Recognise potential engineering problems

Assignment Help Civil Engineering
Reference no: EM133104604

Assignment:

Task 1 Provide an update on your project proposal

The learning outcomes in this task are:

Questions 1a:

Identify and refine objectives and content for the execution of a project.

Gather, analyse, evaluate and critically evaluate relevant material for use in a project.

Demonstrate your ability to recognise potential engineering problems in developing technologies and solve them using innovative (research based) analytical and experimental techniques.

Demonstrate your understanding of engineering principles and techniques and the ability to apply them to accomplish a project.

Question 1b:

Identify and refine objectives and content for the execution of a project.

Question 1c:

Demonstrate that you can organise yourself and your work appropriately and keep systematic records, evaluate and seek ways to improve your plans, progress and achievements.

Question 1 What has changed since TMA 01?

Update your project using the structure given below:

Question 1a Specific title, aim(s) and objectives for the project
Confirm the specific title and principal aim you have chosen for your project. Give the key objectives of your project.

Question 1b Schedule for the project
Give a schedule for your work on this project. This should include a breakdown of the planned tasks and how they support the objectives. They should have estimates of their duration and their relationship to each other (e.g. concurrent or sequential). It is expected that you will produce a detailed graph such as a Gantt chart showing your proposed schedule.

Question 1c What resources do you expect to use?
In order to complete your project, you may anticipate requiring equipment or software. If so, your tutor needs to know about such a requirement. If you do anticipate any such requirement, state what it is and what you have done, or intend to do, to ensure you are able to meet it. Alternatively, if you do not anticipate requiring any extra equipment or software, make sure you acknowledge this so that your tutor is informed. 5 marks are available for the evaluation of resources and of the link to the project aims.

Task 2 Execute a literature review

The learning outcomes in this task are:

To gather, analyse, evaluate and critically evaluate relevant material for use in a project.

To demonstrate a self-awareness of the skills and activities needed to carry out a project by listing, describing and practically demonstrating them.

To execute a comprehensive literature search relevant to your project topic and critically review it in relation to project objectives.

Use your literature sources to describe the development of your methods. Summarise the key engineering points from your work so far. Explain clearly how they contribute to meeting your project objectives.

Task 3 Describe the development of your proposal

Learning outcomes in this task are:

Demonstrate competence in the use of the principles and conventions of project management and execution.

Demonstrate a self-awareness of the skills and activities needed to carry out a project by listing, describing and practically demonstrating them.

This part of the assignment asks you to reflect on your project work so far. This covers the period from when you first learned of the generic titles up to the submission of this assignment. You should refer to your project log in responding to the following questions.

Question 3a
Consider the methods that you have used to produce your proposal. Below are a series of questions which might help you structure your answer. You are not expected to answer all of them.

Which methods used to develop your project aims have worked well? Which methods did not? Why was this? What would you do differently? How would you distinguish between an academic and a work project?

Question 3b
How did the feedback from your TMA 01, initial pro forma and any emails with your tutor affect the development of your proposal? Add any relevant material regarding your discussions in an Appendix to this assignment.

Attachment:- Project proposal assessment.rar

Reference no: EM133104604

Questions Cloud

Compute net present value of the new coal mine : Annual cash costs linked with the new mine are expected to be $500,000. Compute net present value (NPV) of the new coal mine
Produce a technical report and a poster presentation : Identify and refine objectives and content for the execution of a project and Show that you have considered the requirements of the EMA by outlining
Prepare the entry to record the issuance of the bonds : The bonds were selling at 96, and the warrants were selling for $40 each. Prepare the entry to record the issuance of the bonds and warrants
Mapping the mind-framework of positive psychology : You will assess your own life within the framework of positive psychology. Specifically, you will assess and reflect upon your self-awareness,
Recognise potential engineering problems : Recognise potential engineering problems in developing technologies and solve them using innovative (research based) analytical and experimental techniques
What amount must the ex-wife include in gross income : During the year, Darryl pays a total of $50,000 to his ex-wife. What amount must the ex-wife include in gross income
Determine the double-declining-balance rate : A building acquired at the beginning of the year at a cost of $60,800 has an estimated residual value of $4,300. Determine the double-declining-balance rate
Management of health information : Descriptions of how you plan to prevent and mitigate identity theft. Descriptions of the training you will provide to the staff.
What are the earnings per common share : The firm has 100,000 shares of common stock outstanding and is in the 30 percent income tax bracket. What are the earnings per common share

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd