CONTRACTING METHODOLOGY AND TYPE SCENARIOS

SCENARIO: Karenna just returned from a Department of Defense management meeting where the dismal state of the budget was the principle topic. She gave Bob the bad news. It is four months before the end of the year closeout and two major requirements came in from the Navy Warfare Center. The funding is dismal, resources are overloaded and Bob is the only contracting officer she can depend on to be fast and accurate when it comes to complex requirements of this nature. Bob must get these requirements on contract by October 1st. Bob must convene an acquisition team and get started right away. Bob will need to come up with an acquisition strategy to include contract methodology and contract type that will encourage efficient funds management and will motivate the contractors to watch the bottom line.

Requirement 1 -The Department of the Navy, Space and Naval Warfare Systems Center Pacific (SSC Pacific) has a requirement to provide Command, Control, Communications, Computers, and Intelligence (C4I) software support activity (SSA) for systems engineering, integration, information assurance, software maintenance, operational support, training and infrastructure support to SSC Pacific Maritime Global Command and Control System (GCCS) Family of Systems (MGF) Project and other C2 and/or C4I projects within Code 532. Period of performance includes a 3-year base period and 2-year option period. The estimated level of effort for the total requirement is 766,025 hours. The NAICS code is 541330.

Requirement 2 – The Department o the Navy, Space and Naval Warfare Systems Center Pacific (SSC Pacific) and Air Force have a requirement to contract for non personal services to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the renovation of an existing aircraft maintenance hangar consisting of approximately 36,908 SF. The project includes but is not limited to the sustainment of interior walls, ceilings, sound attenuation, and internal and external durable surfaces to include roof and exterior metal panel wall replacement. Repair facility paint, floor coverings, millwork, caulk, protective coatings, wall systems, and hangar door structure. Install fire sprinkler systems, additional steel frame support, metal insulated panels, metal barrel roof, interior walls, HVAC systems, communications wiring, restrooms, millwork, utilities, access pavements, fire protection/detection, fire suppression, site work, anti-terrorism force protection measures, erosion control, drainage structures and landscape. Site work includes but not limited to site work including water, electrical, communications, natural gas, sanitary sewer, and storm sewer connections to existing infrastructure.

Task: You are the contracting officer for the acquisitions discussed above. Develop a viable procurement strategy to include determining the contracting method, contract type and risk.   As you determine the contract methodology and contract type keep in mind some concerns and limitations:

-The schedule is aggressive;

-Requirement 1 includes proprietary equipment;

-Limited funds;

-A need for quality because the requirements are vital to national defense.

-Security clearances are another important issue. Whoever win the contract have a Top secret facility clearance, either before or shortly after contract award;

-Past protest on both requirements.

Address the following questions in your response to requirements 1and 2 separately:

1. What contracting method will you use? Why?

2. What are the key risk areas of the efforts?

3. What contract type would motivate the contractor to achieve excellence and manage funds wisely? Why?

Reference no: EM132133564

Questions Cloud

Pay packages explained : Executive pay packages differ substantially from typical salaried or hourly employee compensation because unlike typical employee pay,
Time required to make the fifth and the sixth conveyors : what is the total amount of time required to make the fifth and the sixth conveyors?
Benefit of spending quality time producing detailed : What’s the benefit of spending quality time producing a detailed, specific outline?
Management focus-ford global strategy : What strategy is Mullaly trying to get Ford to pursue with his One Ford initiative? What are the benefits of this strategy? Can you see any drawbacks?
Returned from department of defense management : Karenna just returned from a Department of Defense management meeting where the dismal state of the budget was the principle topic.
Competition is the most harmful form of rivalry : Which of the following descriptions of competition is the most harmful form of rivalry?
The future growth rate of the trees : A firm has a tract of timber. The future growth rate of the trees and the price of lumber are uncertain. The firm:
Viewed as metaphor for team in business situation : How might a jazz quartet, rock band or concert orchestra be viewed as a metaphor for a team in a business situation?
What can managers do to establish and maintain such climate : Organizational learning requires a climate of openness, trust, and honesty. What can managers do to establish and maintain such a climate?

Reviews

Write a Review

Operation Management Questions & Answers

  Introduction to performance management

Introduction to Performance Management. How to Give and Receive Feedback. Conducting the Performance Review.

  How could ges lessons be applied to this firm

Does this firm have the means to execute like GE? Which type of resources would the firm require? How could GE's lessons be applied to this firm?

  Capacity and legality

Who has full legal capacity to enter into binding, legal contracts?

  What is the estimated time of the critical path

Calculate the expected time for each activity. Enter these values in the appropriate column in the table below.

  Should the major decisions on pollution and climate change

Should the major decisions on pollution and climate change be made: By government experts? By scientific experts? By everyone? Amplify the support of your judgment with reference to at least three additional scholarly sources.

  Specification for plastic liner for concrete highway project

The specifications for a plastic liner for concrete highway projects call for a thickness of 4.0 mm 0.3 mm. The standard deviation of the process is estimated to be 0.05 mm. The process is known to operate at a mean thickness of 3.8 mm. What is the o..

  Contrast the various levels of distribution intensity

Compare and contrast the various levels of distribution intensity. Provide two specific examples of products/services that are distributed at each level of distribution intensity and explain the rationale behind the chosen distribution intensity.

  When firm pays for priority positioning

Are such practices ethical? Are consumers being deceived when a firm pays for priority positioning?

  Maintaining success while competing aggressively

FedEx and United Parcel Service (UPS): Maintaining Success while Competing Aggressively.

  Expatriate failure is the inabilty of the spouse

It appears that the major reason for expatriate failure is the inabilty of the spouse and family to adjust to living in another country. What can a company do to ameliorate this?

  How should project iterations be structured to ensure rapid

How should project iterations be structured to ensure rapid progress to completion, high quality, and efficient use of medical practitioner time?

  Three period weighted moving average forecast for period

The demand during periods 1, 2, 3, 4, and 5 are 8, 12, 13, 16, and 16 respectively. Find the three period weighted moving average forecast for period 6. The weights are 0.5, 0.3, and 0.2, with 0.5 being the weight for the most recent actual demand.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd