Major Project Project – Reinforced Soil Wall Design <br/>Introduction <br/>Your project group is required to design a section of reinforced soil wall (RSW) supporting a section of highway in the Newcastle area. The following information are provided: <br/>Retaining wall plan, elevations and cross-sections <br/>Borehole log BHA051 <br/>No groundwater information – adopt groundwater level at ground surface in front of wall <br/>Loading situation: <br/>o Normal live load traffic, 20 kPa <br/>o Impact loading applied to crash barrier sitting on retaining wall in document "PLANS". <br/> <br/>Retaining Wall Section to Design <br/>RW-19 at Chainage 360 <br/>Design Criteria <br/>Maximum vertical settlement 300 mm <br/>RSW designed to QA Specification R57 <br/>Output Required <br/>Write a report explaining clearly the design methodology, assumptions and recommended design. The report should include: <br/>Geotechnical model – subsurface and geotechnical parameters <br/>Analysis – bearing capacity, sliding, overturning, global stability, settlement <br/>Required retaining wall dimensions and details, i.e. RSW block width <br/>Ground treatment (if necessary)

Reference no: EM13473266

Questions Cloud

A1 limousine service presents service to and from newark : a1 limousine service offers service to and from newark airport to princeton new jersey. john wheels the president of a1
Which scenario assuming normal distribution should you : which scenario assuming normal distribution should you select if you want at 95 confidence interval a 16 probability of
The owner of torpid oaks bampb wanted to know the average : 1. a random variable is binomially distributed with n 16 and pi .40. the expected value and standard deviation of the
The national center for education statistics reported that : the national center for education statistics reported that mean number of instructional computers per public school
Reinforced soil wall major project project reinforced soil : major project project reinforced soil wall design ltbrgtintroduction ltbrgtyour project group is required to design a
At a certain university 25 of students support the green : at a certain university 25 of students support the green party. suppose we take samples of size 100 students and are
What is the r and adjusted r-square for all independent : a cancer specialist from the los angeles county general hospital lacgh rated patient optimism in 20- to 40-year-old
A triangle has a perimeter of 34 inches the medium side is : a triangle has a perimeter of 34 inches. the medium side is 4 more than the short side and the longest side is 4 times
Suppose answer to above question is yes indicate how many : macys department stores accepts several credit cards. the chief operating officer of macys is interested in finding out

Reviews

Write a Review

Civil Engineering Questions & Answers

  Report on separate eligible bachelors

Calculate the numbers of married men, single men, married women and single women. Print these numbers on a student summary report. If any single men are over 30 years of age, print their names and ages on a separate eligible bachelors report.

  Determine effective annual interest rate for a nominal rate

Determine the effective annual interest rate for a nominal rate of 8% per year, in which is compounded quarterly.

  Find the minimum angle for alpha that allows the boxes

Box 1 weighs 284.49N Box 2 weighs 421.83N. The angle between box 2 and the ramp is 37deg. Find the minimum angle for alpha that allows the boxes to remain stationary.

  Find horsepower lost to friction between reservoir and jet

water from a reservoir is being supplied to a powerhouse that is located at an elevation 935 ft below that of the reservoir surface. Discharging through a nozzle, the water has a jet velocity of 240 fps and a jet diameter of 6 in.

  Find change in depth and in absolute water level produced

water is flowing at a velocity of 10ft/s and a depth of 10ft in a channel of rectangular section. find the change in depth and in absolute water level produced by a smooth upward step of 1 ft. a smooth downward step of 1 ft in the channel bed.

  Determine the x-y and z components of reaction at the pin

The member is supported by a pin at A aand a cable BC. If the load at AD is 300 lb, determine the x,y,z components of reaction at the pin A and the tension in cable b c

  Determine what minimum diameter piston is required

A hydraulic cylinder must produce a minimum force of 3 kN for a pressure of 800 kPa. What minimum diameter piston is required

  Determine what is the diameter of the capillary tube

You are designing a new thermometer using Galinstan, an alloy of gallium, indium, and tin that is a liquid at normal living temperatures. The coefficcient of thermal expansion is 190*10^-6 (1/kelvin).

  Describe the application of geophysical techniques

Describe the application of geophysical techniques using electromagnetic induction as a tool for sustainable soil and water management of agricultural fields in the humid tropic Caribbean 300 word limit".

  Determine the strain in wires de and bc

If the weight causes B to be displaced downward 0.025 in., determine the strain in wires DE and BC. Also, if the wires are made of A-36 steel and have a cross-sectional area of 0.002 in^2

  What investment can be justified for the new surface

Annual maintenance cost for a particular section of highway pavement are $2000. The placement of a new surface would reduce the annual maintenance cost to $500 per year for the first 5 years and to $1000 per year for the next 5 years.

  Can the new device be justified at a toll gate

Cars arrive at a toll gate on a freeway according to a Poisson distribution with mean 90 per hour. Average time for passing through the gate is 38 seconds. Drivers complain of the longwaiting time.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd