Reference no: EM13669815
Based on your chosen EHR for your facility, develop the following tools to reinforce ongoing monitoring activities. Also outline a list of system maintenance team members, along with their responsibilities. This team may or may not be similar to your project management team.
Consider the ongoing activities that have to occur when selecting your team members.
1. Incident Reporting Form
2. Ongoing Maintenance Schedule
3. Team Roster with outline of responsibilities
In a one-page summary, explain the similarities and differences in your project management team (SEE BELOW FOR PROJECT MANAGEMENT TEAM) and system maintenance team.
Also explain why the age of a system is a significant factor in determining the type of maintenance.
Along with your summary, submit the incident reporting form, ongoing maintenance schedule, and team roster with responsibilities.
You submission should include any references that were used in APA format.
***PROJECT MANAGEMENT TEAM OUTLINE LISTED BELOW***
The project charter is the first step in any project which includes assigning a project manager to a project post sign off from the sponsors. Once project charter is created and signed then only project is initiated in the company. Also organization knows about the projects moving in an organization.
- Best in class Quality policy - ensuring the Quality of the new work is not jeopardized and is in lines if not better than the industrial standard followed by similar organizations. Moreover the project should be qualitatively judged to bring down the turnaround time without affecting the overall standard of the process.
- Milestone reviews for better after management - keeping the organizational enhancements in track and ensure the new project is timely reviewed for better results.
- Standard operating procedures - following the predefined credo of operational practices as charted out by the organization.
- Predefined methodology for project management, within the matrix organization structure, so that most of the in-house issues in the project are automatically resolved.
Deliverables and project specifications:
The deliverable of the project is broadly restrained to three major buckets:
- Evaluating the software and hardware vendors for the Information technology.
- Selecting and acquiring an information system begins with a needs assessment
- Raising the RFP against the same.
.
Project Work Breakdown structure and methodology:
As already noted in the scope and charter, the project is required to be in sync with the 3 major deliverables alongside being in lines with other organizational standard practices that were in place.
For that to happen, the Work Breakdown structure is very crucial. To start off with a few major subtasks is to be created and then resources are needed to be allocated to them accordingly (Thayer& Yourdon, 2000).These tasks would include:
- Creating a work project scheduling: to identify all the tasks involved and backtracking the ending date to get step by step breakdown of the work in hand, along with the time requirements.
- Creating accurate cost estimates: to prudently allocate the available $1,00,000 to the parties involved in the project and get the project up and rolling in the given deadline of 3 months.
- Creating a staffing authority: to ensure proper staffing is available to create the project deliverables.
- Creating a responsibility assignment matrix: to ensure responsibilities are properly distributed and someone or the other is made accountable for each action undertaken.
The work breakdown additionally requires a skill gap mapping to bridge up the requirement and availability of skill set for the workers and also needs the hiring of 3 database developers to work full time with the project team to ensure completion of the project in the assigned time frame of 3 months.
Find what must be its speed if the pitchers claim is valid
: A pitcher claims he can throw a baseball with as much momentum as a 4.00 gram bullet moving with a speed of 1200 m/s. Find what must be its speed if the pitcher's claim is valid
|
Calculate speed of block at instant the dielectric leaves
: Consider a horizontal square plate capacitor of area 1*1 m2, capacitance in vacuum 3.5 μF, which contains a dielectric material with dielectric constant K=5. The dielectric slides frictionless and is attached via a mass less string and a mass less pu..
|
Determine its maximum speed and acceleration
: Atoms in a solid are not stationary, but vibrate about their equilibrium positions. determine its maximum speed and acceleration
|
Effective coeff of kinetic friction
: A 290kg metal box is on an incline of 29 degrees and slides down4.3 m. It is kept from accelerating by a man who is pushing back on it parallel to the incline. The effective coeff of kinetic friction is 0.40.
|
Reinforce ongoing monitoring activities
: Develop the following tools to reinforce ongoing monitoring activities
|
Compute the young modulus of the wire
: A 5.0 x 102 Newton weight is hung from the end of a wire of cross-sectional area 0.010 cm2. Compute the Young's modulus of the wire
|
English language lesson plan
: Looking for an english language lesson plan for complete beginner adults. There are two of them and they are staff from a restaurant and their lesson needs to be related to their work mostly.
|
Discover the binding energy per nucleon of its nucleus
: The artificial element seaborgium, atomic number Z = 106, has a highly unstable isotope 263Sg106, which has atomic mass (mass of the neutral atom, including the electrons) 263.1186 u. Discover the binding energy per nucleon (BE/A) of its nucleus.
|
Define what is the coefficient of friction
: A block weighs 2000 Newton. If a horizontal force of 100 N is required to keep it in motion with a constant velocity on a horizontal surface, define what is the coefficient of friction
|