no minimum required thickness for specific FRLs. In this case, write down N/A.
Some materials will have no minimum required thickness for any FRLs. In this case, write down the alternative specifications recommended by the Building Code of Australia Volume 1.
viii. Actual thickness of building's chosen component.
ix. The overall fire protection compliance of each building based on the requirements you have identified.
x. An explanation of your conclusion regarding the building's fire protection
compliance.

4. Have your supervisor review your completed Fire Protection Compliance form. Your supervisor must also complete and sign the Supervisor Declaration at the end of the form. Their signature must be handwritten.

Reference no: EM133183478

Questions Cloud

Determine the depreciation for the current fiscal year : Equipment acquired at a cost of $110,000 has an estimated residual value of $7,000. Determine the depreciation for the current fiscal year
What is valuable in the customers perspective : What is valuable in the customer's perspective is specified and Processes that will ensure value are identified and integrated in projects
Developing strategic management : Organizations have traditionally used a SWOT analysis to assist in developing their strategic management. The PESTLE analysis is currently used as a Strategic M
Main purpose of homestead exemptions : Question 1: What is main purpose of homestead exemptions and circuit breakers?
Review instructions here and in the fire protection : Review the instructions here and in the Fire Protection Compliance form with your supervisor before starting so you can prepare for the tasks
Find report for retained earnings : Kelty Company's year-end financial statements reported the following (in millions):
What could be the effect on the loan amount to be borrowed : Holding the interest rate constant and increasing the amortization period of the loan, what could be the effect on the loan amount to be borrowed by Christina
Explain the differences between the PV and the NPV : Evaluate the factors that you should consider in your investment decision. Explain the differences between the PV and the NPV
Calculate a breakeven point : Marie is now launching her own business called, "Brand You", a small boutique logo and marketing company that can help small businesses with their marketing.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd