Question 1 the terminal company is attempting to balance

Assignment Help Operation Management
Reference no: EM13380401

Question 1:

The Terminal Company is attempting to balance its assembly line of high-voltage electrical connectors. The desired output for the line is 50 connectors per hour, and the information on the work elements for this assembly line is as follows.

Work

Elements

Time (sec)

Immediate Predecessor(s)

A

40

--

B

36

A

C

20

A

D

25

A

E

30

B, C

F

34

D

G

35

E

H

 5

F

I

15

E, H

J

40

H

K

38

G, I, J

Use the information from Table 7.15 to balance this line. What is the most efficient solution?

Question 2

The Terminal Company is attempting to balance its assembly line of high-voltage electrical connectors. The desired output for the line is 50 connectors per hour, and the information on the work elements for this assembly line is as follows.

Work

Elements

Time (sec)

Immediate Predecessor(s)

A

40

--

B

36

A

C

20

A

D

25

A

E

30

B, C

F

34

D

G

35

E

H

 5

F

I

15

E, H

J

40

H

K

38

G, I, J


----------------------------------------------------------------------------------

 Use the information from Table 7.15 and the most efficient line balance possible. What work elements are included in the first station?

Question 3

The Terminal Company is attempting to balance its assembly line of high-voltage electrical connectors. The desired output for the line is 50 connectors per hour, and the information on the work elements for this assembly line is as follows.

Work

Elements

Time (sec)

Immediate Predecessor(s)

A

40

--

B

36

A

C

20

A

D

25

A

E

30

B, C

F

34

D

G

35

E

H

 5

F

I

15

E, H

J

40

H

K

38

G, I, J


----------------------------------------------------------------------------------

Use the information from Table 7.15, and assume that the most efficient line balance possible ha been achieved. What is the total idle time for an eight hour work day? 

Question 4

  1. 112. The production of a particular product consists of the following work elements. If the cycle time is 4 minutes and the work-element times are as follows, what is the theoretical minimum number of stations?

Work 

Time (min)

Element

1

2.4

2

0.5

3

2.1

4

2

5

2.7

6

1.1

7

2

8

2.7

9

1.6

10

1.4

   Question 5

  1.  Fun Vehicles, Inc. makes beach buggies on an assembly line. The total productive time to make one buggy is 300 seconds. The current line has a 90-second cycle time and consists of four workstations. The balance delay of this line must be

Question 6

An assembly line has to perform 10 work elements, whose time requirements follow. An operations analyst has found a solution using some heuristics, as shown in the table. If the cycle time of the line is 90 seconds, what is the efficiency of the assembly line?

 

 

Solution

Work

Elements

Time (sec)

 

Station

Work Elements Assigned

A

45

1

A, B, C

B

30

2

D, E

C

15

3

F, H

D

30

4

G, I

E

50

5

J

F

40

 

 

G

30

 

 

H

30

 

 

I

60

 

 

J

80

 

 

Question 7

  1. Table 7.13

The following information is given about an assembly line. The desired output rate is 90 units per hour.

Work

Element

Time

 (sec)

Immediate

Predecessor(s)

A

10

--

B

6

A

C

15

A

D

20

B

E

12

B

F

14

C, E

G

8

D

H

20

F, G

----------------------------------------------------------------------------------------

Use the information in Table 7.13. What is the fewest number of workstations that you need?

Question 8

The following information is given about an assembly line. The desired output rate is 90 units per hour.

Work

Element

Time

 (sec)

Immediate

Predecessor(s)

A

10

--

B

6

A

C

15

A

D

20

B

E

12

B

F

14

C, E

G

8

D

H

20

F, G

 
------------------------------------------------------------------------------------------

Use the information in Table 7.13. Suppose that the desired output rate is increased to 120 units per hour and a solution has been found that has four workstations. What is the efficiency of this new assembly line?

Question 9

A company makes four products that have the following characteristics: Product A sells for $75 but needs $20 of materials and $20 of labor to produce; Product B sells for $90 but needs $45 of materials and $20 of labor to produce; Product C sells for $110 but needs $50 of materials and $30 of labor to produce; Product D sells for $135 but needs $75 of materials and $40 of labor to produce. The processing requirements for each product on each of the four machines are shown in the table.

 

Processing Time (min/unit)

Work Center

A

B

C

D

W

8

4

12

10

X

12

9

10

6

Y

8

12

14

5

Z

10

9

5

5

Work centers W, X, Y, and Z are available for 40 hours per week and have no setup time when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.

Question 10

A company makes four products that have the following characteristics: Product A sells for $75 but needs $20 of materials and $20 of labor to produce; Product B sells for $90 but needs $45 of materials and $20 of labor to produce; Product C sells for $110 but needs $50 of materials and $30 of labor to produce; Product D sells for $135 but needs $75 of materials and $40 of labor to produce. The processing requirements for each product on each of the four machines are shown in the table.

 

Processing Time (min/unit)

Work Center

A

B

C

D

W

8

4

12

10

X

12

9

10

6

Y

8

12

14

5

Z

10

9

5

5

Work centers W, X, Y, and Z are available for 40 hours per week and have no setup time when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.

Reference no: EM13380401

Questions Cloud

Write three pages about dns and how we use dns within a : write three pages about dns and how we use dns within a windows server 2008 environment. in your paper please focus
1 consider the following code fragment for the mips five : 1. consider the following code fragment for the mips five stage pipelined processorinstruction1 add 1 8 3 1 8
Find the x-and y-intercepts ofline represented by the : find the x-and y-intercepts ofline represented by the equatics with stepy by step instructions and explained in
Question 1 a single ticket taker can tear tickets and : question 1 a single ticket taker can tear tickets and direct movie patrons to their seats at a rate of 90 per
Question 1 the terminal company is attempting to balance : question 1 the terminal company is attempting to balance its assembly line of high-voltage electrical connectors. the
S900 team development please write 1000 wordsin 1965 bruce : s900 team development please write 1000 wordsin 1965 bruce tuckman proposed four stages of group development. after his
I900 nbspmanaging diverse virtual teams nbspplease write : i900 nbspmanaging diverse virtual teams nbspplease write 1000 wordsas organisations merge and grow in a global
Question 1 the summerville vitamin company manufactures : question 1 the summerville vitamin company manufactures bottles of animal-shaped chewable vitamins for children. this
1 student tuition at abc university is 150 per semester : 1. student tuition at abc university is 150 per semester credit hour. the state supplements school revenue by matching

Reviews

Write a Review

Operation Management Questions & Answers

  Book review - the goal

Operations Management is about a book review. Title of the book is "Goal". This book has been written by Dr. Eliyahu Goldartt. The book has been appreciated by many as one of those books which offers an insight into the operations and strategic capac..

  Operational plan in hospitality enterprise

Operational plan pertaining to a hospitality enterprise is given in detail in the solution. The operational plan is an important plan or preparation which gives guidelines regarding the role and responsibilities of each and every operation at all lev..

  Managing operations and information

Recognise the importance of a strategic approach to the development and deployment of organisational information systems. Demonstrate an understanding of the importance of databases and their integration to the organisation's overall information mana..

  A make-or-buy analysis

An analysis of the holding costs, including the appropriate annual holding cost rate.

  Evolution and contributor of operations management

Briefly explain Evolution and contributor of Operations management.

  Functions and responsibilities of an operations manager

A number of drivers of change have transformed the roles, functions and responsibilities of an operations manager over recent years. These drivers have not only been based on technological innovations but also on the need for organisations to develop..

  Compute the optimal order quantity

Compute the Optimal Order quantity of DVD players. Determine the appropriate reorder point.

  Relationship to operations practice in the organisation

Evaluate problems in operations and identify approaches to overcoming them. Critically evaluate operating plans and identify areas for improvement. Justify, implement and evaluate changes to operations in line with modern approaches.

  A make or buy analysis

Develop a report for Figi Fabricating that will address the question of whether the company should continue to purchase the part from the supplier or begin to produce the part itself.

  Prepare a staffing plan

Prepare a staffing plan showing the change of your unit from medical/surgical staffing to oncology staffing.

  Leadership styles in different organizations

Ccompare the effectiveness of different leadership styles in different organizations

  Risk management tools and models

Be able to understand the concept of risk, roles and responsibilities for risk management and risk management tools and models.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd