Replacing the track on an existing railroad line

Assignment Help Civil Engineering
Reference no: EM132637406

A project consists of replacing the track on an existing railroad line, involving 3,000 feet of track. The old track can be removed at a rate of 70 feet per hour. The old railroad ties can be removed at a rate of 200 feet (measured along the track) per hour. The new ties can be installed at a rate of 25 feet per hour, and the replacement track can be installed at a rate of 40 feet per hour. Show this operation on a linear schedule. Assume that the minimum float (buffer) for an activity at any location is 1 day.

Graph for your answers. Label both the x and y axes with the units. Label the start and end times of each task.

Reference no: EM132637406

Questions Cloud

Demonstrate the company break-even point in unit sales : Demonstrate the company's break-even point in unit sales. In its third year, Haas produced 40,000 units and sold 65,000 units. The selling price of the company
List down the four system of water distribution : List down the different the methods of "Distribution of Water" employed in a "Water Works Project" or "Municipal water supply".
Explain normal and shear stress acting on plane : Question#1: Define and Explain Normal and Shear stress acting on plane and also its determination by plotting Mohr Circle.
Prepare the appropriate journal entry to record income tax : At December 31, 2021, Lance has a warranty liability of $2 million and taxable income of $75 million. Prepare the appropriate journal entry to record income tax
Replacing the track on an existing railroad line : A project consists of replacing the track on an existing railroad line, involving 3,000 feet of track. The old track can be removed
Most probable value of the observed rod readings : The following values were determined in a series of rod readings made under identical conditions: 3.312, 3.307, 3.304, 3.306
How are variable and fixed costs determined : How are variable and fixed costs determined using the high-low method of cost estimation? Explain in detail and provide the specific example.
Determine the relative precision of single : Determine the relative precision of single measurement and the relative precision of the mean.
Calculate the Unit Variable Costs : All of Administrative Costs and Other Fixed Costs will be considered as FC. Calculate the Unit Variable Costs

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd