Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
QUESTION
A furniture manufacturer produces two types of desks: Standard and Executive. These desks are then sold at Rs 300 for the Standard type and Rs 330 for the Executive type to an office furniture wholesaler; there is an unlimited market for any mix of these desks, at least within the manufacturer's production capacity. Each desk has to go through four basic operations: cutting of the timber, joining of the pieces, pre-finishing and final finish. Each unit of the Standard desk produced takes 48 minutes of cutting time, 2 hours of joining, 40 minutes of pre-finishing and 4 hours of final finishing time. Each unit of the Executive desk required 72 minutes of cutting, 3 hours of joining, 2 hours of prefinishing and 5 hours and 20 minutes of final finishing time. The daily capacity for each operation amounts to 16 hours of cutting, 30 hours of joining, 16 hours of pre-finishing and 64 hours of final finishing time. It costs the furniture manufacturer Rs 260 and Rs 280 to produce one unit of Standard desk and one unit of Executive desk respectively
(a) Formulate the linear programming model for this problem
(b) Plot a graph indicating and labelling clearly all the constraints, the feasible region (R) and the optimal point (X)
(c) Determine the product mix that will maximise the total revenue using the corner point method
The Shortest Job Next (SJN) algorithm queues processes in a way that the ones that use the shortest CPU cycle will be selected for running rst.
Develop a user mode command interpreter which support list-short.
Analysis and implementation of algorithms for memory allocation in operating system, Explain First-t and best-t methods are used in memory allocation in operating systems.
Forking the child process
Write a multi-threaded program to solve producer and consumer problem
n a competitive market place (pure competition) is it possible to continually sell your product at a price above the average cost of production.
Simulate the long-term scheduler, the short-term scheduler and the I/O scheduler of the computer using the First-Come-First-Serve algorithm.
Research paper discussing the issues with Trusted Platform Module (TPM)
Explain a complication that concurrent processing adds to an operating system.
Use the semaphore methods to control the concurrency of the solution
Virtual machines supported by a host operating system
Discuss an application that would benefit from the use of barrier synchronization
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd