Task 1 - Civil Works Design

You are required to undertake a civil construction design project as outlined below. Your Assessor will take the role of the client for the purposes of this assessment task.

Design Specifications

The Problem
You are a civil designer working for the state department of transportation. You have been assigned responsibility for the design of a truss bridge to carry a two-lane highway across the river valley shown below.

1147_Design Objective.jpg

 

Design Objective
Satisfy all of the specifications listed below, while keeping the total cost of the project as low as possible.

Bridge Configuration
The bridge may cross the valley at any elevation from the high water level to 24 meters above the high water level.

If the elevation of the bridge is below 24 meters, excavation of the river banks will be required to achieve the correct highway elevation.

To provide clearance for overhead power lines (shown above), the highest point on the bridge may not exceed an elevation 32.5 meters above the high water level (8.5 meters above the top of the river banks).

The bridge may consist of either standard (simple supports) or (arch supports). If necessary, the bridge may also use one intermediate , located near the centre of the valley. If necessary, the bridge may also use cable , located 8 meters behind one or both abutments.

Each main truss can have no more than 100 and no more than 200 .

The bridge will have a flat, reinforced deck. Two types of concrete are available:

Medium-strength concrete requires a deck thickness of 23 centimetres (0.23 metres).

High-strength concrete requires a deck thickness of 15 centimetres (0.15 meter).

In either case, the deck will be supported by transverse spaced at 4 metre intervals. To accommodate these floor beams, your must have a row of joints spaced 4 meters apart at the level of the deck. These joints are created automatically when you begin a new design.

The bridge deck will be 10 meters wide, such that it can accommodate two lanes of traffic.

Member Properties
Materials. Each member of the truss will be made of either carbon steel, high-strength low-alloy steel, or quenched and tempered steel.
. The members of the truss can be either solid bars or hollow tubes. Both types of cross-sections are square.
Member Size. Both cross-sections are available in a variety of standard sizes.

Loads
The bridge must be capable of safely carrying the following loads:
Weight of the deck.
Weight of a 5-cm thick , which might be applied at some time in the future.
Weight of the steel floor beams and supplemental bracing members (assumed to be 12.0 applied at each deck-level joint).
Weight of the main trusses.
Either of two possible truck loadings:
Weight of one standard H25 truck loading per lane, including appropriate allowance for the dynamic effects of the moving load. (Since the bridge carries two lanes of traffic, each main truss must safely carry one H25 vehicle, placed anywhere along the length of the deck.)
Weight of a single 480 kN Permit Loading, including appropriate allowance for the dynamic effects of the moving load. (Since the Permit Loading is assumed to be cantered laterally, each main truss must safely carry one-half of the total vehicle weight, placed anywhere along the length of the deck.)

Structural Safety
The bridge will comply with the structural provisions of the state specified standards, to include:
Material densities
Load combinations
Tensile strength of members
Compressive strength of members

Cost
The cost of the design will be calculated using the following cost factors:
Material Cost:
Carbon steel bars - $4.50 per kilogram
Carbon steel tubes - $6.30 per kilogram
High-strength steel bars - $5.00 per kilogram
High-strength steel tubes - $7.00 per kilogram
Quenched and tempered steel bars - $5.55 per kilogram
Quenched and tempered steel tubes - $7.75 per kilogram
Connection Cost: $500.00 per joint
Product Cost: $1000.00 per product
Site Cost:
Reinforced concrete deck (medium strength) - $5,150 per 4-meter panel
Reinforced concrete deck (high strength) - $5,300 per 4-meter panel
Excavation - $1.00 per cubic meter (See the Site Design Wizard for excavation volume)
Supports (abutments and pier) - Cost varies (See the Site Design Wizard for specific values)
$6,000 per anchorage

Required:
1. Make a detailed list of all constraints and requirements to the bridge design.
2. Prepare functional specifications
3. Present at least 2 designs to meet the design specifications. The designs are to include, as relevant:
calculations, which may include:
loads
sheer forces
bending moments
stresses
construction materials and services quantities
construction cost estimates
recommended sizing of components
recommended materials
recommended reinforcement sizing and location
drawings
risk assessment of:
the existing conditions
the application of the design
maintainability of the works
health, safety and environmental requirements
contribution to ancillary documentation, which may include:
design notes
construction notes
supplementary drawings
input to the specifications

Note: The designs, and their development, should comply with relevant requirements including:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
Code of practice
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation

Reference no: EM133169464

Questions Cloud

Prepare a monthly manufacturing overhead flexible budget : Prepare a monthly manufacturing overhead flexible budget for the year ending December 31, 2022, assuming production levels range
Prepare all related journal entries to record the franchise : Prepare all related journal entries to record the franchise of Medhealth Bhd for the year ended 30 June 2020 and 30 June 2021
How is the client included in design concept development : Outline a strategy to facilitate collaboration on an engineering project - What should happen after the design review
Compute the selling price per unit : Compute the selling price per unit if the company uses the variable cost method and plans a markup of 250% of variable costs
Recommended reinforcement sizing and location : Undertake a civil construction design project as outlined below. Your Assessor will take the role of the client for the purposes of this assessment task
What would total recruiting cost be for baldwin next year : The goal of this additional investment is to improve the quality of applicants. What would the total recruiting cost be for Baldwin next year
Prepare the journal entry to record income tax expense : Prepare the journal entry to record income tax expense, deferred income taxes, and income taxes payable for 2023, assuming taxable income of $325,000
How much more revenue would it have brought : Had they sold their entire inventory at their current prices, how much more revenue would it have brought to Andrews Corp.
Evaluate the moral obligation of a taxpayer in maine : California's public university system (UC and Cal State) is the largest in the country. Evaluate the moral obligation of a taxpayer in Maine

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine total volume of the sandy silt for construction

The in-situ bulk density of the sandy silt is 1.92 Mg/m^3 and its average water content is 13%. determine: a) the total volume of the sandy silt that must be removed from the borrow pit for construction of the embankment

  Determine the amount of money saved per year associated

A 2005 Chrysler Town and Country MInivan has a frontal area of 2.9m2 and a drag coefficient of 0.35. A 2000 Honda Insight has a frontal area of 1.9m2 and a drag coefficient of 0.25.

  Look at the required volume of clearwell needed

A small city is evaluating disinfection requirements for their drinking water plant. With an average flow of 5 MGD and a peak flow of 9 MGD, determine the controlling CT factor (virus or giardia

  Determine the horizontal and vertical components

Determine the horizontal and vertical components of reaction at the support and Determine the forces in members 17, 19, 20, 16 and 21. State if the members

  Determine what is the concentration of particles in the air

A hi-vol clean filter weighs 18.00 g. After a 24 hour sampling period the filter is removed and weighs 18.65 g. The initial flow rate through the filter was 2.5 m3/min.

  Compute the maximum service

Compute the maximum service (unfactored) concentrated live load that can be applied at 1ft from the free end of the cantilever. Use load and strength -reduction factors from ACI Code Sections 9.2 and 9.3. Also check As,min.

  Find the speed of the blocks after block

Block one has a mass of 1.5kg. Block two has a mass of 3.0kg. Treatthe pulleys as hoops. The radius of pulley one is 8.70m. The massof pulley one is 4.5kg.

  What are the restrictions on interior finish materials

What are the restrictions on interior finish materials? Outline in complete detail the requirements for emergency egress from the building.

  Program that allows a user player to navigate a robot

Write a program that allows a user player to navigate a robot through a maze from the start position at the bottom left of the maze, to the centre of the maze.

  Describe the differences among the three main clay minerals

Describe the differences among the three main clay minerals.

  Find how many dimensionless parameters govern this problem

The flowrate Q over a rectangular sharp crested weir depends on the width of the notch b, the head on the weir H, and the acceleration due to gravity g.

  Find the optimum number if technicians needed

A computer technician can handle on average 5 service calls per day. The cost of adding a technician (C1) is $200 per day and the estimated cost of waiting per incident (C2) is $250 per day.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd