Reference no: EM1393666
Penultimate Support Systems makes fairly good speaker and equipment support stands for music groups. The assembly process involves two operations: (1) fabrication, or cutting aluminum tubing to the correct lengths, and (2) assembly, with purchased fasteners and injection-molded plastic parts. Set-up time for assembly is negligible. Fabrication set-up time and run-time per unit, assembly run-time per unit, and the production schedule for next week follow. Organize the work to minimize makespan (the time it takes to complete the product) and idle time, and create a Gantt chart. Can this work be accomplished in two 40-hour shifts? At Penultimate, it is normal practice to complete lots in one process before sending them to a following process.
Fabrication Assembly
Setup Run Time Run Time
Model Quantity (hrs.) (hrs/unit) (hrs/unit)
A 200 2 0.050 0.040
B 300 3 0.070 0.100
C 100 1 0.050 0.120
D 250 2 0.064 0.060
Use "Johnson's Rule" which is an approach for multiple jobs (the different models in our example) on two distinct processes or tools, as in this case - Fabrication and Assembly:
Johnson's Rule consists of the following steps:
1. List the operation time (combined setup and run times) for each job on both processes.
2. Select the shortest operation time.
3. If the shortest time is for the first process, do the job first; if it is for the second process, do the job last.
4. Repeat Steps 2 & 3 for each remaining job until the schedule is complete.
Which of these common problems did you encounter most often
: Imagine you were developing a software package for your industry's intranet. Provide e.g. of the various types of costs (labour, materials, equipment also facilities, subcontractors, etc.) also explain how they would apply to your project.
|
Computing break even point in sales
: You're interested in determining the volume of sales dollars necessary for the coming year to reach the break-even point. You've decided to break down the sales for the club into four categories, they are as follows:
|
Discuss the relationship between the processes of continuous
: Think of an e.g. of parametric estimating in your personal experience, like the use of a cost multiplier based on a similar, past cost. Did parametric estimating work or not? Discuss the reasons explain why.
|
Genetic resistance to enterobacter and klebsiella
: Discuss and briefly explain the three processes that would explain how pseudomonas could transfer its genetic resistance to Enterobacter and Klebsiella.
|
Question on gantt chart
: Penultimate Support Systems makes fairly good speaker and equipment support stands for music groups. The assembly process involves two operations
|
Explain how has the global economy affected
: Would you prefer the use of bottom up or top down budgeting for project cost control? Illustrate what are the advantages also disadvantages with each approach.
|
Multiple choice questions - neuroscience
: Determine which of the following correctly describes how myelination alters the passive properties of the neuronal membrane?
|
Did parametric estimating work or not
: Think of an e.g. of parametric estimating in your personal experience, like the use of a cost multiplier based on a similar, past cost. Did parametric estimating work or not? Discuss the reasons explain why.
|
Illustrate what is the nominal yield of the bond
: Consider the common problems with project cost estimation also recall a project with which you have been involved. Which of these common problems did you encounter most often? Explain why.
|