Real life project case study

Assignment Help Project Management
Reference no: EM131030964 , Length: word count:5000

Assessment Task

Lodged directly via turnitin link on LMS.

Description of Task

A 5,000 word group report which will focus on a real life project case study, examining issue and challenges across each project lifecycle phase.

- Identify project goals and deliverables, stakeholders and project-specific risks.

- How is project implemented

- documentation time, cost and quality parameters

- management tools to monitor and control projects

- uses and application of effective project management techniques throughout the project life cycle

Some contruction project (L&T)

Verified Expert

The need of this assignment is to consider a project and provide information on project implemented, documentation time has bee done in table format, cost and quality has been discussed. Management tools to monitor and control the project is also discussed. Ten uses of application of effective project management techniques are discussed, risks are mentioned at the end with introduction of Lanco Infrastructure and Anpara D in the beginning.

Reference no: EM131030964

Questions Cloud

Which vectorcal could control these costs : Examine the methods that VectorCal could use for estimating the direct costs. Next, specify two to three (2-3) ways in which VectorCal could control these costs. Explain your rationale.
Discuss how time costs affect health care demand : Discuss how time costs affect health care demand, and speculate on this and possible other reasons for the lower observed per capita demand for health care in the western US?
How evernotes phil libin keeps communication flowing : “How Evernote’s Phil Libin Keeps Communication Flowing” and its related Challenge Case Summary were written to help you better understand the management concepts contained in the same chapter. List three problems that could have resulted at Evernote ..
Production of a widget is currently a two-stage process : You are the manager of a widget factory. Production of a widget is currently a two-stage process. The first stage (cutting and planing) takes 3 minutes per unit of input. The output of the first stage is then finished in the second stage, which takes..
Real life project case study : Identify project goals and deliverables, stakeholders and project-specific risks - How is project implemented and documentation time, cost and quality parameters
Represents a group of investors : Morris-Meyer Mining Company must install $1.5 million of new machinery in its Nevada mine. It can obtain a bank loan for 100% of the required amount. Alternatively, A Nevada investment banking firm that represents a group of investors believe that..
Development of a prototype dryer using biogas fired system : It should involve literature review, design, construction and carrying out experiments. also result of the experiment be analysed using statistical tools.
What is the upper and lower control limits for the p-chart : If each sample taken has 500 units, and the average proportion nonconforming is 0.034
Provide energy in such a way that human health is preserved : Provide enough energy that Earthlings can maintain a high quality of life on our new planet. Provide energy in such a way that human health is preserved.

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd