Research into public sector construction projects that fail to achieve the client's project objectives, indicate that 29% fail because of the procurement risk.
Discuss the above statement and the role and responsibility of the Engineer Project Manager in advising the client through the overall strategic decision process in order to select the most appropriate procurement system for either a private or public sector construction and/or civil engineering project.
Your answer should ideally be about 1500-2000 words.
Note - Students are expected to read and research beyond the Unit course material in order to provide evidence and appropriate references to support, illustrate and underpin their discussions.
Assignment Submission requirements:-
1) An electronic submission of this assignment is required in accordance with the University of Surrey's coursework/assignment submission requirements.
2) In addition to the electronic submission a paper copy is required. This paper copy should be submitted to:- Natasha Martyn, Research Administrator, Room 21 AA03; Dept of Civil and Environmental Engineering; The Thomas Telford Building; Block AA; University of Surrey.
Analyze the use of contingency reserves in failed project
: Analyze the cost estimating techniques used in the failed project, such as top-down or bottom-up. Analyze the estimated costs of all the schedule tasks and resources. Analyze the use of contingency reserves in the failed project
|
Suitable locations for an anshore windfarm in the bristol
: You have to find the three most suitable locations for an anshore windfarm in the Bristol, based on the Baban & Parry method (there is an article attached below). The Babab & Parry method is about making maps with a software called 'arcGIS' and 'a..
|
Improvement in knowledge management
: ONE detailed proposal should be submitted. The proposal should be 3 pages long (single-spaced), excluding appendices (Figures, Tables, etc.). It should focus on improvement in knowledge management In this proposal, you should describe
|
Advantage of the latest building materials
: This project is being undertaken to develop a new office building for Procurement Plaza Inc., located at 925 S. Niagara, Denver, CO 80218. This free-standing office building will be built on ¼ acre and will accommodate the increased staff of Proc..
|
Responsibility of the engineer project manager
: Discuss the above statement and the role and responsibility of the Engineer Project Manager in advising the client through the overall strategic decision process in order to select the most appropriate procurement system for either a private or pu..
|
How pressure changes help with inhalation and exhalation
: Trace the pathway of air through the respiratory system. Discuss how pressure changes help with inhalation and exhalation.
|
How would lowering the estimate of warranty liability affect
: How would lowering the estimate of warranty liability affect the current ratio? How should Jim respond to his boss? Given that Jim's employer is a publicly-traded corporation, what safeguards should be at Jim's disposal?
|
Analyse the threat or opportunity
: Describe any biases that are relevant and need to be avoidedEvaluate the financial impacts of the decision (or of not making the decision) in terms of costs, revenue and/or service levels
|
Elements of a potential wbs
: Q1: Level 1 WBS Elements With reference to the referenced example job drawings list at least 5 Level 1 Elements of a potential WBS. Q2: Level 2 WBS Headings Select 5 of the Level 1 Elements from Q1 and list potential Level 2 Headings under each. ..
|