Responsibility for discrete work

Assignment Help Civil Engineering
Reference no: EM132416282

Problem: It is the project manager's responsibility to ensure that each team member is assigned primary responsibility for discrete work, recognizing there are numerous work items in a project, describe methods for ensuring there will be no overlap or gaps in the work of a project team. Please answer the following question.

Reference no: EM132416282

Questions Cloud

What type of soil is ideal for building foundation : What type of soil is ideal for building foundation? Also what different characteristics of soil are relevant to building foundations?
Discuss the suitability and performance of the coarse : Discuss the suitability and performance of the coarse grained soil for engineering purposes? Also compare to fine-grained soil.
Determine the rotational speed : If the pump is required to deliver water at a head of 30.5 m at maximum efficiency, determine the rotational speed, the discharge, and the required power.
What should the minimum width of the straps : What should the minimum width of the straps be in order to limit the stress to 120 MPa, whereby straps are available in increments of 5 mm widths.
Responsibility for discrete work : It is the project manager's responsibility to ensure that each team member is assigned primary responsibility for discrete work, recognizing
Determine the uniform stress developed : A compressive load of 10 MPA is applied in the Y direction. Determine the uniform stress developed in X and Z directions
Calculate the sensible portion of the humidification : Calculate the sensible portion of the humidification for steam injected into the airstream (BTU/hr). Moist air at 60ºF 20% RH enters a heater and humidifier
Calculate the outlet air temperature : Calculate the outlet air temperature if the inlet air is Twb=32ºF and 40% RH. The air is flowing at 2500 cfm and is sensibly heated at a rate of 80,000 btu/hr.
Calculate the necessary flow rate of air : Calculate the necessary flow rate of air (cfm) moving over a heat exchanger if the heater is rated at 6,000 btu /hr.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the moment of the couple about the z-axis

The arm ABCD of the industrial robot lies in a vertical plane that is inclined at 40? to the yz-plane. The arm CD makes an angle of 30? with the vertical. A socket wrench attached at point D applies a 52-lb · ft couple about the arm CD, directed a..

  What is alkalinity of water expressed as mg per l of caco3

A water sample contains 118mg/L of bicarbonate ion, 19mg/L of carbonate ion, and has a pH of 9.5. What is the alkalinity of this water expressed as mg/L of CaCO3

  What is the tension force in the bolts holding the bend

When a plastics plant is redesigned, a tank exit is now facing the wrong direction and must be connected to a pipe of diameter D=0.2 m with a180o bend in a horizontal plane.

  Determine the moment created by the two forces

Treat the problem as two-dimensional. The moment is positive if counterclockwise, negative if clockwise.

  Find out the normal strain and shear strain in plane ab

A strain arrangement at a point is an shown in fig. Find out the normal strain and shear strain in plane AB.

  Does our non-destructive test have the required sensitivity

To be sure that the part does not fail, we plan to ensure that the maximum applied stress is only one third of the tensile strength. We use a non-destructive test that will detect any internal flaws greater than 1.25 mm long.

  Construct a choice table for interest rates from

QZY, Inc. is evaluating new widget machinesoffered by three companies. The machines have the following characteristics:

  A constant head permeability test was conducted on a clean

a constant head permeability test was conducted on a clean sand sample. the diameter and length of the test specimen

  Estimate the rate of change in the water surface elevation

The river flow at an upstream gauging station is measured to be 1500 m3/s, and at another gauging station 3 km downstream, the discharge is measured to be 750 m3/s at the same instant of time.

  Find your college’s code of student conduct online

Indiana University created an excellent online resource called "How to Recognize Plagiarism" (you can fi nd it here: https://www.indiana. edu/~istd/plagiarism_test.html). Complete the test!

  Determine the tension in cable cd over the smooth square rod

Member ABC is supported by cable CD and a square collar at A that fits loosely over the smooth square rod. Determine the tension in cable CD. The smooth rod is fixed at its base and cannot rotate.

  Force required to balance the plate

Identical bricks 0.1m wide, and weighting 2kg are placed on a plate (assume the plate has neligible weight). Calculate the total weight (and force F required to balance the plate).

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd