QUESTION 1

As an estimator in a construction firm, you have been instructed to include only the costs relating to labour, material and plant in your calculations for the unit rates for a bill of quantities. You should assume that the required labour is readily available and that wage rates are stable.

Discuss and use examples to explain the specific factors that you will need to consider when pricing the following items in the bill of quantities:

a. foundation excavation;

b. disposal of excavated material.

QUESTION 2

With reference to the estimating data contained in Appendix A, build up rates and establish the cost of the following items contained in a bill of quantities:

Item

Description

Quantity

Unit

Rate
(£)

Item
cost (£)

A

Excavation commencing 150mm below original ground level, foundation excavation maximum depth not exceeding 2.00m

40

,

E

 

 

 

 

 

 

 

 

B

In situ concrete 1:2:4 mix horizontal work, less than 300mm thick in structures, foundation, poured against face of earth

10

M3

 

 

 

 

 

 

 

 

C

Common brickwork, walls, half brick thick in stretcher bond, skins of hollow walls in cement mortar (1:4)

30

m2

 

 

Allocation of marks
• Item A
• Item B
• Item C
• Cost of bill of quantities items
• Clear presentation and inclusion of all supporting calculations.

139_disposal of excavated material1.png

QUESTION 3

You are a director in a construction firm and are assessing the mark-up to he added to the estimated costs which have been established. this assesment will then be considered by the other director prior ro finalisation and submission or the tender.

You have obtained information relating to a similar project completed in the past, together with some relevant information relating to the current tender as detailed in Appendix R. where information is not provided, you should make and clearly slate , your assumptions.

In a briefing paper to be rerained on file For future use bx the firm pro. provide your recommendation with regard to the mark-up to be added ro the tender, including explanatory infomation to support this recommendation.

932_Disposal of excavated material.png

Verified Expert

Reference no: EM13371611

Questions Cloud

Write a letter to the editor of a newspaper showing your : write a letter to the editor of a newspaper showing your concern for the lack of safety of children in school buse and
Exploring the marketing and sales strategies utilised by : exploring the marketing and sales strategies utilised by your organisation or one you have researched determine to what
Part- a1write down the principle of energy conversion2give : part- a1.write down the principle of energy conversion.2.give an example for single and double excited system.3.define
Question 1billy bristol has a job working as a skilled : question 1billy bristol has a job working as a skilled labourer for a business which builds home extensions and does
Question 1as an estimator in a construction firm you have : question 1as an estimator in a construction firm you have been instructed to include only the costs relating to labour
Question 1the primary reason for the incredible success of : question 1the primary reason for the incredible success of viruses in their incredible diversity. the primary sources
Q 1 the banking market in athens ohio currently has four : q. 1 the banking market in athens ohio currently has four banks with market shares of 60 20 15 and 5. the two smallest
The represents the potential outcomes of your first salary : the represents the potential outcomes of your first salary negotiation after graduation assuming this is a sequential
Subject the ancient world in cinemachoose any two movies : subject the ancient world in cinema.choose any two movies about romantic antiquity and compare one or two passages from

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate size of the initial flaw that will cause failure

A high strength steel is developed with a yield stress of 1460 MPa and a critical stress intensity factor of 30MPa(m)^0.5. Calculate the size of the initial flaw that will cause failure in an infinite plate when the load applied is 50% of the load..

  Compute the effective vertical stress when the tank is empty

Essentials of Soil Mechanics and Foundations 7th Edition David McCarthy An oil storage tank 50 ft in diameter imposes a maximum loading of 2500 psf onto the ground surface where the tank is supported.

  Determine the station where tangent runout starts

The station of a PI of a horizental curve is 60+20. The horizental curve has a degree of 4 and a length of 400ft. the othere given design perameters include. Superelevation runoff rate is 1/400. width of the pavement is is 15ft.

  What is the future worth of per year of each plan at age 85

Mike and Susan hope to retire a few years early, they decided to pay closer attention to the predicted amount of retirement benefits and do some analyses on the numbers.

  What is the pressure applied to the soil under above load

what is the pressure applied to the soil under the above load. How does this compare with an allowable bearing capacity of 100kPa. Does this allow for a reasonable factor of safety.

  What would be the reading on a barometer containing benzene

What would be the reading on a barometer containing Benzene at 20 degrees Celsius at a time when the atmospheric pressure was equivalent to 12.3 m of water

  Estimate the viscosity of water at 30 degree c

The dynamic viscosity of water at 20°C is 1.00 x 10-3 N-s/m2, and the viscosity at 40°C is 6.53 x 10-4 N-s/m2. Estimate the viscosity at 30°C.

  Find the swell and shrinkage and load and shrinkage factors

material (LCY) in 12 yard dump trucks, placing it, and compacting the weight of the soil is 3,750 lb/cu.yd. (30 pts.) (show your calculations) a) Find the Swell and Shrinkage b) Load and Shrinkage Factors

  Design hardwood beam to support a uniformly distributed load

Design a hardwood beam to support a uniformly distributed load of 20 kN over a simply supported span of 8 m. consider bending strength only. Assume that the weight of the beam is 2 kN.

  Find percentage of air voids and voids in mineral aggregates

Find the percentage of Air voids and voids in the mineral aggregate if the asphalt absorption is .5%, and the specific gravities of the aggregate and binder are 2.660 and 1.020 respectively. The unit weight of the mixture is 2.39 Mg/m^3

  Develop a simple urban constructed wetland design

develop a simple urban constructed wetland design guidelines and drawings. your report should include the followingi.

  Why the highest head of the water in the excavation

why the highest head of the water in the excavation is mathematically guaranteed to occur on the edge of the excavation. explain in mathematical and/or physical.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd