QUESTION

The "Solar Mobile" Project

Looking back, "solar mobile" (mobiles that works using light, like solar calculators) project has never been launched. Documents relating to technical aspects of the product were generated during 1990's - including a 200-page proposal. This proposal was circulated to the technical experts and not the sales or marketing people who would be responsible for the return of investment that the new product would produce. In early 2000, no one on the development team was able to produce a copy of this document. Though, only the "design description document" produced at end of the study phase was circulated among team members directly concerned with that document.


The project was intended to be a combined venture between two companies - Wireless Communications Ltd and Mobile Computing Ltd, based on possible synergies generated by combining two of their existing offerings. The firms were supposed to become part of same owning group during the 1980s buyout. But this initiative did not materialize. They had fundamentally, products with dissimilar characteristics though there were some similarities in the technology being used.

There was important excitement caused by the possible for the new product - it provided a much-needed replacement of batteries that conservative mobiles use. The latter require frequent re-charging or even replacement, if mishandle. It would be also be possible for conventional mobiles using batteries to be upgraded to this new version by fixing a special accessory to them. According to market research carried out, the advent of the solar mobile would open the market to both public or private sector clients as well as individual users to a much wider range.

At end of 1995, there was a meeting of the project participants from both sites on neutral territory. They considered what could go wrong with the project. A total of 152 potential problems were identified that could lead to project failure. These included disagreements with regards to design specifications and design requirements, departure of key personnel, as well as failures in the technical elements of the process. Also, human factors (ergonomics), that is, the interaction of human being with the device and its future consequences were insufficiently considered when designing the mobile.

At board of directors' monthly meeting in February 1998, project manager, Mr. Thomas Mudcat, reported that work had started in earnest. He noted that there were fundamental conflicts and difference in the approaches of the two firms (Wireless Communications Ltd and Mobile Computing Ltd) involved in the project. According to past records, Wireless Communications Ltd had proposed some trade-offs to be made among the problem solutions but their proposals were rejected by Mobile Computing Ltd. It is regrettable that these conflicts could not be resolved. Consequently, this interesting and challenging project is still lying in an office drawer somewhere.

(a) What are human factors (ergonomics) that might have been considered when manufacturing the mobile?

(b) According to case study, the "design description document" produced at the end of the study phase was circulated among team members directly concerned with that document. Provide a discussion of the typical contents of this certificate.

(c) What is concurrent engineering? Describe how concurrent engineering might have been used to make the project feasible.

(d) What do you realize by term "trade-off"?

(e) Describe relationship between trade-off and risk-analysis.

 

Reference no: EM13348815

Questions Cloud

Qn 1a write a simple definition of child safety : question 1a write a simple definition of child safety. b outline essential
Question 1with the rise of leisure and entertainment in : question 1with the rise of leisure and entertainment in tourist destinations coastal development projects have the
Question 1a list the 5 steps in development of an : question 1a list the 5 steps in development of an environmental management systemb describe fully the steps involved
Question 1a explain meaning of contingency fee as it : question 1a explain meaning of contingency fee as it applies to project management. demonstrate your answer.b once
Questionthe solar mobile project looking back solar mobile : questionthe solar mobile project looking back solar mobile mobiles that works using light like solar calculators
Question 1 preparation is considered to be a key process in : question 1 preparation is considered to be a key process in project management. examine the key areas which form part
Question 1project management is considered to be a process : question 1project management is considered to be a process and there are four key elements of process namely-1.
Question 1in view of growing number of deaths on the road : question 1in view of growing number of deaths on the road the police department plans to introduce more speeding
Question 1 a inscribe detailed notes related to : question 1 a inscribe detailed notes related to object-oriented concepts on the following-i class and object

Reviews

Write a Review

Project Management Questions & Answers

  What the health care profession legal and moral stance

What the health care profession legal and moral stance

  Evaluating functional employee on technical performance

Can the project manager effectively evaluate the functional employee on technical performance?

  Show the project management question

What should be your competitive priorities and what capabilities do you want to develop in your own core and support processes?

  Calculate potential financial implication

Develop a plan to calculate potential financial implications for a nationwide company of your choice. Provide a scenario in which a break-even sales analysis for reactive pricing would be the best option for a company.

  Question related to systems analysis

Prepare a paper that analyzes an IT work-related project or fictitious project using systems analysis for a selected business system at the department or division level.

  Forecast the cash flows generated by project

First, Forecast the cash flows generated by project X over its economic life. Second, determine the appropriate opportunity cost of capital(r).

  Students arrive at the student services counter

Students arrive at the student services counter at an average of one every 15 minutes. Each request takes on average 12 minutes to be processed.

  Globalcom products spam filter

The Globalcom product's spam filter requires a different network configuration than is currently in place for the network

  Capability index (cpk) formulas to compute the two values

You have just used the capability index (Cpk) formulas to compute the two values "min [2, 2.5]." Which of the following is the proper interpretation of these numbers?

  Draw a network for the project using aon method

Draw a network for the project using AON method and evaluate the critical paths and identify them by double lining the arrows connecting the activities on the CP

  Explain what challenges might the foreign managers face

Explain what challenges might the foreign managers face while communicating with the home base and justify your answer with examples and reasoning.

  Computing projects expected to earn

The projects are of equal risk, of 1.6. The risk-free rate is 7% and the market rate is expected to be 12%. The projects are expected to earn as follows.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd