Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
The rated speed of drum B of a belt sander is 2400 rpm. When the power is turned off it is observed that the sander coasts from its rated speed to rest in 10 s. Assuming uniformly decelerated motion, determine the velocity and acceleration of point C of the belt, (a) immediately before the power is turned off. (b) 9 s later.
A 1600 ft long sag verical curve (equal tangent) has a pvc at station 1200+00 and elevation o 1500 ft. the initial grade is -3.5% and the final grade is 6.5%. determine the elevation and stationing of the low point, pvi and pvt.
Differentiate between construction loan and mortgage loan based on your understanding (using your own words). Define the following terms in your own words: (a) cap rate, (b) economic value of a project, and (c) gap financing.
You are a real estate salesperson working for Good Earth, Realtors, Inc. You receive 50 percent of all commissions received by the firm (net of MLS fees) for which you were either the listing agent or the selling agent.
Determine the minimum distance from the diversion that a road sign should be located informing drivers of the temporary change on the highway. The letter height on the road sign is 5 inches.
the maximum degree of curvature can be at most 6.0 and the superelevation can be at most +6.0%. Design the ramp for the highest horizontal curve design speed given the constraints.
The 3.5mg engine is suspended from a 500 kg spreader beam and hoisted by a crane which gives it an acceleration of 4m/s^2 when it has a velocity of 2m/s. determine the force in chains AC and AD during the lift.
Assume that during the analyze stage an obvious solution is discovered. Should that solution be immediately implemented and the remaining steps of DMAIC abandoned?
The ship has a total weight of 155,000 tons, length = 1,600 feet and a beam = 150 feet (assume that it is the shape of a rectangular box). Calculate the height above the waterline of its center of Gravity (G).
A slurry containing 20 percent by weight of limestone (CaCO 3 ) is processes to separate pure dry limestone from water. If feed rate is 2000kg/h, how much CaCO 3 is produced per hour?
The saturated unit weight of the clay is 20kN/m 3 and that of the sand 19 kN/m 3 ; above the water table the unit weight of the sand is 16.5 kN/m 3 . Calculate the effective vertical stresses at the top and bottom of the clay layer.
Determine total delay, maximum queue length, and the time that the 20th vehicle to arrive waits from its arrival to its departure.
A tub of a washing machine is rotating at 50 rad/s when the power is turned off. If it takes 15s for the tub to come to rest, determine (a) the constant angular deceleration, and (b) the total number of revolutions the tub makes.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd