Reporting project costs over time introduction

Assignment Help Basic Statistics
Reference no: EM132372914

Reporting Project Costs Over Time Introduction:

Once the activities have been outlined, it is easier to generate a baseline budget. In addition to generating an overall budget estimate, most project managers use checkpoints throughout the project to establish if accumulated expenses are on track and also if those expenses are in line with the earned value (EV) of the project at that checkpoint. The estimated cost of an activity is often broken down into Labor, materials, equipment, facilities, subcontractors, travel and a margin for contingencies (sometimes called 'reserve').

Directions: Describe how a project manager might accumulate and report costs to upper management for an ongoing project. Select at least 2 of the following terms in your post to describe. to-complete performance index (TCPI) planned value (PV) earned value (EV) actual cost (AC) cost variance (CV) cost performance index (CPI) estimate at completion (EAC) earned value management (EVM)

Reference no: EM132372914

Questions Cloud

What planning steps should precede total program scheduling : 1. What planning steps should precede total program scheduling? What steps are necessary?
Explain the difference between projects and operations : Explain the difference between projects and operations. Why do you think project classification is important to organizations?
Suggest an approach to managing client expectations : Suggest an approach to managing client expectations in the highway project that might have resulted in meeting or exceeding expectations
Important aspects of project management : What are the top three most important aspects of Project management?
Reporting project costs over time introduction : Once the activities have been outlined, it is easier to generate a baseline budget. In addition to generating an overall budget estimate
Culture constrains strategy : What do you think about this statement: Culture constrains strategy.
What are some deterministic and non-deterministic approaches : What are some deterministic and non-deterministic approaches in a project management context? How does it link to the philosophical basis for PM traditions
Why should you make assumptions in project management : Why should you make assumptions in project management? How can assumptions help define scope and risks for time and cost?
What are some examples of specific items : What are some examples of specific items (or tasks) that should be outlined in the scope in an IT project? What is an example of a specific scenario in an IT

Reviews

Write a Review

Basic Statistics Questions & Answers

  Statistics-probability assignment

MATH1550H: Assignment:  Question:  A word is selected at random from the following poem of Persian poet and mathematician Omar Khayyam (1048-1131), translated by English poet Edward Fitzgerald (1808-1883). Find the expected value of the length of th..

  What is the least number

MATH1550H: Assignment:  Question:     what is the least number of applicants that should be interviewed so as to have at least 50% chance of finding one such secretary?

  Determine the value of k

MATH1550H: Assignment:  Question:     Experience shows that X, the number of customers entering a post office during any period of time t, is a random variable the probability mass function of which is of the form

  What is the probability

MATH1550H: Assignment:Questions: (Genetics) What is the probability that at most two of the offspring are aa?

  Binomial distributions

MATH1550H: Assignment:  Questions:  Let’s assume the department of Mathematics of Trent University has 11 faculty members. For i = 0; 1; 2; 3; find pi, the probability that i of them were born on Canada Day using the binomial distributions.

  Caselet on mcdonald’s vs. burger king - waiting time

Caselet on McDonald’s vs. Burger King - Waiting time

  Generate descriptive statistics

Generate descriptive statistics. Create a stem-and-leaf plot of the data and box plot of the data.

  Sampling variability and standard error

Problems on Sampling Variability and Standard Error and Confidence Intervals

  Estimate the population mean

Estimate the population mean

  Conduct a marketing experiment

Conduct a marketing experiment in which students are to taste one of two different brands of soft drink

  Find out the probability

Find out the probability

  Linear programming models

LINEAR PROGRAMMING MODELS

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd