Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
It is required to dewater a construction site 80 m by 80 m. The bottom of the construction will be 1.5 m below the initial water surface elevation of 90 m. Four pumps are to be used in 0.5-m diameter wells at the four corners of the site. Determine the required pumping rate. The aquifer has T = 1600 m^2/day and the wells each have a radius of influence of 600 m.
The height (in meters) of a projectile shot vertically upward from a point 2 m above ground level with an initial velocity of 24.5 m/s is h2+24.5t-4.9t^2 after t seconds. a) When does the projectile reach its maximum height? b) What is the maximum..
If the queue clears exactly at the end of the effective green D/D/1 queuing applies, determine the total vehicle delay in the cycle (in veh-sec) .
what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?
The aluminum end and the copper end are maintained at temperatures of 50°C and 260°C, respectively. The thermal conductivities of aluminum and copper are 205 and 385 W/m · K, respectively. The temperature of the aluminum-copper junction in the rod..
A conical tube of length 8 m fixed vertically with its smaller end upwards. The velocity head and pressure head at upper ends are 1.27 m and 2.50 m respectively.
The perpendicular distance between two parallel tangents of a reversed curve is 20m. The azimuth of the back tangents of the curve is 270 00 and the azimuth of the common tangent is 310.
The IIT components of ownership cost based on average annual value are: Tax-3%, Insurance -4%, and Interest-7%. a) What is the average annual value?
Find the total mass, quality of steam, specific volume, specific enthalpy, and specific internal energy.
The brush is immersed in the first volume and agitated until equilibrium is established, removed and the exercise is repeated with the second volume. Assume that the solvent remaining in the brush after it is removed from the first batch is insign..
What is your recommendation for the maximum size of coarse aggregate for the following situation? A continuously reinforced concrete pavement cross section contains a layer of No. 6 reinforced bars at 15.24 cm centers,
Explain about pres-stressed concrete
Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd